71 resultados para innovation management.
Resumo:
Purpose – Innovation in facilities management (FM) is a complex process as FM is a diverse discipline. This paper aims to use innovation trajectories to explore this complex process through the introduction of a technology innovation in two FM services of security and workspace management. It also aims to consider the discourse of individuals within their trajectory to understand their positions toward the innovation. Design/methodology/approach – A two-year case study was conducted and it was based in an in-house FM department that was part of a financial institution. The specific methods used for the paper were semi-structured interviews with key participants of the project. Critical discourse analysis was used to examine the data. Findings – Individuals who were involved in introducing the technology to the FM department were both internal and external to FM as innovation in FM does not happen in isolation to the organisation. Innovation trajectories were often intertwined or occurred simultaneously during the process of a project which sometimes resulted in conflict. Tensions within the discourse of ownership of the project were particularly apparent as this discourse had a power dimension in driving the project through to implementation. Research limitations/implications – The research is limited by being a single case study so it is not possible to generalise findings but the findings may have resonances with other organisations. Originality/value – The paper presents an original idea about how to understand innovation processes in FM services.
Resumo:
The construction industry is widely being criticised as a fragmented industry. There are mounting calls for the industry to change. The espoused change calls for collaboration as well as embracing innovation in the process of design, construction and across the supply chain. Innovation and the application of emerging technologies are seen as enablers for integrating the processes ‘integrating the team’ such as building information modelling (BIM). A questionnaire survey was conducted to ascertain change in construction with regard to design management, innovation and the application of BIM as cutting edge pathways for collaboration. The respondents to the survey were from an array of designations across the construction industry such as construction managers, designers, engineers, design coordinators, design managers, architects, architectural technologists and surveyors. There was a general agreement by most respondents that the design team was responsible for design management in their organisation. There is a perception that the design manager and the client are the catalyst for advancing innovation. The current state of industry in terms of incorporating BIM technologies is posing a challenge as well as providing an opportunity for accomplishment. BIM technologies provide a new paradigm shift in the way buildings are designed, constructed and maintained. This paradigm shift calls for rethinking the curriculum for educating building professionals, collectively.
Resumo:
Publication rate of patents can be a useful measure of innovation and productivity in science and technology. Patenting activity in new technological fields follows a sigmoid (S-shaped) path. Qualitative and quantitative models in management and economics literature explain why such patterns of productivity may occur. TRIZ analysis suggests that patents are generated in bursts during the evolution of a product and that they are at different levels of inventiveness. The tendency is for the inventiveness to reduce as the product is more mature. This makes it possible to guess at the lifetime stage of a product and gauge its maturity and profitability. An analysis of patenting activity and other measures of inventiveness in the emerging field of biomimetics was presented, and future trends in biologically-inspired innovation was discussed.
Resumo:
This paper aims to introduce a knowledge-based managemental prototype entitled Eþ for environmental-conscious construction relied on an integration of current environmental management tools in construction area. The overall objective of developing the Eþ prototype is to facilitate selectively reusing the retrievable knowledge in construction engineering and management areas assembled from previous projects for the best practice in environmental-conscious construction. The methodologies adopted in previous and ongoing research related to the development of the Eþ belong to the operations research area and the information technology area, including literature review, questionnaire survey and interview, statistical analysis, system analysis and development, experimental research and simulation, and so on. The content presented in this paper includes an advanced Eþ prototype, a comprehensive review of environmental management tools integrated to the Eþ prototype, and an experimental case study of the implementation of the Eþ prototype. It is expected that the adoption and implementation of the Eþ prototype can effectively facilitate contractors to improve their environmental performance in the lifecycle of projectbased construction and to reduce adverse environmental impacts due to the deployment of various engineering and management processes at each construction stage.
Resumo:
The UK construction industry is in the process of trying to adopt a new culture based on the large-scale take up of innovative practices. Through the Demonstration Project process many organizations are implementing changed practices and learning from the experiences of others. This is probably the largest experiment in innovation in any industry in recent times. The long-term success will be measured by the effectiveness of embedding the new practices in the organization. As yet there is no recognized approach to measuring the receptivity of the organization to the innovation process as an indication of the likelihood of long-term development. The development of an appropriate approach is described here. Existing approaches to the measurement of the take up of innovation were reviewed and where appropriate used as the base for the development of a questionnaire. The questionnaire could be applicable to multi-organizational construction project situations such that the output could determine an individual organization's innovative practices via an innovation scorecard, a project team's approach or it could be used to survey a wide cross-section of the industry.
Resumo:
Theoretical understanding of the implementation and use of innovations within construction contexts is discussed and developed. It is argued that both the rhetoric of the 'improvement agenda' within construction and theories of innovation fail to account for the complex contexts and disparate perspectives which characterize construction work. To address this, the concept of relative boundedness is offered. Relatively unbounded innovation is characterized by a lack of a coherent central driving force or mediator with the ability to reconcile potential conflicts and overcome resistance to implementation. This is a situation not exclusive to, but certainly indicative of, much construction project work. Drawing on empirical material from the implementation of new design and coordination technologies on a large construction project, the concept is developed, concentrating on the negotiations and translations implementation mobilized. An actor-network theory (ANT) approach is adopted, which emphasizes the roles that both human actors and non-human agents play in the performance and outcomes of these interactions. Three aspects of how relative boundedness is constituted and affected are described; through the robustness of existing practices and expectations, through the delegation of interests on to technological artefacts and through the mobilization of actors and artefacts to constrain and limit the scope of negotiations over new technology implementation.