34 resultados para Railway Track
Resumo:
The North Atlantic eddy-driven jet exhibits latitudinal variability, with evidence of three preferred latitudinal locations: south, middle and north. Here we examine the drivers of this variability and the variability of the associated storm track. We investigate the changes in the storm track characteristics for the three jet locations, and propose a mechanism by which enhanced storm track activity, as measured by upstream heat flux, is responsible for cyclical downstream latitudinal shifts in the jet. This mechanism is based on a nonlinear oscillator relationship between the enhanced meridional temperature gradient (and thus baroclinicity) and the meridional high-frequency (periods of shorter than 10 days) eddy heat flux. Such oscillations in baroclinicity and heat flux induce variability in eddy anisotropy which is associated with the changes in the dominant type of wave breaking and a different latitudinal deflection of the jet. Our results suggest that high heat flux is conducive to a northward deflection of the jet, whereas low heat flux is conducive to a more zonal jet. This jet deflecting effect was found to operate most prominently downstream of the storm track maximum, while the storm track and the jet remain anchored at a fixed latitudinal location at the beginning of the storm track. These cyclical changes in storm track characteristics can be viewed as different stages of the storm track’s spatio-temporal lifecycle.
Resumo:
This article examines a little known decision of the Judicial Committee of the Privy Council: Grand Trunk Railway Company of Canada v Robinson (1915). The examination is historical and it provides a different insight into the understanding of privity of contract, a doctrine central to contract law. The examination reveals a process of trans-Atlantic legal migration in which English law was applied to resolve an Ontario case. The nature of the resolution is surprising because it appears to conflict with the better known decision of the House of Lords, Dunlop Pneumatic Tyre Company, Limited v Selfridge and Company, Limited, which a similarly constituted panel delivered in the same week. This article argues that there was a greater malleability in the resolution of cases concerned with privity than was thought to have existed. It is also argued that the power of Canadian railway capitalism is a significant factor in understanding the legal resolution of the case. Finally, it the article considers the use of English and American precedents relevant to the case. The application of English precedents to the case led to a resolution not entirely befitting Canadian conditions.
Resumo:
Families at the bottom end of the Edwardian white-collar income spectrum demonstrated middle-class status through observable consumption, at the cost of squeezing other expenditures, including ‘necessities’. This had negative economic impacts, lowering living standards due to inefficiently high budget shares for positional goods. Drawing on the work of Pierre Bourdieu, we examine how railway clerks sought to demonstrate ‘distinction’ from manual workers through certain conspicuous expenditures and how this strategy was progressively undermined by falling real incomes over the Edwardian period.
Resumo:
A key issue in UK railway history is whether the railway system was an efficient response to the traffic requirements of the economy. The UK railway system was constructed entirely by private enterprise with minimal state subsidies. This chapter considers whether the railway system was 'over-built' because the government ignored the advice of the Railway Committee of the Board of Trade. The chapter suggests that the system was over-built by about 35 per cent. The causes of this over-building are investigated and are found to be mainly social and political failures arising from distrust between MPs and civil servants and public pressure on local MPs to ensure that their constituencies were well served by railways.