59 resultados para Projects in dispute


Relevância:

90.00% 90.00%

Publicador:

Resumo:

As the building industry proceeds in the direction of low impact buildings, research attention is being drawn towards the reduction of carbon dioxide emission and waste. Starting from design and construction to operation and demolition, various building materials are used throughout the whole building lifecycle involving significant energy consumption and waste generation. Building Information Modelling (BIM) is emerging as a tool that can support holistic design-decision making for reducing embodied carbon and waste production in the building lifecycle. This study aims to establish a framework for assessing embodied carbon and waste underpinned by BIM technology. On the basis of current research review, the framework is considered to include functional modules for embodied carbon computation. There are a module for waste estimation, a knowledge-base of construction and demolition methods, a repository of building components information, and an inventory of construction materials’ energy and carbon. Through both static 3D model visualisation and dynamic modelling supported by the framework, embodied energy (carbon), waste and associated costs can be analysed in the boundary of cradle-to-gate, construction, operation, and demolition. The proposed holistic modelling framework provides a possibility to analyse embodied carbon and waste from different building lifecycle perspectives including associated costs. It brings together existing segmented embodied carbon and waste estimation into a unified model, so that interactions between various parameters through the different building lifecycle phases can be better understood. Thus, it can improve design-decision support for optimal low impact building development. The applicability of this framework is anticipated being developed and tested on industrial projects in the near future.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Industrial projects are often complex and burdened with time pressures and a lack of information. The term 'soft-project' used here stands for projects where the ‘what’ and/or the ‘how’ is uncertain, which is often the experience in projects involving software intensive systems developments. This thesis intertwines the disciplines of project management and requirements engineering in a goal-oriented application of the maxim ‘keep all objectives satisfied’. It thus proposes a method for appraising projects. In this method, a goal-oriented analysis establishes a framework with which expert judgements are collected so as to construct a confidence profile in regard to the feasibility and adequacy of the project's planned outputs. It is hoped that this appraisal method will contribute to the activities of project ‘shaping’ and aligning stakeholders’ expectations whilst helping project managers appreciate what parts of their project can be progressed and what parts should be held pending further analysis. This thesis offers the following original contribution: an appreciation of appraisal in the project context; a goal-oriented confidence profiling technique; and: a technique to produce goal-refinement diagrams – referred to as Goal Sketching. Collectively these amount to a method for the ‘Goal Refinement Appraisal of Soft-Projects’ (GRASP). The validity of the GRASP method is shown for two projects. In the first it is used for shaping a business investigation project. This is done in real-time in the project. The second case is a retrospective study of an enterprise IT project. This case tests the effectiveness of forecasting project difficulty from an initial confidence profile.

Relevância:

90.00% 90.00%

Publicador:

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A review of work done by the Isotype Institute in the 1940s and 1950s, associated with Africa. The chapter discusses Otto Neurath's growing interest in the last years of his life in the issue of presenting information to (West) Africans through Isotype methods. Although this interest was not realised by Otto Neurath in the form of completed work during his lifetime, Marie Neurath and the Isotype Institute did successfully carry out numerous projects in Britain's West African colonies during the 1950s, in Sierra Leone, Gold Coast (Ghana), and most extensively in the Western Region of Nigeria. Discussion of these projects illustrates the means by which Isotype work was carried out in a developing world context, the difficulties that were encountered, and the issues of effectiveness and sustainability the work raised.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – This paper summarises the main research findings from a detailed, qualitative set of structured interviews and case studies of private finance initiative (PFI) schemes in the UK, which involve the construction of built facilities. The research, which was funded by the Foundation for the Built Environment, examines the emergence of PFI in the UK. Benefits and problems in the PFI process are investigated. Best practice, the key critical factors for success, and lessons for the future are also analysed. Design/methodology/approach – The research is based around 11 semi-structured interviews conducted with stakeholders in key PFI projects in the UK. Findings – The research demonstrates that value for money and risk transfer are key success criteria. High procurement and transaction costs are a feature of PFI projects, and the large-scale nature of PFI projects frequently acts as barrier to entry. Research limitations/implications – The research is based on a limited number of in-depth case study interviews. The paper also shows that further research is needed to find better ways to measure these concepts empirically. Practical implications – The paper is important in highlighting four main areas of practical improvement in the PFI process: value for money assessment; establishing end-user needs; developing competitive markets and developing appropriate skills in the public sector. Originality/value – The paper examines the drivers, barriers and critical success factors for PFI in the UK for the first time in detail and will be of value to property investors, financiers, and others involved in the PFI process.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper aims to contribute new insights globally and regionally on how carbon forest mitigation contributes to sustainable development in South America. Carbon finance has emerged as a potential policy option to tackling global climate change, degradation of forests, and social development in poor countries. This paper focuses on evaluating the socioeconomic impacts of a set of forest based mitigation pilot projects that emerged under the United Nations Framework Convention on Climate Change. The paper reviews research conducted in 2001–2002, drawing from empirical data from four pilot projects, derived from qualitative stakeholder interviews, and complemented by policy documents and literature. Of the four projects studied three are located in frontier areas, where there are considerable pressures for conversion of standing forest to agriculture. In this sense, forest mitigation projects have a substantial role to play in the region. Findings suggest however, that all four projects have experienced cumbersome implementation processes specifically, due to weak social objectives, poor communication, as well as time constraints. In three out of four cases, stakeholders highlighted limited local acceptance at the implementation stages. In the light of these findings, we discuss opportunities for implementation of future forest based mitigation projects in the land use sector.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Chongqing is the largest directly-controlled municipality in China, which is now undergoing a rapid urbanization. The urbanization rate increased from 35.6% in 2000 to 48.3% in 2007, and it is estimated to reach at least 70% by 2020. The question remains open: What are the consequences of such rapid urbanization in Chongqing in terms of urban microclimate? Furthermore, Chongqing is located within the Three Gorges Reservoir (TGR) region and the upper Yangtze River, where the Three Gorges Reservoir (TGR) project started in 1993 and was completed in 2010. As one of the biggest construction projects in the world with a rising water level of 175m and water storage capacity of about 39.3 billion m3, it would be interesting to investigate how such a gigantic project impacts the surrounding micro-environment, especially in Chongqing. Different research approaches are adopted in the study. Our literature review indicates present studies on the urban climate in Chongqing are mainly confined within the historical trend analysis of several weather stations operated by the Chongqing government, little is known about the spatial distribution of urban air temperature and how the local land cover influences the air temperature, especially when there are rivers running through the Chongqing urban area. To contribute to the present knowledge, a series of field measurement campaigns and numerical simulations were carried out. Two complementary types of field measurements are included: fixed weather stations and mobile transverse measurement. Numerical simulations using a house-developed program are able to predict the urban air temperature in Chongqing.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Organisations typically define and execute their selected strategy by developing and managing a portfolio of projects. The governance of this portfolio has proved to be a major challenge, particularly for large organisations. Executives and managers face even greater pressures when the nature of the strategic landscape is uncertain. This paper explores approaches for dealing with different levels of certainty in business IT projects and provides a contingent governance framework. Historically business IT projects have relied on a structured sequential approach, also referred to as a waterfall method. There is a distinction between the development stages of a solution and the management stages of a project that delivers the solution although these are often integrated in a business IT systems project. Prior research has demonstrated that the level of certainty varies between development projects. There can be uncertainty on what needs to be developed and also on how this solution should be developed. The move to agile development and management reflects a greater level of uncertainty often on both dimensions and this has led the adoption of more iterative approaches. What has been less well researched is the impact of uncertainty on the governance of the change portfolio and the corresponding implications for business executives. This paper poses this research question and proposes a govemance framework to address these aspects. The governance framework has been reviewed in the context of a major anonymous organisation, FinOrg. Findings are reported in this paper with a focus on the need to apply different approaches. In particular, the governance of uncertain business change is contrasted with the management approach for defined IT projects. Practical outputs from the paper include a consideration of some innovative approaches that can be used by executives. It also investigates the role of the business change portfolio group in evaluating and executing the appropriate level of governance. These results lead to recommendations for executives and also proposed further research.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Objective: To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. Background: A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. Methods: An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Results: Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. Conclusions: A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

We define and experimentally test a public provision mechanism that meets three basic ethical requirements and allows community members to influence, via monetary bids, which of several projects is implemented. For each project, participants are assigned personal values, which can be positive or negative. We provide either public or private information about personal values. This produces two distinct public provision games, which are experimentally implemented and analyzed for various projects. In spite of the complex experimental task, participants do not rely on bidding their own personal values as an obvious simple heuristic whose general acceptance would result in fair and efficient outcomes. Rather, they rely on strategic underbidding. Although underbidding is affected by projects’ characteristics, the provision mechanism mostly leads to the implementation of the most efficient project.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – This paper aims to investigate the influence of public-private partnerships (PPPs) on social and economic conditions in Kazakhstan and Russia from a public economics perspective, namely, through the lens of a market failure and PPPs’ negative externalities. Design/methodology/approach – Drawing on the concept of a market failure and using the externalities perspective, the paper investigates whether partnerships are instrumental in solving market problems, which is illustrated by the evidence from ongoing PPP projects in Kazakhstan and Russia. Findings – Results show that citizens face expansion of monopolistic trends in the service provision and decreased availability of public services. Additionally, the government support to partnerships recreates a negative externality in the form of a higher risk premium on loan interest rates that banks use to finance PPPs. The partnerships’ impact on sustainable development often appears detrimental, as they significantly intensify the struggle between sub-national governments for increased transfers from the national budget. Practical implications – The government agencies must incorporate the appraisal of the PPP externalities and their effects on the society in the decision-making regarding the PPP formation. Originality/value – The authors suggest that, although government is interested in PPPs’ positive externalities, in reality many negative externalities may offset the positive spillover effects. As a result, the partnerships’ contributions to economic and social sustainability remain controversial. Extending the value-for-money concept to incorporate the assessment of PPP externalities might significantly enhance the partnership conceptualisation by more comprehensive and accurate assessment of PPPs’ economic and social value.