21 resultados para Scheduling
Resumo:
This is a comprehensive textbook for students of Television Studies, now updated for its third edition. The book provides students with a framework for understanding the key concepts and main approaches to Television Studies, including audience research, television history and broadcasting policy, and the analytical study of individual programmes. The book includes a glossary of key terms used in the television industry and in the academic study of television, there are suggestions for further reading at the end of each chapter, and chapters include suggested activities for use in class or as assignments. The case studies in the book include analysis of advertisements, approaches to news reporting, television scheduling, and challenges to television in new contexts of viewing on computers and mobile devices. The topics of individual chapters are: studying television, television histories, television cultures, television texts and narratives, television genres and formats, television production, television quality and value, television realities and representation, television censorship and regulation, television audiences, and the likely future for television.
Resumo:
In today's global economic conditions, improving the productivity of the construction industry is becoming more pressing than ever. Several factors impact the efficiency of construction operatives, but motivation is among the most important. Since low productivity is one of the significant challenges facing the construction industry in the State of Kuwait, the objective of this case study is to identify, explore, and rank the relative importance of the factors perceived to impact the motivational level of master craftsmen involved in primary construction trades. To achieve this objective, a structured questionnaire survey comprising 23 factors, which were shortlisted based on relevant previous research on motivation, the input of local industry experts, and numerous interviews with skilled operatives, was distributed to a large number of master craftsmen. Using the “Relative Importance Index” technique, the following prominent factors are identified: (1) payment delay; (2) rework; (3) lack of a financial incentive scheme; (4) the extent of change orders during execution; (5) incompetent supervisors; (6) delays in responding to Requests For Information (RFI); (7) overcrowding and operatives interface; (8) unrealistic scheduling and performance expectation; (9) shortage of materials on site; and (10) drawings quality level. The findings can be used to provide industry practitioners with guidance for focusing, acting upon, and controlling the critical factors influencing the performance of master craftsmen, hence, assist in achieving an efficient utilization of the workforce, and a reasonable level of competitiveness and cost effective operation.
Resumo:
Cross-layer techniques represent efficient means to enhance throughput and increase the transmission reliability of wireless communication systems. In this paper, a cross-layer design of aggressive adaptive modulation and coding (A-AMC), truncated automatic repeat request (T-ARQ), and user scheduling is proposed for multiuser multiple-input-multiple-output (MIMO) maximal ratio combining (MRC) systems, where the impacts of feedback delay (FD) and limited feedback (LF) on channel state information (CSI) are also considered. The A-AMC and T-ARQ mechanism selects the appropriate modulation and coding schemes (MCSs) to achieve higher spectral efficiency while satisfying the service requirement on the packet loss rate (PLR), profiting from the feasibility of using different MCSs to retransmit a packet, which is destined to a scheduled user selected to exploit multiuser diversity and enhance the system's performance in terms of both transmission efficiency and fairness. The system's performance is evaluated in terms of the average PLR, average spectral efficiency (ASE), outage probability, and average packet delay, which are derived in closed form, considering transmissions over Rayleigh-fading channels. Numerical results and comparisons are provided and show that A-AMC combined with T-ARQ yields higher spectral efficiency than the conventional scheme based on adaptive modulation and coding (AMC), while keeping the achieved PLR closer to the system's requirement and reducing delay. Furthermore, the effects of the number of ARQ retransmissions, numbers of transmit and receive antennas, normalized FD, and cardinality of the beamforming weight vector codebook are studied and discussed.
Resumo:
Capacity dimensioning is one of the key problems in wireless network planning. Analytical and simulation methods are usually used to pursue the accurate capacity dimensioning of wireless network. In this paper, an analytical capacity dimensioning method for WCDMA with high speed wireless link is proposed based on the analysis on relations among system performance and high speed wireless transmission technologies, such as H-ARQ, AMC and fast scheduling. It evaluates system capacity in closed-form expressions from link level and system level. Numerical results show that the proposed method can calculate link level and system level capacity for WCDMA system with HSDPA and HSUPA.
Resumo:
It is increasingly important to know about when energy is used in the home, at work and on the move. Issues of time and timing have not featured strongly in energy policy analysis and in modelling, much of which has focused on estimating and reducing total average annual demand per capita. If smarter ways of balancing supply and demand are to take hold, and if we are to make better use of decarbonised forms of supply, it is essential to understand and intervene in patterns of societal synchronisation. This calls for detailed knowledge of when, and on what occasions many people engage in the same activities at the same time, of how such patterns are changing, and of how might they be shaped. In addition, the impact of smart meters and controls partly depends on whether there is, in fact scope for shifting the timing of what people do, and for changing the rhythm of the day. Is the scheduling of daily life an arena that policy can influence, and if so how? The DEMAND Centre has been linking time use, energy consumption and travel diary data as a means of addressing these questions and in this working paper we present some of the issues and results arising from that exercise.
Resumo:
A set of high-resolution radar observations of convective storms has been collected to evaluate such storms in the UK Met Office Unified Model during the DYMECS project (Dynamical and Microphysical Evolution of Convective Storms). The 3-GHz Chilbolton Advanced Meteorological Radar was set up with a scan-scheduling algorithm to automatically track convective storms identified in real-time from the operational rainfall radar network. More than 1,000 storm observations gathered over fifteen days in 2011 and 2012 are used to evaluate the model under various synoptic conditions supporting convection. In terms of the detailed three-dimensional morphology, storms in the 1500-m grid-length simulations are shown to produce horizontal structures a factor 1.5–2 wider compared to radar observations. A set of nested model runs at grid lengths down to 100m show that the models converge in terms of storm width, but the storm structures in the simulations with the smallest grid lengths are too narrow and too intense compared to the radar observations. The modelled storms were surrounded by a region of drizzle without ice reflectivities above 0 dBZ aloft, which was related to the dominance of ice crystals and was improved by allowing only aggregates as an ice particle habit. Simulations with graupel outperformed the standard configuration for heavy-rain profiles, but the storm structures were a factor 2 too wide and the convective cores 2 km too deep.