206 resultados para Electricity Price Forecast
Resumo:
This paper focuses upon the policy and institutional change that has taken place within the Argentine electricity market since the country’s economic and social crisis of 2001/2. As one of the first less developed countries (LDCs) to liberalise and privatise its electricity industry, Argentina has since moved away from the orthodox market model after consumer prices were frozen by the Government in early 2002 when the national currency was devalued by 70%. Although its reforms were widely praised during the 1990s, the electricity market has undergone a number of interventions, ostensibly to keep consumer prices low and to avert the much-discussed energy ‘crisis’ caused by a dearth of new investment combined with rising demand levels. This paper explores how the economic crisis and its consequences have both enabled and legitimised these policy and institutional amendments, while drawing upon the specifics of the post-neoliberal market ‘re-reforms’ to consider the extent to which the Government appears to be moving away from market-based prescriptions. In addition, this paper contributes to sector-specific understandings of how, despite these changes, neoliberal ideas and assumptions continue to dominate Argentine public policy well beyond the postcrisis era.
Resumo:
By the turn of the twenty-first century, UNDP had embraced a new form of funding based on ‘cost-sharing’, with this source accounting for 51 per cent of the organisation’s total expenditure worldwide in 2000. Unlike the traditional donor - recipient relationship so common with development projects, the new cost-sharing modality has created a situation whereby UNDP local offices become ‘subcontractors’ and agencies of the recipient countries become ‘clients’. This paper explores this transition in the context of Brazil, focusing on how the new modality may have compromised UNDP’s ability to promote Sustainable Human Development, as established in its mandate. The great enthusiasm for this modality within the UN system and its potential application to other developing countries increase the importance of a systematic assessment of its impact and developmental consequences.
Resumo:
This study addresses three issues: spatial downscaling, calibration, and combination of seasonal predictions produced by different coupled ocean-atmosphere climate models. It examines the feasibility Of using a Bayesian procedure for producing combined, well-calibrated downscaled seasonal rainfall forecasts for two regions in South America and river flow forecasts for the Parana river in the south of Brazil and the Tocantins river in the north of Brazil. These forecasts are important for national electricity generation management and planning. A Bayesian procedure, referred to here as forecast assimilation, is used to combine and calibrate the rainfall predictions produced by three climate models. Forecast assimilation is able to improve the skill of 3-month lead November-December-January multi-model rainfall predictions over the two South American regions. Improvements are noted in forecast seasonal mean values and uncertainty estimates. River flow forecasts are less skilful than rainfall forecasts. This is partially because natural river flow is a derived quantity that is sensitive to hydrological as well as meteorological processes, and to human intervention in the form of reservoir management.
Resumo:
We propose a mechanism to explain suggested links between seismic activity and ionospheric changes detected overhead. Specifically, we explain changes in the natural extremely low-frequency (ELF) radio noise recently observed in the topside ionosphere aboard the DEMETER satellite at night, before major earthquakes. Our mechanism utilises increased electrical conductivity of surface layer air before a major earthquake, which reduces the surface-ionosphere electrical resistance. This increases the vertical fair weather current, and (to maintain continuity of electron flow) lowers the ionosphere. Magnitudes of crucial parameters are estimated and found to be consistent with observations. Natural variability in ionospheric and atmospheric electrical properties is evaluated, and may be overcome using a hybrid detection approach. Suggested experiments to investigate the mechanism involve measuring the cut-off frequency of ELF “tweeks”, the amplitude and phase of very low frequency radio waves in the Earth–ionosphere waveguide, or medium frequency radar, incoherent scatter or rocket studies of the lower ionospheric electron density.
Resumo:
The solar wind modulates the flux of galactic cosmic rays impinging on Earth inversely with solar activity. Cosmic ray ionisation is the major source of air’s electrical conductivity over the oceans and well above the continents. Differential solar modulation of the cosmic ray energy spectrum modifies the cosmic ray ionisation at different latitudes,varying the total atmospheric columnar conductance. This redistributes current flow in the global atmospheric electrical circuit, including the local vertical current density and the related surface potential gradient. Surface vertical current density and potential gradient measurements made independently at Lerwick Observatory,Shetland,from 1978 to 1985 are compared with modelled changes in cosmic ray ionisation arising from solar activity changes. Both the lower troposphere atmospheric electricity quantities are significantly increased at cosmic ray maximum(solar minimum),with a proportional change greater than that of the cosmic ray change.
Resumo:
Formal and analytical risk models prescribe how risk should be incorporated in construction bids. However, the actual process of how contractors and their clients negotiate and agree on price is complex, and not clearly articulated in the literature. Using participant observation, the entire tender process was shadowed in two leading UK construction firms. This was compared to propositions in analytical models and significant differences were found. 670 hours of work observed in both firms revealed three stages of the bidding process. Bidding activities were categorized and their extent estimated as deskwork (32%), calculations (19%), meetings (14%), documents (13%), off-days (11%), conversations (7%), correspondence (3%) and travel (1%). Risk allowances of 1-2% were priced in some bids and three tiers of risk apportionment in bids were identified. However, priced risks may sometimes be excluded from the final bidding price to enhance competitiveness. Thus, although risk apportionment affects a contractor’s pricing strategy, other complex, microeconomic factors also affect price. Instead of pricing in contingencies, risk was priced mostly through contractual rather than price mechanisms, to reflect commercial imperatives. The findings explain why some assumptions underpinning analytical models may not be sustainable in practice and why what actually happens in practice is important for those who seek to model the pricing of construction bids.
Resumo:
Recent studies into price transmission have recognized the important role played by transport and transaction costs. Threshold models are one approach to accommodate such costs. We develop a generalized Threshold Error Correction Model to test for the presence and form of threshold behavior in price transmission that is symmetric around equilibrium. We use monthly wheat, maize, and soya prices from the United States, Argentina, and Brazil to demonstrate this model. Classical estimation of these generalized models can present challenges but Bayesian techniques avoid many of these problems. Evidence for thresholds is found in three of the five commodity price pairs investigated.