82 resultados para study project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Uncertainty contributes a major part in the accuracy of a decision-making process while its inconsistency is always difficult to be solved by existing decision-making tools. Entropy has been proved to be useful to evaluate the inconsistency of uncertainty among different respondents. The study demonstrates an entropy-based financial decision support system called e-FDSS. This integrated system provides decision support to evaluate attributes (funding options and multiple risks) available in projects. Fuzzy logic theory is included in the system to deal with the qualitative aspect of these options and risks. An adaptive genetic algorithm (AGA) is also employed to solve the decision algorithm in the system in order to provide optimal and consistent rates to these attributes. Seven simplified and parallel projects from a Hong Kong construction small and medium enterprise (SME) were assessed to evaluate the system. The result shows that the system calculates risk adjusted discount rates (RADR) of projects in an objective way. These rates discount project cash flow impartially. Inconsistency of uncertainty is also successfully evaluated by the use of the entropy method. Finally, the system identifies the favourable funding options that are managed by a scheme called SME Loan Guarantee Scheme (SGS). Based on these results, resource allocation could then be optimized and the best time to start a new project could also be identified throughout the overall project life cycle.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The paper draws on a research project on innovative provision in an FE college for excluded and disaffected young people. The college offers places on vocational courses to students who are still of compulsory school age who have been excluded by or have persistently failed to attend or achieve in school. One set of themes to emerge relates to the experiences of the students: the role of personal relationships and, especially, relationships with teachers, in the breakdown of school placements; the importance both of good relationships with tutors, often expressed as 'being treated like an adult', and of a vocational and practical curriculum in successful re-engagement at college; and positive but highly instrumental and employment related attitudes to education. Another set of themes relates to the practical and organisational difficulties and the way that a lack of flexibility in 14-19 provision, especially while students are still of compulsory school age, creates difficulties for programmes of this kind. Finally the paper considers the tensions between pressures for accountability and outcome-driven measures and the aims of increasing participation and using education to address issues of social inclusion.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Since 1995 the Directive 93/43/EEC prescribes the application of HACCP principles in food production. However, despite the major importance of food safety, there is a fundamental lack of information on the economic impact of this directive. This project aims to study costs and benefits of HACCP, including the impact of HACCP on public health. Due to the complexity of the issue, we propose to start with a pilot study, limited to dairy and meat products industry in NL, UK and I. Information will be obtained at two levels: production chain and public health. Integration of these results will result in recommendations at the levels of EU member states and industry for regulation and supporting measures, and in recommendations for an effective and efficient approach for a more comprehensive project on costs and benefits of HACCP, covering major parts of the food industry in EU member states.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective: To evaluate the bifidogenic efficacy of two inulin doses in healthy human adults. Design: A double-blind, placebo-controlled, crossover human study. Setting: Food Microbial Sciences Unit, The University of Reading, Reading, UK. Subjects: Thirty healthy volunteers, 15 men, 15 women ( age range 19-35). Interventions: Subjects consumed a chocolate drink containing placebo ( maltodextrin, 8 g/day), 5 g/day inulin and 8 g/day inulin for a 2-week treatment period. Each treatment was followed by a 1-week washout at the end of which volunteers progressed to the next treatment. Faecal samples were obtained at the start of the study ( baseline) and at the end of each treatment and washout period. Fluorescent in situ hybridization was used to monitor populations of Bifidobacterium genus, Bacteroides - Prevotella, Lactobacillus - Enterococcus and Clostridium perfringens - histolyticum subgroup. Results: Bifidobacterial levels increased significantly upon ingestion of both the low ( 9.78 +/- 0.29 log(10) cells/g faeces, P < 0.05) and the high inulin dose ( 9.79 +/- 0.38 log(10) cells/g faeces, P < 0.05) compared to placebo ( 9.64 +/- 0.23 log(10) cells/g faeces). Conclusions: Both inulin doses exhibited a bifidogenic effect but a higher volunteer percentage responded to the high dose. A dose response effect was not observed but the magnitude of increase in bifidobacteria levels depended on their initial numbers. The higher the initial concentrations the smaller was the increase upon ingestion of the active treatments. Sponsorship: Financial support for the completion of this project was provided by Sensus ( Roosendaal, The Netherlands).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Parametric software effort estimation models consisting on a single mathematical relationship suffer from poor adjustment and predictive characteristics in cases in which the historical database considered contains data coming from projects of a heterogeneous nature. The segmentation of the input domain according to clusters obtained from the database of historical projects serves as a tool for more realistic models that use several local estimation relationships. Nonetheless, it may be hypothesized that using clustering algorithms without previous consideration of the influence of well-known project attributes misses the opportunity to obtain more realistic segments. In this paper, we describe the results of an empirical study using the ISBSG-8 database and the EM clustering algorithm that studies the influence of the consideration of two process-related attributes as drivers of the clustering process: the use of engineering methodologies and the use of CASE tools. The results provide evidence that such consideration conditions significantly the final model obtained, even though the resulting predictive quality is of a similar magnitude.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A large and complex IT project may involve multiple organizations and be constrained within a temporal period. An organization is a system comprising of people, activities, processes, information, resources and goals. Understanding and modelling such a project and its interrelationship with relevant organizations are essential for organizational project planning. This paper introduces the problem articulation method (PAM) as a semiotic method for organizational infrastructure modelling. PAM offers a suite of techniques, which enables the articulation of the business, technical and organizational requirements, delivering an infrastructural framework to support the organization. It works by eliciting and formalizing (e. g. processes, activities, relationships, responsibilities, communications, resources, agents, dependencies and constraints) and mapping these abstractions to represent the manifestation of the "actual" organization. Many analysts forgo organizational modelling methods and use localized ad hoc and point solutions, but this is not amenable for organizational infrastructures modelling. A case study of the infrared atmospheric sounding interferometer (IASI) will be used to demonstrate the applicability of PAM, and to examine its relevancy and significance in dealing with the innovation and changes in the organizations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article describes work undertaken by the VERA project to investigate how archaeologists work with information technology (IT) on excavation sites. We used a diary study to research the usual patterns of behaviour of archaeologists digging the Silchester Roman town site during the summer of 2007. Although recording had previously been undertaken using pen and paper, during the 2007 season a part of the dig was dedicated to trials of IT and archaeologists used digital pens and paper and Nokia N800 handheld PDAs to record their work. The goal of the trial was to see whether it was possible to record data from the dig whilst still on site, rather than waiting until after the excavation to enter it into the Integrated Archaeological Database (IADB) and to determine whether the archaeologists found the new technology helpful. The digital pens were a success, however, the N800s were not successful given the extreme conditions on site. Our findings confirmed that it was important that technology should fit in well with the work being undertaken rather than being used for its own sake, and should respect established work flows. We also found that the quality of data being entered was a recurrent concern as was the reliability of the infrastructure and equipment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: This study was carried out as part of a European Union funded project (PharmDIS-e+), to develop and evaluate software aimed at assisting physicians with drug dosing. A drug that causes particular problems with drug dosing in primary care is digoxin because of its narrow therapeutic range and low therapeutic index. Objectives: To determine (i) accuracy of the PharmDIS-e+ software for predicting serum digoxin levels in patients who are taking this drug regularly; (ii) whether there are statistically significant differences between predicted digoxin levels and those measured by a laboratory and (iii) whether there are differences between doses prescribed by general practitioners and those suggested by the program. Methods: We needed 45 patients to have 95% Power to reject the null hypothesis that the mean serum digoxin concentration was within 10% of the mean predicted digoxin concentration. Patients were recruited from two general practices and had been taking digoxin for at least 4 months. Exclusion criteria were dementia, low adherence to digoxin and use of other medications known to interact to a clinically important extent with digoxin. Results: Forty-five patients were recruited. There was a correlation of 0·65 between measured and predicted digoxin concentrations (P < 0·001). The mean difference was 0·12 μg/L (SD 0·26; 95% CI 0·04, 0·19, P = 0·005). Forty-seven per cent of the patients were prescribed the same dose as recommended by the software, 44% were prescribed a higher dose and 9% a lower dose than recommended. Conclusion: PharmDIS-e+ software was able to predict serum digoxin levels with acceptable accuracy in most patients.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trees outside forests (TOF) in Nepal’s Terai have significantly increased over the past decade. The Chitwan District was one of the focus districts in the Terai Community Forestry Development Project that promoted a tree seedling distribution program. This paper examines the current position of tree integration on farmland and its contribution to livelihoods of rural households in this district. Interviews with local key informants, government and non-government agencies and woodbased industries, as well as an in-depth study of 32 households were used to describe the constraints faced by the households in management of trees on farmland. Most households cited disease, poor growth, lack of preferred tree species, lack of technical support, an uncertain tree market, and lack of financial support as constraints. Despite the important role of trees in subsistence and marketbased rural livelihood diversification, and the consequent reduction in pressure on national forests from on-farm trees, current government policies and practices fail to recognise the value of these trees. It is argued that there is substantial potential for improving on-farm trees to enhance rural livelihoods. A responsive service mechanism centred on tree growing households would help the management of tree resources on the farmland.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background Autism spectrum disorder (ASD) was once considered to be highly associated with intellectual disability and to show a characteristic IQ profile, with strengths in performance over verbal abilities and a distinctive pattern of ‘peaks’ and ‘troughs’ at the subtest level. However, there are few data from epidemiological studies. Method Comprehensive clinical assessments were conducted with 156 children aged 10–14 years [mean (s.d.)=11.7 (0.9)], seen as part of an epidemiological study (81 childhood autism, 75 other ASD). A sample weighting procedure enabled us to estimate characteristics of the total ASD population. Results Of the 75 children with ASD, 55% had an intellectual disability (IQ<70) but only 16% had moderate to severe intellectual disability (IQ<50); 28% had average intelligence (115>IQ>85) but only 3% were of above average intelligence (IQ>115). There was some evidence for a clinically significant Performance/Verbal IQ (PIQ/VIQ) discrepancy but discrepant verbal versus performance skills were not associated with a particular pattern of symptoms, as has been reported previously. There was mixed evidence of a characteristic subtest profile: whereas some previously reported patterns were supported (e.g. poor Comprehension), others were not (e.g. no ‘peak’ in Block Design). Adaptive skills were significantly lower than IQ and were associated with severity of early social impairment and also IQ. Conclusions In this epidemiological sample, ASD was less strongly associated with intellectual disability than traditionally held and there was only limited evidence of a distinctive IQ profile. Adaptive outcome was significantly impaired even for those children of average intelligence.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the emerging digital economy, the management of information in aerospace and construction organisations is facing a particular challenge due to the ever-increasing volume of information and the extensive use of information and communication technologies (ICTs). This paper addresses the problems of information overload and the value of information in both industries by providing some cross-disciplinary insights. In particular it identifies major issues and challenges in the current information evaluation practice in these two industries. Interviews were conducted to get a spectrum of industrial perspectives (director/strategic, project management and ICT/document management) on these issues in particular to information storage and retrieval strategies and the contrasting approaches to knowledge and information management of personalisation and codification. Industry feedback was collected by a follow-up workshop to strengthen the findings of the research. An information-handling agenda is outlined for the development of a future Information Evaluation Methodology (IEM) which could facilitate the practice of the codification of high-value information in order to support through-life knowledge and information management (K&IM) practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There are a number of challenges associated with managing knowledge and information in construction organizations delivering major capital assets. These include the ever-increasing volumes of information, losing people because of retirement or competitors, the continuously changing nature of information, lack of methods on eliciting useful knowledge, development of new information technologies and changes in management and innovation practices. Existing tools and methodologies for valuing intangible assets in fields such as engineering, project management and financial, accounting, do not address fully the issues associated with the valuation of information and knowledge. Information is rarely recorded in a way that a document can be valued, when either produced or subsequently retrieved and re-used. In addition there is a wealth of tacit personal knowledge which, if codified into documentary information, may prove to be very valuable to operators of the finished asset or future designers. This paper addresses the problem of information overload and identifies the differences between data, information and knowledge. An exploratory study was conducted with a leading construction consultant examining three perspectives (business, project management and document management) by structured interviews and specifically how to value information in practical terms. Major challenges in information management are identified. An through-life Information Evaluation methodology (IEM) is presented to reduce information overload and to make the information more valuable in the future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Uncertainty affects all aspects of the property market but one area where the impact of uncertainty is particularly significant is within feasibility analyses. Any development is impacted by differences between market conditions at the conception of the project and the market realities at the time of completion. The feasibility study needs to address the possible outcomes based on an understanding of the current market. This requires the appraiser to forecast the most likely outcome relating to the sale price of the completed development, the construction costs and the timing of both. It also requires the appraiser to understand the impact of finance on the project. All these issues are time sensitive and analysis needs to be undertaken to show the impact of time to the viability of the project. The future is uncertain and a full feasibility analysis should be able to model the upside and downside risk pertaining to a range of possible outcomes. Feasibility studies are extensively used in Italy to determine land value but they tend to be single point analysis based upon a single set of “likely” inputs. In this paper we look at the practical impact of uncertainty in variables using a simulation model (Crystal Ball ©) with an actual case study of an urban redevelopment plan for an Italian Municipality. This allows the appraiser to address the issues of uncertainty involved and thus provide the decision maker with a better understanding of the risk of development. This technique is then refined using a “two-dimensional technique” to distinguish between “uncertainty” and “variability” and thus create a more robust model.