30 resultados para consultants
Resumo:
Ten projects constructed in Ghana between 2003 and 2010 are examined and analysed to ascertain the reliability of estimated costs provided for the projects. Cost estimates for five of the projects were calculated by consultants and cost estimates for the five remaining projects were calculated by contractors. Cost estimates prepared by contractors seemed to be closer to actual costs than estimates calculated by consultants. Projects estimated by consultants experienced an average cost overrun of 40% and time overrun of 62% whereas projects priced by contractors experienced an average cost overrun of 6% and time overrun of 41%. It seemed that contractors had a better understanding of the actual construction processes and a clearer expectation of the needs of the client hence an ability to calculate estimates that were closer to reality. Construction clients in Ghana should rely on contractors for more realistic cost estimates as estimates by consultants may be inaccurate. Where consultants are employed, an allowance of up 40% should be added to the estimated costs as a margin for inaccuracy.
Resumo:
A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.
Resumo:
One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana.
Resumo:
In this paper we undertake a preliminary assessment of the regional planning and development implications of BAA Stansted Airport’s planning permission to grow to 25 million passengers per annum (mppa) by 2010. Our concern is not simply to consider the overall growth of the airport on the airport site itself but the nature and type of growth both on- and off-site. In this document we focus on the submitted planning permission documents and test them. The methodology we employed was to draw on published and unpublished numerical estimates of the airport’s growth – particularly including estimates produced by the airport owner, BAA, and their economic and planning consultants DTZ Pieda - and critically, and systematically analyse their figures. We adopted this approach because unless the figures which were employed in the initial calculations were correct then all of the subsequent projections which flow from them - and the polices which could then be based on them – could be flawed. The analysis is divided into two parts – firstly, are the growth forecasts correct?; and secondly, what do these forecasts actually mean in developmental terms? In effect, what we have done is to produce a critique of the existing body of evidence by questioning underpinning assumptions and then draw some preliminary conclusions for the region based on this analysis. A major focus of this report has been analyse the figures involved in the planning application to expand Stansted to 25mppa. Ironically, one of our key findings, that the local impact of Stansted’s proposed expansion in employment terms might well be less than was originally thought, might make it easier to gain the acceptance of the relevant local authorities involved to allow the development to take place. Our main overall findings are that the BAA projections over-estimate the local employment impact of the airport’s proposed growth and under-estimate its potential regional ‘transportation’ employment effect. These two findings are, of course, related to each other in important ways, and we also feel that they have potentially significant medium and long-term economic, competitiveness and planning policy implications for the East of England region
Resumo:
This paper considers the relationship between value management and facilities management. The findings are particularly relevant to large client organisations which procure new buildings on a regular basis. It is argued that the maximum effectiveness of value management can only be achieved if it is used in conjunction with an ongoing commitment to post-occupancy evaluation. SMART value management is seen to provide the means of ensuring that an individual building design is in alignment with the client’s strategic property needs. However, it is also necessary to recognise that an organisation’s strategic property needs will continually be in a state of change. Consequentially, economic and functional under-performance can only be avoided by a regular performance audit of existing property stock in accordance with changing requirements. Such a policy will ensure ongoing competitiveness through organisational learning. While post-occupancy evaluation represents an obvious additional service to be provided by value management consultants, it is vital that the necessary additional skills are acquired. Process management skills and social science research techniques are clearly important. However, there is also a need to improve mechanisms for data manipulation. Success can only be achieved if equal attention is given to issues of process, structure and content.
Resumo:
This paper identifies the long-term rental depreciation rates for UK commercial properties and rates of capital expenditure incurred to offset depreciation over the same period. It starts by reviewing the economic depreciation literature and the rationale for adopting a longitudinal method of measurement, before discussing the data used and results. Data from 1993 to 2009 were sourced from Investment Property Databank and CB Richard Ellis real estate consultants. This is used to compare the change in values of new buildings in different locations with the change in values of individual properties in those locations. The analysis is conducted using observations on 742 assets drawn from all major segments of the commercial real estate market. Overall rental depreciation and capital expenditure rates are similar to those in other recent UK studies. Depreciation rates are 0.8% pa for offices, 0.5% pa for industrial properties and 0.3% pa for standard retail properties. These results hide interesting variations at a segment level, notably in retail where location often dominates value rather than the building. The majority of properties had little (if any) money spent on them over the last 16 years, but those subject to higher rates of expenditure were found to have lower depreciation rates.
Resumo:
The property development industry is a key actor in UK brownfield regeneration projects. UK policy has attempted to interlink ‘sustainable development’ and ‘sustainable brownfield’ policy agendas, which have found an additional focus through the UK government’s ‘Sustainable Communities Plan’, part of a growing international emphasis on sustainable development. This paper examines the emergence of these agendas and related policies, and the role of the property development industry in the regeneration of six differing brownfield sites, based in Thames Gateway and Greater Manchester. Using a conceptual framework, the paper investigates aspects of the sustainability of these projects and highlights key lessons from them for both the UK and overseas. The research is based on structured interviews with a variety of stakeholders, including developers, planners, consultants and community representatives to highlight emerging best practice and related policy implications.
Resumo:
Purpose – This paper seeks to summarise the main research findings from a detailed, qualitative set of structured interviews and case studies of Real Estate Partnership (REP) schemes in the UK, which involve the construction of built facilities. The research, which was funded by the Foundation for the Built Environment, examines the evolution of REPs in the UK and in Europe. The paper also aims to analyse best practice, critical factors for success, and lessons for the future. Design/methodology/approach – The research in this paper is based around ten semi-structured interviews conducted with senior representatives from corporate occupiers, property consultants, legal practices and REP service providers. Findings – The research in the paper demonstrates that REPs are particularly suited to the UK, where lease lengths are relatively long, and the level of corporate real estate owner-occupation is often higher than elsewhere. It also shows that further research is needed to examine the future shape and form of the UK REP market. Research limitations/implications – The paper is based on a limited number of in-depth case study interviews. The paper shows that further research is needed to find better ways to examine REPs empirically. Practical implications – The paper is important in highlighting a number of main issues in developing REPs: identifying with occupier's objectives; risk transfer and size of contract; and developing appropriate innovation and skills. Originality/value – The paper examines the drivers, barriers and critical success factors (at strategic and operational levels) for REPs in the UK in detail and will be of value to property managers, facilities managers, investors, financiers, and others involved in the REP process.
Resumo:
Over the last decade issues related to the financial viability of development have become increasingly important to the English planning system. As part of a wider shift towards the compartmentalisation of planning tasks, expert consultants are required to quantify, in an attempt to rationalise, planning decisions in terms of economic ‘viability’. Often with a particular focus on planning obligations, the results of development viability modelling have emerged as a key part of the evidence base used in site-specific negotiations and in planning policy formation. Focussing on the role of clients and other stakeholders, this paper investigates how development viability is tested in practice. It draws together literature on the role of calculative practices in policy formation, client feedback and influence in real estate appraisals and stakeholder engagement and consultation in the planning literature to critically evaluate the role of clients and other interest groups in influencing the production and use of development viability appraisal models. The paper draws upon semi-structured interviews with the main producers of development viability appraisals to conclude that, whilst appraisals have the potential to be biased by client and stakeholder interests, there are important controlling influences on potential opportunistic behaviour. One such control is local authorities’ weak understanding of development viability appraisal techniques which limits their capacity to question the outputs of appraisal models. However, this also is of concern given that viability is now a central feature of the town planning system.
Resumo:
This is a fully revised edition of the UK’s leading textbook on the law governing construction contracts and the management and administration of those contracts. Although the legal principles involved are an aspect of general contract law, the practical and commercial complexities of the construction industry have increasingly made this a specialist area. This new edition has been brought up to date with recent cases and developments in the law as it stands at March 2007. The basic approach of the book has been retained. Rather than provide a commentary on standard-form contracts, our approach is to introduce the general principles that underlie contracts in construction, illustrating them by reference to the most important standard forms currently in use. Some of the common standard-form contracts have been revised since the previous edition, and the text has been revised to take account of these changes. Practitioners (consultants, builders, clients and lawyers) will find this an extremely useful source of reference, providing in-depth explanations for all of the features found in contemporary construction contracts, with reasons. A unique feature of this book is the way that it brings together the relevant principles of law with the practical issues arising in construction cases. It is a key text for construction undergraduates and postgraduates as well as for those taking the RIBA Part III and CIOB Part II examinations.
Resumo:
Purpose The research objective of this study is to understand how institutional changes to the EU regulatory landscape may affect corresponding institutionalized operational practices within financial organizations. Design/methodology/approach The study adopts an Investment Management System as its case and investigates different implementations of this system within eight financial organizations, predominantly focused on investment banking and asset management activities within capital markets. At the systems vendor site, senior systems consultants and client relationship managers were interviewed. Within the financial organizations, compliance, risk and systems experts were interviewed. Findings The study empirically tests modes of institutional change. Displacement and Layering were found to be the most prevalent modes. However, the study highlights how the outcomes of Displacement and Drift may be similar in effect as both modes may cause compliance gaps. The research highlights how changes in regulations may create gaps in systems and processes which, in the short term, need to be plugged by manual processes. Practical implications Vendors abilities to manage institutional change caused by Drift, Displacement, Layering and Conversion and their ability to efficiently and quickly translate institutional variables into structured systems has the power to ease the pain and cost of compliance as well as reducing the risk of breeches by reducing the need for interim manual systems. Originality/value The study makes a contribution by applying recent theoretical concepts of institutional change to the topic of regulatory change uses this analysis to provide insight into the effects of this new environment
Resumo:
The CHARMe project enables the annotation of climate data with key pieces of supporting information that we term “commentary”. Commentary reflects the experience that has built up in the user community, and can help new or less-expert users (such as consultants, SMEs, experts in other fields) to understand and interpret complex data. In the context of global climate services, the CHARMe system will record, retain and disseminate this commentary on climate datasets, and provide a means for feeding back this experience to the data providers. Based on novel linked data techniques and standards, the project has developed a core system, data model and suite of open-source tools to enable this information to be shared, discovered and exploited by the community.
Resumo:
This book looks at how auto-ID has evolved and how it can be used in the construction industry and across projects from the perspective of all the stakeholders, from owners to design consultants, contractors and the supply chain. It could help to improve efficiency, reduce costs, ensure quality, protect the environment, and enhance safety.
Resumo:
Clubroot disease and the causal microbe Plasmodiophora brassicae offer abundant challenges to agriculturists and biological scientists. This microbe is well fitted for the environments which it inhabits. Plasmodiophora brassicae exists in soil as microscopic well protected resting spores and then grows actively and reproduces while shielded inside the roots of host plants. The pathogen is active outside the host for only short periods. Consequently, scientific studies are made challenging by the biological context of the host and pathogen and the technology required to investigate and understand that relationship. Controlling clubroot disease is a challenge for farmers, crop consultants and plant pathology practitioners because of the limited options which are available. Full symptom expression happens solely in members of the Brassicaceae family. Currently, only a few genes expressing strong resistance to P. brassicae are known and readily available. Agrochemical control is similarly limited by difficulties in molecule formulation which combines efficacy with environmental acceptability. Manipulation of husbandry encouraging improvements in soil structure, texture, nutrient composition and moisture content can reduce populations of P. brassicae. Integrating such strategies with rotation and crop management will reduce but not eliminate this disease. There are indications that forms of biological competition may be mobilised as additions to integrated control strategies. The aim of this review is to chart key themes in the development of scientific biological understanding of this host-pathogen relationship by offering signposts to grapple with clubroot disease which devastates crops and their profitability. Particular attention is given to the link between soil and nutrient chemistry and activity of this microbe.
Resumo:
For over three decades, negotiated planning obligations have been the primary form of land value capture in England. Diffusing and evolving over the last decade, a significant policy innovation has been the use of financial calculations to estimate the extent to which policies on planning obligations for actual, proposed development projects and in plan making affect the financial viability of development. This paper assesses the extent to which the use of financial appraisals has provided a robust, just and practical procedure to support land value capture. It is concluded that development viability appraisals are saturated with intrinsic uncertainty and that land value capture that is based on such calculations is, to some extent, capricious. In addition, clear incentives for developers and land owners to bias viability calculations, the economic dependence of many viability consultants on developers and land owners, a lack of transparency, contested or ambiguous guidance and the opportunities created by input uncertainty for bias are further failings. It is argued that how viability calculations are applied has been, is being and will continue to be shaped by power relations.