130 resultados para construction project teams


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry has incurred a considerable amount of waste as a result of poor logistics supply chain network management. Therefore, managing logistics in the construction industry is critical. An effective logistic system ensures delivery of the right products and services to the right players at the right time while minimising costs and rewarding all sectors based on value added to the supply chain. This paper reports on an on-going research study on the concept of context-aware services delivery in the construction project supply chain logistics. As part of the emerging wireless technologies, an Intelligent Wireless Web (IWW) using context-aware computing capability represents the next generation ICT application to construction-logistics management. This intelligent system has the potential of serving and improving the construction logistics through access to context-specific data, information and services. Existing mobile communication deployments in the construction industry rely on static modes of information delivery and do not take into account the worker’s changing context and dynamic project conditions. The major problems in these applications are lack of context-specificity in the distribution of information, services and other project resources, and lack of cohesion with the existing desktop based ICT infrastructure. The research works focus on identifying the context dimension such as user context, environmental context and project context, selection of technologies to capture context-parameters such wireless sensors and RFID, selection of supporting technologies such as wireless communication, Semantic Web, Web Services, agents, etc. The process of integration of Context-Aware Computing and Web-Services to facilitate the creation of intelligent collaboration environment for managing construction logistics will take into account all the necessary critical parameters such as storage, transportation, distribution, assembly, etc. within off and on-site project.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A whole life-cycle information management vision is proposed, the organizational requirements for the realization of the scenario is investigated. Preliminary interviews with construction professionals are reported. Discontinuities at information transfer throughout life-cycle of built environments are resulting from lack of coordination and multiple data collection/storage practices. A more coherent history of these activities can improve the work practices of various teams by augmenting decision making processes and creating organizational learning opportunities. Therefore, there is a need for unifying these fragmented bits of data to create a meaningful, semantically rich and standardized information repository for built environment. The proposed vision utilizes embedded technologies and distributed building information models. Two diverse construction project types (large one-off design, small repetitive design) are investigated for the applicability of the vision. A functional prototype software/hardware system for demonstrating the practical use of this vision is developed and discussed. Plans for case-studies for validating the proposed model at a large PFI hospital and housing association projects are discussed.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Innovation is notoriously difficult to define and is invariably intertwined with issues of knowledge creation, continuous improvement and organisational change. An extensive literature classifies numerous types of innovation and militates against any simplistic attempt at definition. It is widely accepted that innovation is at least partly dependent upon the surrounding environment. Industry recipes and institutionally embedded practices shape the environment within which innovation occurs. Recent research directions have addressed the diffusion of innovation and its dependence upon social and institutional structures. In this respect, it is highly pertinent to compare the way that innovation is interpreted and enacted in different industrial sectors. The comparison between UK aerospace and construction is especially revealing because the two sectors are so different and therefore constitute radically different climates for innovation. Empirical research is reported based on semi-structured interviews with practitioners from both sectors. Interpretations of innovation are found to differ dramatically between aerospace and construction. Within the context of an ongoing struggle to define innovation, both industries are striving to become more innovative. The aerospace sector is found to emphasise technical innovation whereas the construction sector emphasises process innovation. An overriding cultural bias in Western economies towards technological innovation results in the common perception that aerospace is much more innovative than construction. The experienced realities of practitioners in the two sectors are much more complex.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This article considers how visual practices are used to manage knowledge in project-based work. It compares project-based work in a capital goods manufacturer and an architectural firm. Visual representations are used extensively in both cases, but the nature of visual practice differs significantly between the two. The research explores the kinds of knowledge that are (and aren't) developed and made visible in strategizing and planning activities. For example, whereas the emphasis of project-based work in the former firm is on exploitation of knowledge and it visualizes its project context largely in commercial and processual terms, the emphasis in the latter is on exploration and it uses a wide range of visual materials to understand physical interdependencies across the project boundary. We contend particular kinds of visual tools can help project teams step between exploration and exploitation within a project, and articulate the types of representations, foci of attention and patterns of interaction involved. The findings suggest that business managers can make more deliberate choices about how knowledge is made visible, and can change visual practice to align the project with exploring and exploiting opportunities. It raises the question: What don't you see within your organization? The work contributes to academic debates about managing through projects, strategising and organizing, while the focus on visual representation disrupts the tacit-codified dichotomy in the broad debate on knowledge and learning, and highlights the craft skills central to strategizing and organizing.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The state of health and safety on construction sites in Ghana was investigated using first hand observation of fourteen (14) construction project sites in 2009 and 2010. At each site, the construction project, workers and the physical environment of the site were inspected and evaluated against health and safety indicators taken from the literature. The results reveal a poor state of health and safety on Ghanaian construction sites. The primary reasons are a lack of strong institutional framework for governing construction activities and poor enforcement of health and safety policies and procedures. Also, Ghanaian society does not place a high premium on health and safety of construction workers on site. Interviews with workers indicated that injuries and accidents are common on sites. However, compensation for injury is often at the discretion of the contractor although collective bargaining agreements between Labour unions and employers prescribe obligations for the contractor in the event of injury to a worker.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Major construction clients are increasingly looking to procure built facilities on the basis of added value, rather than capital cost. Recent advances in the procurement of construction projects have emphasised a whole-life value approach to meeting the client’s objectives, with strategies put in place to encourage long-term commitment and through-life service provision. Construction firms are therefore increasingly required to take on responsibility for the operation and maintenance of the construction project on the client’s behalf - with the emphasis on value and service. This inevitably throws up a host of challenges, not the least of which is the need for construction firms to manage and accommodate the new emphasis on service. Indeed, these ‘service-led’ projects represent a new realm of construction projects where the rationale for the project is driven by client’s objectives with some aspect of service provision. This vision of downstream service delivery increases the number of stakeholders, adds to project complexity and challenges deeply-ingrained working practices. Ultimately it presents a major challenge for the construction sector. This paper sets out to unravel some of the many implications that this change brings with it. It draws upon ongoing research investigating how construction firms can adapt to a more service-orientated built environment and add value in project-based environments. The conclusions lay bare the challenges that firms face when trying to compete on the basis of added-value and service delivery. In particular, how it affects deeply-ingrained working practices and established relationships in the sector.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

From its roots in strategic management theory, stakeholder management has been adopted by the construction management academic community and applied as a valid paradigm around which research work has been generated aiming to improve project effi ciencies and effectiveness. However, academics have argued that stakeholder management should move away from purely theoretical discussions and engage more with the realities of construction project work. This paper re-appraises the stakeholder management concept for the construction domain by re-thinking some of the fundamental principles and ideals present within the more general stakeholder theory literature. It engages with issues which researchers have arguably failed to acknowledge and calls for a re-evaluation of construction stakeholder management research by presenting a review around four distinctive themes: the moral obligations of engaging with stakeholders against the business and efficiency driven imperatives of construction organisations; the contrast between theoretical abstractions and empirically grounded research; the tensions between theoretical convergence versus calls for multiple and divergent perspectives on stakeholder management and the practicalities of conducting stakeholder management in the construction domain. Such a critical re-appraisal of stakeholder management thinking both generates new lines of enquiry and promises to help inform and shape current and future industry practice.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

An alternative approach to understanding innovation is made using two intersecting ideas. The first is that successful innovation requires consideration of the social and organizational contexts in which it is located. The complex context of construction work is characterized by inter-organizational collaboration, a project-based approach and power distributed amongst collaborating organizations. The second is that innovations can be divided into two modes: ‘bounded’, where the implications of innovation are restricted within a single, coherent sphere of influence, and ‘unbounded’, where the effects of implementation spill over beyond this. Bounded innovations are adequately explained within the construction literature. However, less discussed are unbounded innovations, where many firms' collaboration is required for successful implementation, even though many innovations can be considered unbounded within construction's inter-organizational context. It is argued that unbounded innovations require an approach to understand and facilitate the interactions both within a range of actors and between the actors and technological artefacts. The insights from a sociology of technology approach can be applied to the multiplicity of negotiations and alignments that constitute the implementation of unbounded innovation. The utility of concepts from the sociology of technology, including ‘system building’ and ‘heterogeneous engineering’, is demonstrated by applying them to an empirical study of an unbounded innovation on a major construction project (the new terminal at Heathrow Airport, London, UK). This study suggests that ‘system building’ contains outcomes that are not only transformations of practices, processes and systems, but also the potential transformation of technologies themselves.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry is widely recognised as being inherent with risk and uncertainty. This necessitates the need for effective project risk management to achieve the project objectives of time, cost and quality. A popular tool employed in projects to aid in the management of risk is a risk register. This tool documents the project risks and is often employed by the Project Manager (PM) to manage the associated risks on a project. This research aims to ascertain how widely risk registers are used by Project Managers as part of their risk management practices. To achieve this aim entailed interviewing ten PMs, to discuss their use of the risk register as a risk management tool. The results from these interviews indicated the prevalent use of this document and recognised its effectiveness in the management of project risks. The findings identified the front end and feasibility phases of a project as crucial stages for using risk registers, noting it as a vital ingredient in the risk response planning of the decision making process. Moreover, the composition of the risk register was also understood, with an insight into how PMs produce and develop this tool also ascertained. In conclusion, this research signifies the extensive use of the risk register by PMs. A majority of PMs were of the view that risk registers constitute an essential component of their project risk management practices. This suggests a need for further research on the extent to which risk registers actually help PMs to control the risks in a construction project, particularly residual risks, and how this can be improved to minimize deviations from expected outcomes.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Students in the architecture, engineering, and construction disciplines are often challenged with visualizing and understanding the complex spatial and temporal relationships involved in designing and constructing three-dimensional (3D) structures. An evolving body of research traces the use of educational computer simulations to enhance student learning experiences through testing real-world scenarios and the development of student decision-making skills. Ongoing research at Pennsylvania State University aims to improve engineering education in construction through interactive construction project learning applications in an immersive virtual reality environment. This paper describes the first- and second-generation development of the Virtual Construction Simulator (VCS), a tool that enables students to simultaneously create and review construction schedules through 3D model interaction. The educational value and utility of VCS was assessed through surveys, focus group interviews, and a student exercise conducted in a construction management class. Results revealed VCS is a valuable and effective four-dimensional (4D) model creation and schedule review application that fosters collaborative work and greater student task focus. This paper concludes with a discussion of the findings and the future development steps of the VCS educational simulation

Relevância:

90.00% 90.00%

Publicador:

Resumo:

There is a renewed interest in immersive visualization to navigate digital data-sets associated with large building and infrastructure projects. Following work with a fully immersive visualization facility at the University, this paper details the development of a complementary mobile visualization environment. It articulates progress on the requirements for this facility; the overall design of hardware and software; and the laboratory testing and planning for user pilots in construction applications. Like our fixed facility, this new light-weight mobile solution enables a group of users to navigate a 3D model at a 1:1 scale and to work collaboratively with structured asset information. However it offers greater flexibility as two users can assemble and start using it at a new location within an hour. The solution has been developed and tested in a laboratory and will be piloted in engineering design review and stakeholder engagement applications on a major construction project.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Objective: To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. Background: A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. Methods: An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Results: Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. Conclusions: A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice.