38 resultados para Consensus building process
Resumo:
The article discusses various reports published within the issue, including the articles "Closing the Loop: Promoting Synergies with other Theory Building Approaches to Improve System Dynamics Practice," by Birgit Kopainsky and Luis Luna-Reyes, and "On improving dynamic decision-making: Implications from multiple-process cognitive theory," by Bent Bakken.
Resumo:
Based on surveys undertaken with local authorities and valuers who provide the valuations on which purchase prices for local authority houses under the Right to Buy are based, this paper reports on research which aims to establish the reasons for the differences between the initial valuations provided by the local authority valuers and those provided by the District Valuer on appeal. The paper reports on the reasons why tenants appeal the initial valuation and discusses issues of valuation accuracy, uncertainty and the different and imperfect data available to valuers employed by the organisations involved, as well as the factors within the valuation process, including the absence of any requirement to agree a value, which contribute to the different outcomes.
Resumo:
The value of using social development knowledge as a tool for building development policy was promoted by the British Department for International Development in the late 1990s. This article takes the case of a capacity building initiative that sought to build social development knowledge as a resource for policy formulation in 'southern' countries. Situating knowledge as a development resource presents difficulties for intervention processes that have historically developed to provide access to economic and social assets. This article highlights some of the issues involved in trying to build social development capacity and questions the suitability of this style of intervention. Inappropriate and short-term support for knowledge capacity building carries the danger that the traditional separation between the academic and practice spheres will be reinforced, making the process of democratising knowledge more difficult.
Resumo:
The building industry is often berated for its short comings in meeting up with the demand for the provision of new housing. Addressing the need for new housing stock is a challenge that has led to debates among professional bodies, the construction sector, housing industry and government. The introduction of new manufacturing technologies is often offered as a solution, but the challenges of increasing the amount of off-site construction in residential building are well known and well-rehearsed. The modern flying factory (MFF) is a concept that involves the manufacture of specific components or modules in temporary off- or near- site locations using relatively simple and quick to set up and dismantle technologies and processes. The aim is to produce short batches and hence achieve some of the benefits of off-site manufacture on a much smaller scale than in dedicated factory environments. A case study of a modern flying factory being set up to produce pre-assembled utility cupboards for a large residential development in London is presented, involving participant observation and informal interviews with key actors on the design and operationalising of the process. The case reveals that although there are costs, efficiency and health and safety benefits to using MFF approaches, there are also challenges to overcome over the time required to set up and establish the process for relatively short runs, and in evaluating whether the MFF or traditional site based production is most effective for particular aspects of projects.
Resumo:
Current approaches for the reduction of carbon emissions in buildings are often predicated on the integration of renewable technologies into building projects. Building integrated photovoltaics (BIPV) is one of these technologies and brings its own set of challenges and problems with a resulting mutual articulation of this technology and the building. A Social Construction of Technology (SCOT) approach explores how negotiations between informal groups of project actors with shared interests shape the ongoing specification of both BIPV and the building. Six main groups with different interests were found to be involved in the introduction of BIPV (Cost Watchers, Design Aesthetes, Green Guardians, Design Optimizers, Generation Maximizers and Users). Their involvement around three sets of issues (design changes from lack of familiarity with the technology, misunderstandings from unfamiliar interdependencies of trades and the effects of standard firm procedure) is followed. Findings underline how BIPV requires a level of integration that typically spans different work packages and how standard contractual structures inhibit the smooth incorporation of BIPV. Successful implementation is marked by ongoing (re-)design of both the building and the technology as informal fluid groups of project actors with shared interests address the succession of problems which arise in the process of implementation.
Resumo:
From a construction innovation systems perspective, firms acquire knowledge from suppliers, clients, universities and institutional environment. Building information modelling (BIM) involves these firms using new process standards. To understand the implications on interactive learning using BIM process standards, a case study is conducted with the UK operations of a multinational construction firm. Data is drawn from: a) two workshops involving the firm and a wider industry group, b) observations of practice in the BIM core team and in three ongoing projects, c) 12 semi-structured interviews; and d) secondary publications. The firm uses a set of BIM process standards (IFC, PAS 1192, Uniclass, COBie) in its construction activities. It is also involved in a pilot to implement the COBie standard, supported by technical and management standards for BIM, such as Uniclass and PAS1192. Analyses suggest that such BIM process standards unconsciously shapes the firm's internal and external interactive learning processes. Internally standards allow engineers to learn from each through visualising 3D information and talking around designs with operatives to address problems during construction. Externally, the firm participates in trial and pilot projects involving other construction firms, government agencies, universities and suppliers to learn about the standard and access knowledge to solve its specific design problems. Through its BIM manager, the firm provides feedback to standards developers and information technology suppliers. The research contributes by articulating how BIM process standards unconsciously change interactive learning processes in construction practice. Further research could investigate these findings in the wider UK construction innovation system.
Resumo:
Abstract Managers face hard choices between process and outcome systems of accountability in evaluating employees, but little is known about how managers resolve them. Building on the premise that political ideologies serve as uncertainty-reducing heuristics, two studies of working managers show that: (1) conservatives prefer outcome accountability and liberals prefer process accountability in an unspecified policy domain; (2) this split becomes more pronounced in a controversial domain (public schools) in which the foreground value is educational efficiency but reverses direction in a controversial domain (affirmative action) in which the foreground value is demographic equality; (3) managers who discover employees have subverted their preferred system favor tinkering over switching to an alternative system; (4) but bipartisan consensus arises when managers have clear evidence about employee trustworthiness and the tightness of the causal links between employee effort and success. These findings shed light on ideological and contextual factors that shape preferences for accountability systems.
Resumo:
Cool materials are characterized by having a high solar reflectance r – which is able to reduce heat gains during daytime - and a high thermal emissivity ε that enables them to dissipate the heat absorbed throughout the day during night. Despite the concept of cool roofs - i.e. the application of cool materials to roof surfaces - is well known in US since 1990s, many studies focused on their performance in both residential and commercial sectors under various climatic conditions for US countries, while only a few case studies are analyzed in EU countries. The present work aims at analyzing the thermal benefits due to their application to existing office buildings located in EU countries. Indeed, due to their weight in the existing buildings stock, as well as the very low rate of new buildings construction, the retrofit of office buildings is a topic of great concern worldwide. After an in-depth characterization of the existing buildings stock in the EU, the book gives an insight into roof energy balance due to different technological solutions, showing in which cases and to what extent cool roofs are preferable. A detailed description of the physical properties of cool materials and their availability on the market provides a solid background for the parametric analysis carried out by means of detailed numerical models that aims at evaluating cool roofs performance for various climates and office buildings configurations. With the help of dynamic simulations, the thermal behavior of representative office buildings of the existing EU buildings stock is assessed in terms of thermal comfort and energy needs for air conditioning. The results, which consider several variations of building features that may affect the resulting energy balance, show how cool roofs are an effective strategy for reducing overheating occurrences and thus improving thermal comfort in any climate. On the other hand, potential heating penalties due to a reduction in the incoming heat fluxes through the roof are taken into account, as well as the aging process of cool materials. Finally, an economic analysis of the best performing models shows the boundaries for their economic convenience.