28 resultados para pre-development project study


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines the implementation of brownfield regeneration policies in the UK within the context of complex systems of multi-level governance. Using the regeneration of the Thames Gateway as an example, it explores how the Government's centrally driven institutional arrangements have undermined leadership in this key development project. The Government's approach to brownfield governance is characterised as one of constant intervention in the Thames Gateway in an ad hoc and incoherent fashion. Congested and fragmented governance structures are the result. These, this paper argues, have diffused the focus and undermined the leadership of policy and implementation. It is suggested that the adoption of the principles of policy mapping and weaving would bring more clarity and coherence to the governance of the Thames Gateway.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Local, tacit and normally unspoken OHS (occupational health and safety) knowledge and practices can too easily be excluded from or remain below the industry horizon of notice, meaning that they remain unaccounted for in formal OHS policy and practice. In this article we stress the need to more systematically and routinely tap into these otherwise ‘hidden’ communication channels, which are central to how everyday safe working practices are achieved. To demonstrate this approach this paper will draw on our ethnographic research with a gang of migrant curtain wall installers on a large office development project in the north of England. In doing so we reflect on the practice-based nature of learning and sharing OHS knowledge through examples of how workers’ own patterns of successful communication help avoid health and safety problems. These understandings, we argue, can be advanced as a basis for the development of improved OHS measures, and of organizational knowing and learning.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The globalization of trade in fish has created many challenges for the developing world specifically with regard to food safety and quality. International organisations have established a good basis for standards in international trade. Whilst these requirements are frequently embraced by the major importers (such as Japan, the EU and the USA), they often impose additional safety requirements and regularly identify batches which fail to meet their strict standards. Creating an effective national seafood control system which meets both the internal national needs as well the requirements for the export market can be challenging. Many countries adopt a dual system where seafood products for the major export markets are subject to tight control whilst the majority of the products (whether for the local market or for more regional trade) are less tightly controlled. With regional liberalization also occurring, deciding on appropriate controls is complex. In the Sultanate of Oman, fisheries production is one of the countries' chief sources of economic revenue after oil production and is a major source of the national food supply. In this paper the structure of the fish supply chain has been analysed and highlighted the different routes operating for the different markets. Although much of the fish are consumed within Oman, there is a major export trade to the local regional markets. Much smaller quantities meet the more stringent standards imposed by the major importing countries and exports to these are limited. The paper has considered the development of the Omani fish control system including the key legislative documents and the administrative structures that have been developed. Establishing modern controls which satisfy the demands of the major importers is possible but places additional costs on businesses. Enhanced controls such as HACCP and other management standards are required but can be difficult to justify when alternative markets do not specify these. These enhanced controls do however provide additional consumer protection and can bring benefits to local consumers. The Omani government is attempting to upgrade the system of controls and has made tremendous progress toward the implementation of HACCP and introducing enhanced management systems into its industrial sector. The existence of strengthened legislative and government support, including subsidies, has encouraged some businesses to implement HACCP. The current control systems have been reviewed and a SWOT analysis approach used to identify key factors for their future development. The study shows that seafood products in the supply chain are often exposed to lengthy handling and distribution process before reaching the consumers, a typical issue faced by many developing countries. As seafood products are often perishable, they safety is compromised if not adequately controlled. The enforcement of current food safety laws in the Sultanate of Oman is shared across various government agencies. Consequently, there is a need to harmonize all regulatory requirements, enhancing the domestic food protection and to continue to work towards a fully risk-based approach in order to compete successfully in the global market.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Groundnuts cultivated in the semiarid tropics are often exposed to water stress (mid-season and end season) and high temperature (> 34 °C) during the critical stages of flowering and pod development. This study evaluated the effects of both water stress and high temperature under field conditions at ICRISAT, India. Treatments included two irrigations (full irrigation, 100 % of crop evapotranspiration; and water stress, 40 % of crop evapotranspiration), four temperature treatments from a combination of two sowing dates and heat tunnels with mean temperatures from sowing to maturity of 26.3° (T1), 27.3° (T2), 29.0° (T3) and 29.7 °C (T4) and two genotypes TMV2 and ICGS 11. The heat tunnels were capable of raising the day temperature by > 10 °C compared to ambient. During the 20-day high-temperature treatment at flowering, mean temperatures were 33.8° (T1), 41.6° (T2), 38.7° (T3) and 43.5°C (T4). The effects of water stress and high temperature were additive and temporary for both vegetative and pod yield, and disappeared as soon as high-temperature stress was removed. Water use efficiency was significantly affected by the main effects of temperature and cultivar and not by water stress treatments. Genotypic differences for tolerance to high temperature can be attributed to differences in flowering pattern, flower number, peg-set and harvest index. It can be inferred from this study that genotypes that are tolerant to water stress are also tolerant to high temperature under field conditions. In addition, genotypes with an ability to establish greater biomass and with a significantly greater partitioning of biomass to pod yield would be suitable for sustaining higher yields in semiarid tropics with high temperature and water stress.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

The practical application of systemic sustainability analysis (SSA; Bell and Morse, 1999) as applied in-a project instigated and managed by 'Blue Plan', one of the regional activity centres of the Mediterranean Action Plan, is set out and explained in this paper. The context in which SSA was applied and adapted to SPSA (systemic and prospective sustainability analysis). is described in the Mediterranean, primarily in Malta. The SSA process is summarized, its extension and linkage to the prospective approach is described and the comments of stakeholders in the context are added. Some preliminary outcomes are suggested. The pauticular focus of the paper is on the lessons learned from doing SSA/SPSA within a classic blueprint project framework. It is-not assumed that SSA/SPSA is 'finished' or 'definitive'. Rather, we suggest that it is a developing and changing approach that practitioners can adapt and change to meet the specific needs of the circumstances that confront them. Copyright (C) 2004 John Wiley & Sons, Ltd and ERP Environment.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

We give an overview on the development of "horizontal" European Committee for Standardisation (CEN) standards for characterising soils, sludges and biowaste in the context of environmental legislation in the European Union (EU). We discuss the various steps in the development of a horizontal standard (i.e. assessment of the possibility of such a standard, review of existing normative documents, pre-normative testing and validation) and related problems. We also provide a synopsis of European and international standards covered by the so-called Project HORIZONTAL. (C) 2004 Elsevier Ltd. All rights reserved.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private development consisting of an extension to an existing building to provide a wholesale butchery facility. The project used a conventionally organized management process. The organization structure adopted on the project is analysed using concepts from the systems theory, which are included in Walkers theoretical model of the structure of building project organizations. This model proposes that the process of building provision can be viewed as systems and sub-systems that are differentiated from each other at decision points. Further to this, the sub-systems can be viewed as the interaction of managing system and operating system. Using Walkers model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. The project's organization structure diverged from the models propositions resulting in delay to the project's completion and cost overrun but the client was satisfied with the project functionally.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Gaining public acceptance is one of the main issues with large-scale low-carbon projects such as hydropower development. It has been recommended by the World Commission on Dams that to gain public acceptance, publicinvolvement is necessary in the decision-making process (WCD, 2000). As financially-significant actors in the planning and implementation of large-scale hydropowerprojects in developing country contexts, the paper examines the ways in which publicinvolvement may be influenced by international financial institutions. Using the casestudy of the NamTheun2HydropowerProject in Laos, the paper analyses how publicinvolvement facilitated by the Asian Development Bank had a bearing on procedural and distributional justice. The paper analyses the extent of publicparticipation and the assessment of full social and environmental costs of the project in the Cost-Benefit Analysis conducted during the projectappraisal stage. It is argued that while efforts were made to involve the public, there were several factors that influenced procedural and distributional justice: the late contribution of the Asian Development Bank in the projectappraisal stage; and the issue of non-market values and discount rate to calculate the full social and environmental costs.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

The chapter starts from the premise that an historically- and institutionally-formed orientation to music education at primary level in European countries privileges a nineteenth century Western European music aesthetic, with its focus on formal characteristics such as melody and rhythm. While there is a move towards a multi-faceted understanding of musical ability, a discrete intelligence and willingness to accept musical styles or 'open-earedness', there remains a paucity of documented evidence of this in research at primary school level. To date there has been no study undertaken which has the potential to provide policy makers and practitioners with insights into the degree of homogeneity or universality in conceptions of musical ability within this educational sector. Against this background, a study was set up to explore the following research questions: 1. What conceptions of musical ability do primary teachers hold a) of themselves and; b) of their pupils? 2. To what extent are these conceptions informed by Western classical practices? A mixed methods approach was used which included survey questionnaire and semi-structured interview. Questionnaires have been sent to all classroom teachers in a random sample of primary schools in the South East of England. This was followed up with a series of semi-structured interviews with a sub-sample of respondents. The main ideas are concerned with the attitudes, beliefs and working theories held by teachers in contemporary primary school settings. By mapping the extent to which a knowledge base for teaching can be resistant to change in schools, we can problematise primary schools as sites for diversity and migration of cultural ideas. Alongside this, we can use the findings from the study undertaken in an English context as a starting point for further investigation into conceptions of music, musical ability and assessment held by practitioners in a variety of primary school contexts elsewhere in Europe; our emphasis here will be on the development of shared understanding in terms of policies and practices in music education. Within this broader framework, our study can have a significant impact internationally, with potential to inform future policy making, curriculum planning and practice.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Purpose This study investigated whether vergence and accommodation development in pre-term infants is pre-programmed or is driven by experience. Methods 32 healthy infants, born at mean 34 weeks gestation (range 31.2-36 weeks) were compared with 45 healthy full-term infants (mean 40.0 weeks) over a 6 month period, starting at 4-6 weeks post-natally. Simultaneous accommodation and convergence to a detailed target were measured using a Plusoptix PowerRefII infra-red photorefractor as a target moved between 0.33m and 2m. Stimulus/response gains and responses at 0.33m and 2m were compared by both corrected (gestational) age and chronological (post-natal) age. Results When compared by their corrected age, pre-term and full-term infants showed few significant differences in vergence and accommodation responses after 6-7 weeks of age. However, when compared by chronological age, pre-term infants’ responses were more variable, with significantly reduced vergence gains, reduced vergence response at 0.33m, reduced accommodation gain, and increased accommodation at 2m, compared to full-term infants between 8-13 weeks after birth. Conclusions When matched by corrected age, vergence and accommodation in pre-term infants show few differences from full-term infants’ responses. Maturation appears pre-programmed and is not advanced by visual experience. Longer periods of immature visual responses might leave pre-term infants more at risk of development of oculomotor deficits such as strabismus.