44 resultados para Supply management
Resumo:
Green supply chain management and environmental and ethical behaviour (EEB), a major component of corporate responsibility (CR), are rapidly developing fields in research and practice. The influence and effect of EEB at the functional level, however, is under-researched. Similarly, the management of risk in the supply chain has become a practical concern for many firms. It is important that managers have a good understanding of the risks associated with supplier partnerships. This paper examines the effect of firms’ investment in EEB as part of corporate social responsibility in mediating the relationship between supply chain partnership (SCP) and management appreciation of the risk of partnering. We hypothesise that simply entering into a SCP does not facilitate an appreciation of the risk of partnering and may even hamper such awareness. However, such an appreciation of the risk is facilitated through CR’s environmental and stakeholder management ethos. The study contributes further by separating risk into distinct relational and performance components. The results of a firm-level survey confirm the mediation effect, highlighting the value to supply chain strategy and design of investing in EEB on three fronts: building internal awareness, monitoring and sharing best practice.
Resumo:
The aim of this paper is to develop a comprehensive taxonomy of green supply chain management (GSCM) practices and develop a structural equation modelling-driven decision support system following GSCM taxonomy for managers to provide better understanding of the complex relationship between the external and internal factors and GSCM operational practices. Typology and/or taxonomy play a key role in the development of social science theories. The current taxonomies focus on a single or limited component of the supply chain. Furthermore, they have not been tested using different sample compositions and contexts, yet replication is a prerequisite for developing robust concepts and theories. In this paper, we empirically replicate one such taxonomy extending the original study by (a) developing broad (containing the key components of supply chain) taxonomy; (b) broadening the sample by including a wider range of sectors and organisational size; and (c) broadening the geographic scope of the previous studies. Moreover, we include both objective measures and subjective attitudinal measurements. We use a robust two-stage cluster analysis to develop our GSCM taxonomy. The main finding validates the taxonomy previously proposed and identifies size, attitude and level of environmental risk and impact as key mediators between internal drivers, external drivers and GSCM operational practices.
Resumo:
One of the distinctive characteristics of the water supply system of Greater Amman, the capital of Jordan, is that it has been based on a regime of rationing since 1987, with households receiving water once a week for various durations. This reflects the fact that while Amman's recent growth has been phenomenal, Jordan is one of the ten most water-scarce nations on earth. Amman is highly polarised socio-economically, and by means of household surveys conducted in both high- and low-income divisions of the city, the aim has been to provide detailed empirical evidence concerning the storage and use if water, the strategies used by households to manage water and overall satisfactions with water supply issues, looking specifically at issues of social equity. The analysis demonstrates the social costs of water rationing and consequent household management to be high, as well as emphasising that issues of water quality are of central importance to all consumers.
Resumo:
The two earliest structures of Minoan Crete that may be considered as large cisterns were both built in the first half of the second millennium BC (the time of the first Minoan palaces) at Myrtos-Pyrgos (lerapetra). A considerable feat of engineering and social management, they remain a most unusual attribute of a Minoan settlement, all the more so since the Myrtos river is/was available to supply water at the foot of the hill of Pyrgos. This paper presents these cisterns, briefly, in terms of geology and technology, the history of their use and re-use, and their relevance to understanding the culture and society (at local and regional levels) of Crete in the time of the Old Palaces, as well as their possible contribution to the political and military history of the period. I then review possible precursors of, and architectural parallels to, the Pyrgos cisterns at Knossos, Malia and Phaistos (none of which has been proved to be a cistern), and the later history of cisterns in Bronze Age Crete. Since only three others are known (at Archanes, Zakro and Tylissos, of Late Bronze Age date), the two cisterns of Myrtos-Pyrgos are an important addition to our still rudimentary knowledge of how the Bronze Age Cretans managed their water supplies.
Resumo:
The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.
Resumo:
The level of insolvencies in the construction industry is high, when compared to other industry sectors. Given the management expertise and experience that is available to the construction industry, it seems strange that, according to the literature, the major causes of failure are lack of financial control and poor management. This indicates that with a good cash flow management, companies could be kept operating and financially healthy. It is possible to prevent failure. Although there are financial models that can be used to predict failure, they are based on company accounts, which have been shown to be an unreliable source of data. There are models available for cash flow management and forecasting and these could be used as a starting point for managers in rethinking their cash flow management practices. The research reported here has reached the stage of formulating researchable questions for an in-depth study including issues such as how contractors manage their cash flow, how payment practices can be managed without damaging others in the supply chain and the relationships between companies" financial structures and the payment regimes to which they are subjected.
Resumo:
The level of insolvencies in the construction industry is high, when compared to other industry sectors. Given the management expertise and experience that is available to the construction industry, it seems strange that, according to the literature, the major causes of failure are lack of financial control and poor management. This indicates that with a good cash flow management, companies could be kept operating and financially healthy. It is possible to prevent failure. Although there are financial models that can be used to predict failure, they are based on company accounts, which have been shown to be an unreliable source of data. There are models available for cash flow management and forecasting and these could be used as a starting point for managers in rethinking their cash flow management practices. The research reported here has reached the stage of formulating researchable questions for an in-depth study including issues such as how contractors manage their cash flow, how payment practices can be managed without damaging others in the supply chain and the relationships between companies’ financial structures and the payment regimes to which they are subjected.
Resumo:
Over the last two decades, Jordan has suffered a chronic water crisis, and is the tenth most water-scarce nation on Earth. Such water stress has been well illustrated in the case of Greater Amman, the capital, which has grown dramatically from a population of around 2000 in the 1920s, to 2.17 million today. One of the distinctive characteristics of the water supply regime of Greater Amman is that since 1987 it has been based on a system of rationing, with households receiving water once a week for various durations. Amman is highly polarized socio-economically, and by means of household surveys, both quantitative and qualitative, conducted in high- and low-income divisions of the city, a detailed empirical evaluation of the storage and use of water, the strategies used by households to manage water and overall satisfaction with water supply issues is provided in this paper, looking specifically at issues of social equity. The analysis demonstrates the social and economic costs of water rationing and consequent management to be high, as well as emphasizing that issues of water quality are of central importance to all consumers regardless of their socio-economic status within the city.
Resumo:
Purpose – The purpose of this paper is to investigate the concepts of intelligent buildings (IBs), and the opportunities offered by the application of computer-aided facilities management (CAFM) systems. Design/methodology/approach – In this paper definitions of IBs are investigated, particularly definitions that are embracing open standards for effective operational change, using a questionnaire survey. The survey further investigated the extension of CAFM to IBs concepts and the opportunities that such integrated systems will provide to facilities management (FM) professionals. Findings – The results showed variation in the understanding of the concept of IBs and the application of CAFM. The survey showed that 46 per cent of respondents use a CAFM system with a majority agreeing on the potential of CAFM in delivery of effective facilities. Research limitations/implications – The questionnaire survey results are limited to the views of the respondents within the context of FM in the UK. Practical implications – Following on the many definitions of an IB does not necessarily lead to technologies of equipment that conform to an open standard. This open standard and documentation of systems produced by vendors is the key to integrating CAFM with other building management systems (BMS) and further harnessing the application of CAFM for IBs. Originality/value – The paper gives experience-based suggestions for both demand and supply sides of the service procurement to gain the feasible benefits and avoid the currently hindering obstacles, as the paper provides insight to the current and future tools for the mobile aspects of FM. The findings are relevant for service providers and operators as well.
Resumo:
In the tender process, contractors often rely on subcontract and supply enquiries to calculate their bid prices. However, this integral part of the bidding process is not empirically articulated in the literature. Over 30 published materials on the tendering process of contractors that talk about enquiries were reviewed and found to be based mainly on experiential knowledge rather than systematic evidence. The empirical research here helps to describe the process of enquiries precisely, improve it in practice, and have some basis to support it in theory. Using a live participant observation case study approach, the whole tender process was shadowed in the offices of two of the top 20 UK civil engineering construction firms. This helped to investigate 15 research questions on how contractors enquire and obtain prices from subcontractors and suppliers. Forty-three subcontract enquiries and 18 supply enquiries were made across two different projects with average value of 7m. An average of 15 subcontract packages and seven supply packages was involved. Thus, two or three subcontractors or suppliers were invited to bid in each package. All enquiries were formulated by the estimator, with occasional involvement of three other personnel. Most subcontract prices were received in an average of 14 working days; and supply prices took five days. The findings show 10 main activities involved in processing enquiries and their durations, as well as wasteful practices associated with enquiries. Contractors should limit their enquiry invitations to a maximum of three per package, and optimize the waiting time for quotations in order to improve cost efficiency.
Resumo:
The construction industry has incurred a considerable amount of waste as a result of poor logistics supply chain network management. Therefore, managing logistics in the construction industry is critical. An effective logistic system ensures delivery of the right products and services to the right players at the right time while minimising costs and rewarding all sectors based on value added to the supply chain. This paper reports on an on-going research study on the concept of context-aware services delivery in the construction project supply chain logistics. As part of the emerging wireless technologies, an Intelligent Wireless Web (IWW) using context-aware computing capability represents the next generation ICT application to construction-logistics management. This intelligent system has the potential of serving and improving the construction logistics through access to context-specific data, information and services. Existing mobile communication deployments in the construction industry rely on static modes of information delivery and do not take into account the worker’s changing context and dynamic project conditions. The major problems in these applications are lack of context-specificity in the distribution of information, services and other project resources, and lack of cohesion with the existing desktop based ICT infrastructure. The research works focus on identifying the context dimension such as user context, environmental context and project context, selection of technologies to capture context-parameters such wireless sensors and RFID, selection of supporting technologies such as wireless communication, Semantic Web, Web Services, agents, etc. The process of integration of Context-Aware Computing and Web-Services to facilitate the creation of intelligent collaboration environment for managing construction logistics will take into account all the necessary critical parameters such as storage, transportation, distribution, assembly, etc. within off and on-site project.
Modelling sediment supply and transport in the River Lugg: strategies for controlling sediment loads
Resumo:
The River Lugg has particular problems with high sediment loads that have resulted in detrimental impacts on ecology and fisheries. A new dynamic, process-based model of hydrology and sediments (INCA- SED) has been developed and applied to the River Lugg system using an extensive data set from 1995–2008. The model simulates sediment sources and sinks throughout the catchment and gives a good representation of the sediment response at 22 reaches along the River Lugg. A key question considered in using the model is the management of sediment sources so that concentrations and bed loads can be reduced in the river system. Altogether, five sediment management scenarios were selected for testing on the River Lugg, including land use change, contour tillage, hedging and buffer strips. Running the model with parameters altered to simulate these five scenarios produced some interesting results. All scenarios achieved some reduction in sediment levels, with the 40% land use change achieving the best result with a 19% reduction. The other scenarios also achieved significant reductions of between 7% and 9%. Buffer strips produce the best result at close to 9%. The results suggest that if hedge introduction, contour tillage and buffer strips were all applied, sediment reductions would total 24%, considerably improving the current sediment situation. We present a novel cost-effectiveness analysis of our results where we use percentage of land removed from production as our cost function. Given the minimal loss of land associated with contour tillage, hedges and buffer strips, we suggest that these management practices are the most cost-effective combination to reduce sediment loads.
Resumo:
Climate change is expected to produce reductions in water availability in England, potentially necessitating adaptive action by the water industry to maintain supplies. As part of Ofwat's fifth Periodic Review (PR09), water companies recently released their draft Water Resources Management Plans, setting out how each company intends to maintain the balance between the supply and demand for water over the next 25 years, following Environment Agency guidelines. This paper reviews these plans to determine company estimates of the impact of climate change on water supply relative to other resource pressures. The approaches adopted for incorporating the impact in the plans and the proposed management solutions are also identified. Climate change impacts for individual resource zones range from no reductions in deployable output to greater than 50% over the planning period. The estimated national aggregated loss of deployable output under a “core” climate scenario is ~520 Ml/d (3% of deployable output) by 2034/35, the equivalent of the supply of one entire water company (South West Water). Climate change is the largest single driver of change in water supplies over the planning period. Over half of the climate change impact is concentrated in southern England. In extreme cases, climate change uncertainty is of the same magnitude as the change under the core scenario (up to a loss of ~475 Ml/d). 44 of the 68 resource zones with available data are estimated to have a climate change impact. In 35 of these climate change has the greatest impact although in 10 zones sustainability reductions have a greater impact. Of the overall change in downward pressure on the supply-demand balance over the planning period, ~56% is accounted for by increased demand (620 Ml/d) and supply side climate change accounts for ~37% (407 Ml/d). Climate change impacts have a cumulative impact in concert with other changing supply side reducing components increasing the national pressure on the supply-demand balance. Whilst the magnitude of climate change appears to justify its explicit consideration, it is rare that adaptation options are planned solely in response to climate change but as a suite of options to provide a resilient supply to a range of pressures (including significant demand side pressures). Supply-side measures still tend to be considered by water companies to be more reliable than demand-side measures.