148 resultados para building sites


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article explores conflicts over a series of ruins located within Zimbabwe's flagship National Park. The relics have long been regarded as sacred places by local African communities evicted from their vicinity, and have come to be seen as their ethnic heritage. Local intellectuals' promotion of this heritage was an important aspect of a defensive mobilization of cultural difference on the part of a marginalized minority group. I explore both indigenous and colonial ideas about the ruins, the different social movements with which they have been associated and the changing social life they have given the stone relics. Although African and European ideas sometimes came into violent confrontation - as in the context of colonial era evictions - there were also mutual influences in emergent ideas about tribe, heritage and history. The article engages with Pierre Nora's notion of 'sites of memory', which has usefully drawn attention to the way in which ideas of the past are rooted and reproduced in representations of particular places. But it criticizes Nora's tendency to romanticize pre-modern 'memory', suppress narrative and depoliticize traditional connections with the past. Thus, the article highlights the historicity of traditional means of relating to the past, highlighting the often bitter and divisive politics of traditional ritual, myth, kinship, descent and 'being first'. It also emphasizes the entanglement of modern and traditional ideas, inadequately captured by Nora's implied opposition between history and memory. (c) 2005 Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Titration curves were determined for soil from horizon samples of a clayey and a sandy loam Oxisol by (a) adding NaOH to soil suspensions and (b) incubating moist soils with Ca(OH)(2). The organic fraction was primarily responsible for buffering in both soils. Humic acids were more important than fulvic acids in buffering against NaOH additions. With Ca(OH)(2), greater buffer capacities were found due to carboxyl sites, primarily on fulvic acids, becoming complexed with Ca2+ so that in the clay soil humic and fulvic acids were equally important as buffering components while fulvic acids were more important in the sandy loam soil. The buffer capacity of organic matter against Ca(OH)(2) additions was 1.1 mol(c) kg(-1) pH(-1). In the incubated soils, exchangeable cations were also determined and changes in the amounts of exchangeable and non-exchangeable Ca2+ acidity and effective cation exchange capacity were calculated. Up to half the added Ca2+ became complexed and was nonexchangeable. Aluminum complexed by organic matter appears to be an important buffering component, together with non exchangeable H+. With the increase of pH the dissociated sites from the carboxyl groups could complex Ca2+. (c) 2005 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper uses a Foucauldian governmentality framework to analyse and interrogate the discourses and strategies adopted by the state and sections of the business community in their attempts to shape and influence emerging agendas of governance in post-devolution Scotland. Much of the work on governmentality has examined the ways in which governments have developed particular techniques, rationales and mechanisms to enable the functioning of governance programmes. This paper expands upon such analyses by also looking at the ways in which particular interests may use similar procedures, discourses and practices to promote their own agendas and develop new forms of resistance, contestation and challenge to emerging policy frameworks. Using the example of business interest mobilization in post-devolution Scotland, it is argued that governments may seek to mobilize defined forms of expertise and knowledge, linking them to wider political debates. This, however, creates new opportunities for interests to shape and contest the discourses and practices of government. The governmentalization of politics can, therefore, be seen as more of a dialectical process of definition and contestation than is often apparent in existing Foucault-inspired writing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Critical loads are the basis for policies controlling emissions of acidic substances in Europe and elsewhere. They are assessed by several elaborate and ingenious models, each of which requires many parameters, and have to be applied on a spatially-distributed basis. Often the values of the input parameters are poorly known, calling into question the validity of the calculated critical loads. This paper attempts to quantify the uncertainty in the critical loads due to this "parameter uncertainty", using examples from the UK. Models used for calculating critical loads for deposition of acidity and nitrogen in forest and heathland ecosystems were tested at four contrasting sites. Uncertainty was assessed by Monte Carlo methods. Each input parameter or variable was assigned a value, range and distribution in an objective a fashion as possible. Each model was run 5000 times at each site using parameters sampled from these input distributions. Output distributions of various critical load parameters were calculated. The results were surprising. Confidence limits of the calculated critical loads were typically considerably narrower than those of most of the input parameters. This may be due to a "compensation of errors" mechanism. The range of possible critical load values at a given site is however rather wide, and the tails of the distributions are typically long. The deposition reductions required for a high level of confidence that the critical load is not exceeded are thus likely to be large. The implication for pollutant regulation is that requiring a high probability of non-exceedance is likely to carry high costs. The relative contribution of the input variables to critical load uncertainty varied from site to site: any input variable could be important, and thus it was not possible to identify variables as likely targets for research into narrowing uncertainties. Sites where a number of good measurements of input parameters were available had lower uncertainties, so use of in situ measurement could be a valuable way of reducing critical load uncertainty at particularly valuable or disputed sites. From a restricted number of samples, uncertainties in heathland critical loads appear comparable to those of coniferous forest, and nutrient nitrogen critical loads to those of acidity. It was important to include correlations between input variables in the Monte Carlo analysis, but choice of statistical distribution type was of lesser importance. Overall, the analysis provided objective support for the continued use of critical loads in policy development. (c) 2007 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mediterranean ecosystems rival tropical ecosystems in terms of plant biodiversity. The Mediterranean Basin (MB) itself hosts 25 000 plant species, half of which are endemic. This rich biodiversity and the complex biogeographical and political issues make conservation a difficult task in the region. Species, habitat, ecosystem and landscape approaches have been used to identify conservation targets at various scales: ie, European, national, regional and local. Conservation decisions require adequate information at the species, community and habitat level. Nevertheless and despite recent improvements/efforts, this information is still incomplete, fragmented and varies from one country to another. This paper reviews the biogeographic data, the problems arising from current conservation efforts and methods for the conservation assessment and prioritization using GIS. GIS has an important role to play for managing spatial and attribute information on the ecosystems of the MB and to facilitate interactions with existing databases. Where limited information is available it can be used for prediction when directly or indirectly linked to externally built models. As well as being a predictive tool today GIS incorporate spatial techniques which can improve the level of information such as fuzzy logic, geostatistics, or provide insight about landscape changes such as 3D visualization. Where there are limited resources it can assist with identifying sites of conservation priority or the resolution of environmental conflicts (scenario building). Although not a panacea, GIS is an invaluable tool for improving the understanding of Mediterranean ecosystems and their dynamics and for practical management in a region that is under increasing pressure from human impact.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The principles of organization theory are applied to the organization of construction projects. This is done by proposing a framework for modelling the whole process of building procurement. This consists of a framework for describing the environments within which construction projects take place. This is followed by the development of a series of hypotheses about the organizational structure of construction projects. Four case studies are undertaken, and the extent to which their organizational structure matches the model is compared to the level of success achieved by each project. To this end there is a systematic method for evaluating the success of building project organizations, because any conclusions about the adequacy of a particular organization must be related to the degree of success achieved by that organization. In order to test these hypotheses, a mapping technique is developed. The technique offered is a development of a technique known as Linear Responsibility Analysis, and is called "3R analysis" as it deals with roles, responsibilities and relationships. The analysis of the case studies shows that they tended to suffer due to inappropriate organizational structure. One of the prevailing problems of public sector organization is that organizational structures are inadequately defined, and too cumbersome to respond to environmental demands on the project. The projects tended to be organized as rigid hierarchies, particularly at decision points, when what was required was a more flexible, dynamic and responsive organization. The study concludes with a series of recommendations; including suggestions for increasing the responsiveness of construction project organizations, and reducing the lead-in times for the inception periods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a clear need for financial protection in the construction industry, both to guarantee satisfactory completion of construction projects and to guard against non-payment. However, the cost of financial protection is often felt to be disproportionately high, with unnecessary overlap between different measures. The Reading Construction Forum has commissioned and steered research which is published in this report in an effort to bring the problem out into the open and to clarify the various options open to the various parties and stakeholders in the construction process. "Financial Protection in the UK Building Industry" is the first definitive report on the subject, offering an accurate and simple guide that all levels within the construction industry can understand. This accessible new guide considers the problem of financial protection and clearly lays out the alternative solutions.It looks by turn at the client, the main contractor, and the sub-contractor, discussing which financial protection options are available to each of them, and considers the pros and cons of each option. The cost of each type of financial protection is weighed against the amount of protection provided and the risks involved. The book concludes with guidance for consultants, emphasising relevant points to consider when advising clients and contractors about which type of financial protection to choose. "Financial Protection in the UK Building Industry" was researched by a literature search, collection of statistical data, and financial data, as well as discussions with clients, contractors, sub-contractors and consultants. This investigation has shown that the direct costs of implementing financial protection measures are marginal, and that wider adoption of payment protection would create a more equitable situation between contracting parties.This guide will enable anyone in the construction industry to consider all the options, and determine what is the best solution for them. "Reading Construction Forum Financial Protection for the UK Building Industry" was complied by the University of Reading, funded by the Reading Construction Forum. The Forum has recently commissioned and steered a number of high-profile reports covering important aspects of the construction industry. Members of the Forum include major companies which are concerned with achieving high quality in the design, construction and use of commercial, retail and industrial buildings. All are committed to change and innovation in the British and European construction industries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Financial Protection in the UK Building Industry provides comprehensive treatment of a complex aspect of construction management which is increasingly important in modern construction contracts. The term 'Financial Protection' refers to refers to the various mechanisms by which funds are made available to ensure the due performance of a partys contractual obligations. This book is based on material written for a research project funded by the Reading Construction Forum. Financial Protection in the UK Building Industry looks at the legal and economic background to the problem of providing financial protection to clients to guard against poor performance and or the insolvency of contractors, consultants and sub-contractors. The inclusion of practical guidance notes and summaries makes this a valuable guide for the construction professional as well as for the researcher. * provides in-depth analysis of financial protection measures * explores the ways in which financial protection can increase efficiency in the industry * financial protection in construction is beset with problems - this book points toward practical solutions

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. This volume brings together articles published during 1999. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable rapid reference to articles. A cumulative volume is available from the editor. Included in this volume is an appendix listing a wide range of journals associated with construction management research, giving details of frequency, editorial addresses and web sites, as well as whether each journal is international and/or refereed.