Uncertainty contributes a major part in the accuracy of a decision-making process while its inconsistency is always difficult to be solved by existing decision-making tools. Entropy has been proved to be useful to evaluate the inconsistency of uncertainty among different respondents. The study demonstrates an entropy-based financial decision support system called e-FDSS. This integrated system provides decision support to evaluate attributes (funding options and multiple risks) available in projects. Fuzzy logic theory is included in the system to deal with the qualitative aspect of these options and risks. An adaptive genetic algorithm (AGA) is also employed to solve the decision algorithm in the system in order to provide optimal and consistent rates to these attributes. Seven simplified and parallel projects from a Hong Kong construction small and medium enterprise (SME) were assessed to evaluate the system. The result shows that the system calculates risk adjusted discount rates (RADR) of projects in an objective way. These rates discount project cash flow impartially. Inconsistency of uncertainty is also successfully evaluated by the use of the entropy method. Finally, the system identifies the favourable funding options that are managed by a scheme called SME Loan Guarantee Scheme (SGS). Based on these results, resource allocation could then be optimized and the best time to start a new project could also be identified throughout the overall project life cycle.
An empirical study of process-related attributes in segmented software cost-estimation relationships
Resumo:
Parametric software effort estimation models consisting on a single mathematical relationship suffer from poor adjustment and predictive characteristics in cases in which the historical database considered contains data coming from projects of a heterogeneous nature. The segmentation of the input domain according to clusters obtained from the database of historical projects serves as a tool for more realistic models that use several local estimation relationships. Nonetheless, it may be hypothesized that using clustering algorithms without previous consideration of the influence of well-known project attributes misses the opportunity to obtain more realistic segments. In this paper, we describe the results of an empirical study using the ISBSG-8 database and the EM clustering algorithm that studies the influence of the consideration of two process-related attributes as drivers of the clustering process: the use of engineering methodologies and the use of CASE tools. The results provide evidence that such consideration conditions significantly the final model obtained, even though the resulting predictive quality is of a similar magnitude.
Resumo:
The process of how contractors take account of risk when calculating their bids for construction work is investigated based on preliminary investigations and case studies in Ghana and UK. Ghana and UK were chosen, more or less arbitrarily, for the purpose of case studies, and to test the idea that there are systematic differences between the approaches in different places. Clear differences were found in the risk pricing approaches of contractors in the two countries. The difference appeared to emanate from the professional knowledge and competence of the bid team members, company policy, corporate accountability and the business environments in which the contractors operate. Both groups of contractors take account of risk in estimates. However, risk accountability was found to be higher on the agenda in the tender process of UK contractors, documented more systematically, and assessed and managed more rigorously with input from the whole bid team. Risk accountability takes place at three levels of the tender process and is dictated strongly by market forces and company circumstances.
Resumo:
The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.
Resumo:
Many weeds occur in patches but farmers frequently spray whole fields to control the weeds in these patches. Given a geo-referenced weed map, technology exists to confine spraying to these patches. Adoption of patch spraying by arable farmers has, however, been negligible partly due to the difficulty of constructing weed maps. Building on previous DEFRA and HGCA projects, this proposal aims to develop and evaluate a machine vision system to automate the weed mapping process. The project thereby addresses the principal technical stumbling block to widespread adoption of site specific weed management (SSWM). The accuracy of weed identification by machine vision based on a single field survey may be inadequate to create herbicide application maps. We therefore propose to test the hypothesis that sufficiently accurate weed maps can be constructed by integrating information from geo-referenced images captured automatically at different times of the year during normal field activities. Accuracy of identification will also be increased by utilising a priori knowledge of weeds present in fields. To prove this concept, images will be captured from arable fields on two farms and processed offline to identify and map the weeds, focussing especially on black-grass, wild oats, barren brome, couch grass and cleavers. As advocated by Lutman et al. (2002), the approach uncouples the weed mapping and treatment processes and builds on the observation that patches of these weeds are quite stable in arable fields. There are three main aspects to the project. 1) Machine vision hardware. Hardware component parts of the system are one or more cameras connected to a single board computer (Concurrent Solutions LLC) and interfaced with an accurate Global Positioning System (GPS) supplied by Patchwork Technology. The camera(s) will take separate measurements for each of the three primary colours of visible light (red, green and blue) in each pixel. The basic proof of concept can be achieved in principle using a single camera system, but in practice systems with more than one camera may need to be installed so that larger fractions of each field can be photographed. Hardware will be reviewed regularly during the project in response to feedback from other work packages and updated as required. 2) Image capture and weed identification software. The machine vision system will be attached to toolbars of farm machinery so that images can be collected during different field operations. Images will be captured at different ground speeds, in different directions and at different crop growth stages as well as in different crop backgrounds. Having captured geo-referenced images in the field, image analysis software will be developed to identify weed species by Murray State and Reading Universities with advice from The Arable Group. A wide range of pattern recognition and in particular Bayesian Networks will be used to advance the state of the art in machine vision-based weed identification and mapping. Weed identification algorithms used by others are inadequate for this project as we intend to collect and correlate images collected at different growth stages. Plants grown for this purpose by Herbiseed will be used in the first instance. In addition, our image capture and analysis system will include plant characteristics such as leaf shape, size, vein structure, colour and textural pattern, some of which are not detectable by other machine vision systems or are omitted by their algorithms. Using such a list of features observable using our machine vision system, we will determine those that can be used to distinguish weed species of interest. 3) Weed mapping. Geo-referenced maps of weeds in arable fields (Reading University and Syngenta) will be produced with advice from The Arable Group and Patchwork Technology. Natural infestations will be mapped in the fields but we will also introduce specimen plants in pots to facilitate more rigorous system evaluation and testing. Manual weed maps of the same fields will be generated by Reading University, Syngenta and Peter Lutman so that the accuracy of automated mapping can be assessed. The principal hypothesis and concept to be tested is that by combining maps from several surveys, a weed map with acceptable accuracy for endusers can be produced. If the concept is proved and can be commercialised, systems could be retrofitted at low cost onto existing farm machinery. The outputs of the weed mapping software would then link with the precision farming options already built into many commercial sprayers, allowing their use for targeted, site-specific herbicide applications. Immediate economic benefits would, therefore, arise directly from reducing herbicide costs. SSWM will also reduce the overall pesticide load on the crop and so may reduce pesticide residues in food and drinking water, and reduce adverse impacts of pesticides on non-target species and beneficials. Farmers may even choose to leave unsprayed some non-injurious, environmentally-beneficial, low density weed infestations. These benefits fit very well with the anticipated legislation emerging in the new EU Thematic Strategy for Pesticides which will encourage more targeted use of pesticides and greater uptake of Integrated Crop (Pest) Management approaches, and also with the requirements of the Water Framework Directive to reduce levels of pesticides in water bodies. The greater precision of weed management offered by SSWM is therefore a key element in preparing arable farming systems for the future, where policy makers and consumers want to minimise pesticide use and the carbon footprint of farming while maintaining food production and security. The mapping technology could also be used on organic farms to identify areas of fields needing mechanical weed control thereby reducing both carbon footprints and also damage to crops by, for example, spring tines. Objective i. To develop a prototype machine vision system for automated image capture during agricultural field operations; ii. To prove the concept that images captured by the machine vision system over a series of field operations can be processed to identify and geo-reference specific weeds in the field; iii. To generate weed maps from the geo-referenced, weed plants/patches identified in objective (ii).
Resumo:
Gaining public acceptance is one of the main issues with large-scale low-carbon projects such as hydropower development. It has been recommended by the World Commission on Dams that to gain public acceptance, publicinvolvement is necessary in the decision-making process (WCD, 2000). As financially-significant actors in the planning and implementation of large-scale hydropowerprojects in developing country contexts, the paper examines the ways in which publicinvolvement may be influenced by international financial institutions. Using the casestudy of the NamTheun2HydropowerProject in Laos, the paper analyses how publicinvolvement facilitated by the Asian Development Bank had a bearing on procedural and distributional justice. The paper analyses the extent of publicparticipation and the assessment of full social and environmental costs of the project in the Cost-Benefit Analysis conducted during the projectappraisal stage. It is argued that while efforts were made to involve the public, there were several factors that influenced procedural and distributional justice: the late contribution of the Asian Development Bank in the projectappraisal stage; and the issue of non-market values and discount rate to calculate the full social and environmental costs.
Resumo:
Climate modeling is a complex process, requiring accurate and complete metadata in order to identify, assess and use climate data stored in digital repositories. The preservation of such data is increasingly important given the development of ever-increasingly complex models to predict the effects of global climate change. The EU METAFOR project has developed a Common Information Model (CIM) to describe climate data and the models and modelling environments that produce this data. There is a wide degree of variability between different climate models and modelling groups. To accommodate this, the CIM has been designed to be highly generic and flexible, with extensibility built in. METAFOR describes the climate modelling process simply as "an activity undertaken using software on computers to produce data." This process has been described as separate UML packages (and, ultimately, XML schemas). This fairly generic structure canbe paired with more specific "controlled vocabularies" in order to restrict the range of valid CIM instances. The CIM will aid digital preservation of climate models as it will provide an accepted standard structure for the model metadata. Tools to write and manage CIM instances, and to allow convenient and powerful searches of CIM databases,. Are also under development. Community buy-in of the CIM has been achieved through a continual process of consultation with the climate modelling community, and through the METAFOR team’s development of a questionnaire that will be used to collect the metadata for the Intergovernmental Panel on Climate Change’s (IPCC) Coupled Model Intercomparison Project Phase 5 (CMIP5) model runs.
Resumo:
This paper investigates the relationship of the project management in Private Finance Initiative (PFI) and sustainability. A live PFI project is selected as a case study, where contract review and monitoring on project management are carried out to evaluate the sustainability of project management. The PFI procurement shows great advantages in increased contractual responsibilities of the contractor in sustainable construction, and also in practicing sustainability in project management. Six main sustainable attributes of the project management are selected to evaluate the sustainability of project management in the PFI project. The project management process in the case study is closely monitored in order to verify how the PFI project promotes sustainability in practice. The project management in the different stages of the PFI project, including tendering, design, construction and operation, contributes to the six sustainable attributes in different ways. The project management in PFI project paid more attention in sustainable development during its whole process. As the private sector is responsible to the whole life of the building project, the project manager has to consider the long-term benefits during the management process. The government should take advantages of PFI project management in practicing sustainability therefore to promote sustainable development of the national infrastructure services.
Resumo:
The construction industry is widely recognised as being inherent with risk and uncertainty. This necessitates the need for effective project risk management to achieve the project objectives of time, cost and quality. A popular tool employed in projects to aid in the management of risk is a risk register. This tool documents the project risks and is often employed by the Project Manager (PM) to manage the associated risks on a project. This research aims to ascertain how widely risk registers are used by Project Managers as part of their risk management practices. To achieve this aim entailed interviewing ten PMs, to discuss their use of the risk register as a risk management tool. The results from these interviews indicated the prevalent use of this document and recognised its effectiveness in the management of project risks. The findings identified the front end and feasibility phases of a project as crucial stages for using risk registers, noting it as a vital ingredient in the risk response planning of the decision making process. Moreover, the composition of the risk register was also understood, with an insight into how PMs produce and develop this tool also ascertained. In conclusion, this research signifies the extensive use of the risk register by PMs. A majority of PMs were of the view that risk registers constitute an essential component of their project risk management practices. This suggests a need for further research on the extent to which risk registers actually help PMs to control the risks in a construction project, particularly residual risks, and how this can be improved to minimize deviations from expected outcomes.
Resumo:
Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.
Resumo:
A universal systems design process is specified, tested in a case study and evaluated. It links English narratives to numbers using a categorical language framework with mathematical mappings taking the place of conjunctions and numbers. The framework is a ring of English narrative words between 1 (option) and 360 (capital); beyond 360 the ring cycles again to 1. English narratives are shown to correspond to the field of fractional numbers. The process can enable the development, presentation and communication of complex narrative policy information among communities of any scale, on a software implementation known as the "ecoputer". The information is more accessible and comprehensive than that in conventional decision support, because: (1) it is expressed in narrative language; and (2) the narratives are expressed as compounds of words within the framework. Hence option generation is made more effective than in conventional decision support processes including Multiple Criteria Decision Analysis, Life Cycle Assessment and Cost-Benefit Analysis.The case study is of a participatory workshop in UK bioenergy project objectives and criteria, at which attributes were elicited in environmental, economic and social systems. From the attributes, the framework was used to derive consequences at a range of levels of precision; these are compared with the project objectives and criteria as set out in the Case for Support. The design process is to be supported by a social information manipulation, storage and retrieval system for numeric and verbal narratives attached to the "ecoputer". The "ecoputer" will have an integrated verbal and numeric operating system. Novel design source code language will assist the development of narrative policy. The utility of the program, including in the transition to sustainable development and in applications at both community micro-scale and policy macro-scale, is discussed from public, stakeholder, corporate, Governmental and regulatory perspectives.
Resumo:
Purpose– The purpose of this paper is to shed new light on the link between diversity in project teams and team performance by examining the effects of players’ international career diversity on the performance of national football teams. Design/methodology/approach– The paper draws upon the literature on project organizations and experiential diversity in teams. Using data on players’ international career backgrounds and team performance from the FIFA World Cup 2006, the authors test two hypotheses linking experiential diversity in teams and a measure of relative team performance. The dataset includes detailed individual background profiles of the 736 participating players and performance data from the 64 games played at the tournament. Findings– The findings suggest that different types of experiential diversity have contrasting effects on team performance in a time‐limited project team setting. Research limitations/implications– These findings encourage team diversity researchers to further examine the impact of experiential diversity in teams on team process and performance outcomes in future research. Practical implications– The findings particularly highlight the need to carefully manage experiential diversity in project team settings in order to benefit from access to diverse tacit resources, while at the same time avoiding that the integrative capacities of teams becoming overstretched. Originality/value– The paper is a step towards a better understanding of how diversity of individual career backgrounds affects team performance outcomes in project teams.
Resumo:
Briefing phase interactions between clients and designers are recognized as social engagements, characterized by communicative sign use, where conceptual ideas are gradually transformed into potential design solutions. A semiotic analysis of briefing communications between client stakeholders and designers provides evidence of the significance and importance of stakeholder interpretation and understanding of design, empirical data being drawn from a qualitative study of NHS hospital construction projects in the UK. It is contended that stakeholders engage with a project through communicative signs and artefacts of design, referencing personal cognitive knowledge in acts of interpretation that may be different from those of designers and externally appointed client advisers. Such interpretations occur in addition to NHS client and design team efforts to ‘engage’ with and ‘understand’ stakeholders using a variety of methods. Social semiotic theorizations indicate how narrative strategies motivate the formulation of signs and artefacts in briefing work, the role of sign authors and sign readers being elucidated as a result. Findings are contextualized against current understandings of briefing communications and stakeholder management practices, a more socially attuned understanding of briefing countering some of the process-led improvement models that have characterized much of the post-Egan report literature. A stakeholder interpretation model is presented as one potential method to safeguard against unforeseen interpretations occurring, the model aligning with the proposal for a more measured recognition of how designs can trigger interpretations among client stakeholders.
Resumo:
Massive economic and population growth, and urbanization are expected to lead to a tripling of anthropogenic emissions in southern West Africa (SWA) between 2000 and 2030. However, the impacts of this on human health, ecosystems, food security, and the regional climate are largely unknown. An integrated assessment is challenging due to (a) a superposition of regional effects with global climate change, (b) a strong dependence on the variable West African monsoon, (c) incomplete scientific understanding of interactions between emissions, clouds, radiation, precipitation, and regional circulations, and (d) a lack of observations. This article provides an overview of the DACCIWA (Dynamics-Aerosol-Chemistry-Cloud Interactions in West Africa) project. DACCIWA will conduct extensive fieldwork in SWA to collect high-quality observations, spanning the entire process chain from surface-based natural and anthropogenic emissions to impacts on health, ecosystems, and climate. Combining the resulting benchmark dataset with a wide range of modeling activities will allow (a) assessment of relevant physical, chemical, and biological processes, (b) improvement of the monitoring of climate and atmospheric composition from space, and (c) development of the next generation of weather and climate models capable of representing coupled cloud-aerosol interactions. The latter will ultimately contribute to reduce uncertainties in climate predictions. DACCIWA collaborates closely with operational centers, international programs, policy-makers, and users to actively guide sustainable future planning for West Africa. It is hoped that some of DACCIWA’s scientific findings and technical developments will be applicable to other monsoon regions.
Resumo:
We define and experimentally test a public provision mechanism that meets three basic ethical requirements and allows community members to influence, via monetary bids, which of several projects is implemented. For each project, participants are assigned personal values, which can be positive or negative. We provide either public or private information about personal values. This produces two distinct public provision games, which are experimentally implemented and analyzed for various projects. In spite of the complex experimental task, participants do not rely on bidding their own personal values as an obvious simple heuristic whose general acceptance would result in fair and efficient outcomes. Rather, they rely on strategic underbidding. Although underbidding is affected by projects’ characteristics, the provision mechanism mostly leads to the implementation of the most efficient project.