73 resultados para construction innovation
Resumo:
Global temperatures are expected to rise by between 1.1 and 6.4oC this century, depending, to a large extent, on the amount of carbon we emit to the atmosphere from now onwards. This warming is expected to have very negative effects on many peoples and ecosystems and, therefore, minimising our carbon emissions is a priority. Buildings are estimated to be responsible for around 50% of carbon emissions in the UK. Potential reductions involve both operational emissions, produced during use, and embodied emissions, produced during manufacture of materials and components, and during construction, refurbishments and demolition. To date the major effort has focused on reducing the, apparently, larger operational element, which is more readily quantifiable and reduction measures are relatively straightforward to identify and implement. Various studies have compared the magnitude of embodied and operational emissions, but have shown considerable variation in the relative values. This illustrates the difficulties in quantifying embodied, as it requires a detailed knowledge of the processes involved in the different life cycle phases, and requires the use of consistent system boundaries. However, other studies have established the interaction between operational and embodied, which demonstrates the importance of considering both elements together in order to maximise potential reductions. This is borne out in statements from both the Intergovernmental Panel on Climate Change and The Low Carbon Construction Innovation and Growth Team of the UK Government. In terms of meeting the 2020 and 2050 timeframes for carbon reductions it appears to be equally, if not more, important to consider early embodied carbon reductions, rather than just future operational reductions. Future decarbonisation of energy supply and more efficient lighting and M&E equipment installed in future refits is likely to significantly reduce operational emissions, lending further weight to this argument. A method of discounting to evaluate the present value of future carbon emissions would allow more realistic comparisons to be made on the relative importance of the embodied and operational elements. This paper describes the results of case studies on carbon emissions over the whole lifecycle of three buildings in the UK, compares four available software packages for determining embodied carbon and suggests a method of carbon discounting to obtain present values for future emissions. These form the initial stages of a research project aimed at producing information on embodied carbon for different types of building, components and forms of construction, in a simplified form, which can be readily used by building designers in optimising building design in terms of minimising overall carbon emissions. Keywords: Embodied carbon; carbon emission; building; operational carbon.
Resumo:
The UK construction industry is in the process of trying to adopt a new culture based on the large-scale take up of innovative practices. Through the Demonstration Project process many organizations are implementing changed practices and learning from the experiences of others. This is probably the largest experiment in innovation in any industry in recent times. The long-term success will be measured by the effectiveness of embedding the new practices in the organization. As yet there is no recognized approach to measuring the receptivity of the organization to the innovation process as an indication of the likelihood of long-term development. The development of an appropriate approach is described here. Existing approaches to the measurement of the take up of innovation were reviewed and where appropriate used as the base for the development of a questionnaire. The questionnaire could be applicable to multi-organizational construction project situations such that the output could determine an individual organization's innovative practices via an innovation scorecard, a project team's approach or it could be used to survey a wide cross-section of the industry.
Resumo:
Theoretical understanding of the implementation and use of innovations within construction contexts is discussed and developed. It is argued that both the rhetoric of the 'improvement agenda' within construction and theories of innovation fail to account for the complex contexts and disparate perspectives which characterize construction work. To address this, the concept of relative boundedness is offered. Relatively unbounded innovation is characterized by a lack of a coherent central driving force or mediator with the ability to reconcile potential conflicts and overcome resistance to implementation. This is a situation not exclusive to, but certainly indicative of, much construction project work. Drawing on empirical material from the implementation of new design and coordination technologies on a large construction project, the concept is developed, concentrating on the negotiations and translations implementation mobilized. An actor-network theory (ANT) approach is adopted, which emphasizes the roles that both human actors and non-human agents play in the performance and outcomes of these interactions. Three aspects of how relative boundedness is constituted and affected are described; through the robustness of existing practices and expectations, through the delegation of interests on to technological artefacts and through the mobilization of actors and artefacts to constrain and limit the scope of negotiations over new technology implementation.
Resumo:
Innovation is notoriously difficult to define and is invariably intertwined with issues of knowledge creation, continuous improvement and organisational change. An extensive literature classifies numerous types of innovation and militates against any simplistic attempt at definition. It is widely accepted that innovation is at least partly dependent upon the surrounding environment. Industry recipes and institutionally embedded practices shape the environment within which innovation occurs. Recent research directions have addressed the diffusion of innovation and its dependence upon social and institutional structures. In this respect, it is highly pertinent to compare the way that innovation is interpreted and enacted in different industrial sectors. The comparison between UK aerospace and construction is especially revealing because the two sectors are so different and therefore constitute radically different climates for innovation. Empirical research is reported based on semi-structured interviews with practitioners from both sectors. Interpretations of innovation are found to differ dramatically between aerospace and construction. Within the context of an ongoing struggle to define innovation, both industries are striving to become more innovative. The aerospace sector is found to emphasise technical innovation whereas the construction sector emphasises process innovation. An overriding cultural bias in Western economies towards technological innovation results in the common perception that aerospace is much more innovative than construction. The experienced realities of practitioners in the two sectors are much more complex.