72 resultados para costs orders


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Rationalizing non-participation as a resource deficiency in the household, this paper identifies strategies for milk-market development in the Ethiopian highlands. The additional amounts of covariates required for Positive marketable surplus -'distances-to market'-are computed from a model in which production and sales are correlated; sales are left-censored at some Unobserved thresholds production efficiencies are heterogeneous: and the data are in the form of a panel. Incorporating these features into the modeling exercise ant because they are fundamental to the data-generating environment. There are four reasons. First, because production and sales decisions are enacted within the same household, both decisions are affected by the same exogenous shocks, and production and sales are therefore likely to be correlated. Second. because selling, involves time and time is arguably the most important resource available to a subsistence household, the minimum Sales amount is not zero but, rather, some unobserved threshold that lies beyond zero. Third. the Potential existence of heterogeneous abilities in management, ones that lie latent from the econometrician's perspective, suggest that production efficiencies should be permitted to vary across households. Fourth, we observe a single set of households during multiple visits in a single production year. The results convey clearly that institutional and production) innovations alone are insufficient to encourage participation. Market-precipitating innovation requires complementary inputs, especially improvements in human capital and reductions in risk. Copyright (c) 20 08 John Wiley & Sons, Ltd.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Biological emergencies such as the appearance of an exotic transboundary or emerging disease can become disasters. The question that faces Veterinary Services in developing countries is how to balance resources dedicated to active insurance measures, such as border control, surveillance, working with the governments of developing countries, and investing in improving veterinary knowledge and tools, with passive measures, such as contingency funds and vaccine banks. There is strong evidence that the animal health situation in developed countries has improved and is relatively stable. In addition, through trade with other countries, developing countries are becoming part of the international animal health system, the status of which is improving, though with occasional setbacks. However, despite these improvements, the risk of a possible biological disaster still remains, and has increased in recent times because of the threat of bioterrorism. This paper suggests that a model that combines decision tree analysis with epidemiology is required to identify critical points in food chains that should be strengthened to reduce the risk of emergencies and prevent emergencies from becoming disasters.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The costs of dispersal are an important factor promoting natal philopatry, thereby encouraging the formation of social groups. The red fox, Vulpes vulpes, exhibits a highly flexible social system and one that is thought to represent a possible stage in the evolution of more complex patterns of group-living. Although the potential benefits accruing to philopatric offspring have previously been studied in this species, the potential costs of dispersal have received less attention. We contrasted survival rates, nutritional status, injuries and reproductive output of dispersing and non-dispersing male and female foxes in an urban population to assess the relative costs of dispersal versus natal philopatry. Mortality rates were not significantly higher for dispersing foxes, either in the short- or long-term. There was no evidence of increased nutritional stress in dispersing individuals. Dispersing individuals did, however, exhibit greater levels of wounding, although this did not appear to affect survival. Dispersing females were more likely to miss a breeding opportunity early in their reproductive lifespan. In contrast, both dispersing and non-dispersing males were unlikely to breed in their first year. We conclude that the major fitness component in females affected by dispersing is age at first reproduction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The presumption that the synthesis of 'defence' compounds in plants must incur some 'trade-off' or penalty in terms of annual crop yields has been used to explain observed inverse correlations between resistance to herbivores and rates of growth or photosynthesis. An analysis of the cost of making secondary compounds suggests that this accounts for only a small part of the overall carbon budget of annual crop plants. Even the highest reported amounts of secondary metabolites found in different crop species (flavonoids, allylisothiocyanates, hydroxamic acids, 2-tridecanone) represent a carbon demand that can be satisfied by less than an hour's photosynthesis. Similar considerations apply to secondary compounds containing nitrogen or sulphur, which are unlikely to represent a major investment compared to the cost of making proteins, the major demand for these elements. Decreases in growth and photosynthesis in response to stress are more likely the result of programmed down-regulation. Observed correlations between yield and low contents of unpalatable or toxic compounds may be the result of parallel selection during the refinement of crop species by humans.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Question: What are the life-history costs for a predatory insect of surviving parasitoid attack, and can parasitoid attack alter predator-prey interactions? Hypotheses: Survivorship is influenced by host age. Hosts that suffer parasitoid attack grow more slowly and consume fewer prey. Those that survive attack are smaller as adults and show reduced survivorship. Organisms: The aphidophagous hoverfly Episyrphus balteatus, its endoparasitoid wasp Diplazon laetatorius and its prey, the pea aphid, Acyrthosiphon pisum. Site of experiments: All experiments were conducted in controlled temperature rooms and chambers in the laboratory. Methods: Episyrphus balteatus larvae of each instar were exposed to attack by Diplazon laetatorius, then dissected to measure the encapsulation response (a measure of immunity). Second instar larvae were either attacked or not attacked by D. laetatorius. Their development rates and numbers of prey consumed were noted. The size and survivorship of surviving (immune) and control hoverflies were compared following eclosion. Conclusions: Successful immune response increased with larval age (first instar 0%, second instar 40%, third instar 100% survival). Second instar larvae that successfully resisted parasitoid attack were larger as pupae (but not as adults) and showed reduced adult survivorship. Female adult survivors were more likely than male survivors to have died within 16 days of eclosion, but there was no difference between unattacked male and female control hoverflies. Attacked larvae, irrespective of immune status, consumed fewer aphids than unattacked individuals. Episyrphus balteatus suffers significant costs of resisting parasitoid attack, and parasitoid attack can reduce the top-down effects of an insect predator, irrespective of whether the host mounts an immune response or not.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Identification of cost-determinant variables and evaluation of their degree of influence play an essential role in building reliable cost models and enhance the competitive edge of quantity surveyors as well as contracting organisations. Sixty-seven variables affecting pre-tender construction cost estimates are identified through literature and interviews. These factors are grouped into six categories and a comparison analysis of their impact is conducted. Priority ranking of cost-influencing factors is carried out using a questionnaire survey commissioned amongst quantity surveyors based in the UK. Findings of this survey indicate that there is a strong agreement between quantity surveyors in ranking cost-influencing factors of construction projects. Comparisons between the outcomes of this research and other related studies are presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A wide-ranging multiprofessional research project explored issues relating to the introduction of assistive technology into the existing homes of older people in order to provide them with the opportunity to remain at home. The financial relationship between assistive technology and packages of formal care was also explored. The costs of residential care and those of a number of packages containing differing quantities of assistive technology, formal care and informal care were compared. The analyses provide a strong financial case for substituting and/or supplementing formal care with assistive technology, even for individuals with quite disabling conditions. Although needs and hence the cost of provision rise with an increasing level of disability, the savings in care costs accrue quickly. The consideration of a variety of users with different needs and informal care provision, and occupying a very wide range of housing, leads to the conclusion that in comparison with traditional care packages, at worst, incorporating significant amounts of assistive technology into care packages is cost neutral, but that with careful specification of assistive technology major savings are feasible.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Because of the importance and potential usefulness of construction market statistics to firms and government, consistency between different sources of data is examined with a view to building a predictive model of construction output using construction data alone. However, a comparison of Department of Trade and Industry (DTI) and Office for National Statistics (ONS) series shows that the correlation coefcient (used as a measure of consistency) of the DTI output and DTI orders data and the correlation coefficient of the DTI output and ONS output data are low. It is not possible to derive a predictive model of DTI output based on DTI orders data alone. The question arises whether or not an alternative independent source of data may be used to predict DTI output data. Independent data produced by Emap Glenigan (EG), based on planning applications, potentially offers such a source of information. The EG data records the value of planning applications and their planned start and finish dates. However, as this data is ex ante and is not correlated with DTI output it is not possible to use this data to describe the volume of actual construction output. Nor is it possible to use the EG planning data to predict DTI construc-tion orders data. Further consideration of the issues raised reveal that it is not practically possible to develop a consistent predictive model of construction output using construction statistics gathered at different stages in the development process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Collaborative working methods offer the hope of reduced waste, lower tendering costs and improved outputs. The costs of tendering may be influenced by the introduction of different working methods. Transaction cost economics appears to offer an analytical framework for studying the costs of tendering, but it is more to do with providing explanations at the institutional/industry level, not at the level of individual projects. Surveys and interviews were carried out with small samples in UK. The data show that that while tendering costs are not necessarily higher in collaborative working arrangements, there is no correlation between costs of tendering and the way the work is organized. Practitioners perceive that the benefits of working in collaborative procurement routes far outweigh the costs. Tendering practices can be improved to avoid waste, and the suggested improvements include restricting selective tendering lists to 23 bidders, letting bidders know who they are competing with, reimbursing tendering costs for aborted projects and ensuring that timely and comprehensive information is provided to bidders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new, ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply, chain from clients to consultants, contractors, subcontractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, bused on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with,with tendering are highly variable, 1-15%, depending upon what precisely, is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The commercial process in construction projects is an expensive and highly variable overhead. Collaborative working practices carry many benefits, which are widely disseminated, but little information is available about their costs. Transaction Cost Economics is a theoretical framework that seeks explanations for why there are firms and how the boundaries of firms are defined through the “make-or-buy” decision. However, it is not a framework that offers explanations for the relative costs of procuring construction projects in different ways. The idea that different methods of procurement will have characteristically different costs is tested by way of a survey. The relevance of transaction cost economics to the study of commercial costs in procurement is doubtful. The survey shows that collaborative working methods cost neither more nor less than traditional methods. But the benefits of collaboration mean that there is a great deal of enthusiasm for collaboration rather than competition.

Relevância:

20.00% 20.00%

Publicador: