69 resultados para Program and Project Management for Enterprise Innovation
Resumo:
Based on an online image archive documenting the construction and history of an early computing company, the fictional story of "Co-Operative Explanatory Capabilities in Organizational Design and Personnel Management” follows the development of an experimental approach to worker productivity into a religious cult. The project investigates the place of creativity in efficiency management and the operation of bureaucratic systems in a post-industrial work environment. The project has spawned a series of collages, featured on the Economic Thought Projects 7" collaboration with Gelbart, The Eleventh Voyage, as well as the film of Co-Operative Explanatory Capabilities in Organizational Design and Personnel Management, which has also been published as a short story in Vertigo of the Modern and on Sacrifice Press.
Resumo:
Purpose – This paper examines the role of location-specific (L) advantages in the spatial distribution of multinational enterprise (MNE) R&D activity. The meaning of L advantages is revisited. In addition to L advantages that are industry-specific, the paper emphasises that there is an important category of L advantages, referred to as collocation advantages. Design/methodology/approach – Using the OLI framework, this paper highlights that the innovation activities of MNEs are about interaction of these variables, and the essential process of internalising L advantages to enhance and create firm-specific advantages. Findings – Collocation advantages derive from spatial proximity to specific unaffiliated firms, which may be suppliers, competitors, or customers. It is also argued that L advantages are not always public goods, because they may not be available to all firms at a similar or marginal cost. These costs are associated with access and internalisation of L advantages, and – especially in the case of R&D – are attendant with the complexities of embeddedness. Originality/value – The centralisation/decentralisation, spatial separation/collocation debates in R&D location have been mistakenly viewed as a paradox facing firms, instead of as a trade-off that firms must make.
Resumo:
This paper investigates the relationship of the project management in Private Finance Initiative (PFI) and sustainability. A live PFI project is selected as a case study, where contract review and monitoring on project management are carried out to evaluate the sustainability of project management. The PFI procurement shows great advantages in increased contractual responsibilities of the contractor in sustainable construction, and also in practicing sustainability in project management. Six main sustainable attributes of the project management are selected to evaluate the sustainability of project management in the PFI project. The project management process in the case study is closely monitored in order to verify how the PFI project promotes sustainability in practice. The project management in the different stages of the PFI project, including tendering, design, construction and operation, contributes to the six sustainable attributes in different ways. The project management in PFI project paid more attention in sustainable development during its whole process. As the private sector is responsible to the whole life of the building project, the project manager has to consider the long-term benefits during the management process. The government should take advantages of PFI project management in practicing sustainability therefore to promote sustainable development of the national infrastructure services.
Resumo:
Cities may be responsible for up to 70% of global carbon emissions and 75% of global energy consumption and by 2050 it is estimated that 70% of the world's population could live in cities. The critical challenge for contemporary urbanism, therefore, is to understand how to develop the knowledge, capacity and capability for public agencies, the private sector and multiple users in city regions systemically to re-engineer their built environment and urban infrastructure in response to climate change and resource constraints. Re-Engineering the City 2020–2050: Urban Foresight and Transition Management (Retrofit 2050) is a major new interdisciplinary project funded under the Engineering and Physical Science Research Council's (EPSRC) Sustainable Urban Environments Programme which seeks to address this challenge. This briefing describes the background and conceptual framing of Retrofit 2050 project, its aims and objectives and research approach.
Resumo:
A review of the implications of climate change for freshwater resources, based on Chapter 4 of Working Group 2, IPCC.
Resumo:
Passerines are especially vulnerable to predation at the pre-independence stage. Although the role of nest success in British farmland passerine declines is contentious, improvement in nest success through sympathetic management could play a role in their reversal. Because habitat is known to interact with predation, management options for mitigation will need to consider effects of nest predation. We present results from an observational study of a population of Common Blackbird Turdus merula on a farm which has experienced a range of agri-environment and game-management options, including a period with nest predator control, as a case study to address some of these issues. We used an information theoretic model comparison procedure to look for evidence of interactions between habitat and nest predation, and then asked whether habitat management and nest predator abundances could explain population trends at the site through their effects on nest success. Interactions were detected between measures of predator abundance and habitat variables, and these varied with nest stage - habitat within the vicinity of the nest appeared to be important at the egg stage, and nest-placement characteristics were important at the nestling stage. Although predator control appeared to have a positive influence on Blackbird breeding population size, the non-experimental set-up meant we could not eliminate other potential explanations. Variation in breeding population size did not appear to be influenced by variation in nest success alone. Our study demonstrates that observational data can only go so far in detection of such effects, and we discuss how it might be taken further. Agri-environment and game-management techniques are likely to influence nest predation pressure on farmland passerines, but the patterns, mechanisms and importance to population processes remain not wholly understood.
Resumo:
Passerines are especially vulnerable to predation at the pre-independence stage. Although the role of nest success in British farmland passerine declines is contentious, improvement in nest success through sympathetic management could play a role in their reversal. Because habitat is known to interact with predation, management options for mitigation will need to consider effects of nest predation. We present results from an observational study of a population of Common Blackbird Turdus merula on a farm which has experienced a range of agri-environment and game-management options, including a period with nest predator control, as a case study to address some of these issues. We used an information theoretic model comparison procedure to look for evidence of interactions between habitat and nest predation, and then asked whether habitat management and nest predator abundances could explain population trends at the site through their effects on nest success. Interactions were detected between measures of predator abundance and habitat variables, and these varied with nest stage - habitat within the vicinity of the nest appeared to be important at the egg stage, and nest-placement characteristics were important at the nestling stage. Although predator control appeared to have a positive influence on Blackbird breeding population size, the non-experimental set-up meant we could not eliminate other potential explanations. Variation in breeding population size did not appear to be influenced by variation in nest success alone. Our study demonstrates that observational data can only go so far in detection of such effects, and we discuss how it might be taken further. Agri-environment and game-management techniques are likely to influence nest predation pressure on farmland passerines, but the patterns, mechanisms and importance to population processes remain not wholly understood.
Resumo:
The shamba system involves farmers tending tree saplings on state-owned forest land in return for being permitted to intercrop perennial food crops until canopy closure. At one time the system was used throughout all state-owned forest lands in Kenya, accounting for a large proportion of some 160,000 ha. The system should theoretically be mutually beneficial to both local people and the government. However the system has had a chequered past in Kenya due to widespread malpractice and associated environmental degradation. It was last banned in 2003 but in early 2008 field trials were initiated for its reintroduction. This study aimed to: assess the benefits and limitations of the shamba system in Kenya; assess the main influences on the extent to which the limitations and benefits are realised and; consider the management and policy requirements for the system's successful and sustainable operation. Information was obtained from 133 questionnaires using mainly open ended questions and six participatory workshops carried out in forest-adjacent communities on the western slopes of Mount Kenya in Nyeri district. In addition interviews were conducted with key informants from communities and organisations. There was strong desire amongst local people for the system's reintroduction given that it had provided significant food, income and employment. Local perceptions of the failings of the system included firstly mismanagement by government or forest authorities and secondly abuse of the system by shamba farmers and outsiders. Improvements local people considered necessary for the shamba system to work included more accountability and transparency in administration and better rules with respect to plot allocation and stewardship. Ninety-seven percent of respondents said they would like to be more involved in management of the forest and 80% that they were willing to pay for the use of a plot. The study concludes that the structural framework laid down by the 2005 Forests Act, which includes provision for the reimplementation of the shamba system under the new plantation establishment and livelihood improvement scheme (PELIS) [It should be noted that whilst the shamba system was re-branded in 2008 under the acronym PELIS, for the sake of simplicity the authors continue to refer to the 'shamba system' and 'shamba farmers' throughout this paper.], is weakened because insufficient power is likely to be devolved to local people, casting them merely as 'forest users' and the shamba system as a 'forest user right'. In so doing the system's potential to both facilitate and embody the participation of local people in forest management is limited and the long-term sustainability of the new system is questionable. Suggested instruments to address this include some degree of sharing of profits from forest timber, performance related guarantees for farmers to gain a new plot and use of joint committees consisting of local people and the forest authorities for long term management of forests.
Resumo:
1. Demographic models are assuming an important role in management decisions for endangered species. Elasticity analysis and scope for management analysis are two such applications. Elasticity analysis determines the vital rates that have the greatest impact on population growth. Scope for management analysis examines the effects that feasible management might have on vital rates and population growth. Both methods target management in an attempt to maximize population growth. 2. The Seychelles magpie robin Copsychus sechellarum is a critically endangered island endemic, the population of which underwent significant growth in the early 1990s following the implementation of a recovery programme. We examined how the formal use of elasticity and scope for management analyses might have shaped management in the recovery programme, and assessed their effectiveness by comparison with the actual population growth achieved. 3. The magpie robin population doubled from about 25 birds in 1990 to more than 50 by 1995. A simple two-stage demographic model showed that this growth was driven primarily by a significant increase in the annual survival probability of first-year birds and an increase in the birth rate. Neither the annual survival probability of adults nor the probability of a female breeding at age 1 changed significantly over time. 4. Elasticity analysis showed that the annual survival probability of adults had the greatest impact on population growth. There was some scope to use management to increase survival, but because survival rates were already high (> 0.9) this had a negligible effect on population growth. Scope for management analysis showed that significant population growth could have been achieved by targeting management measures at the birth rate and survival probability of first-year birds, although predicted growth rates were lower than those achieved by the recovery programme when all management measures were in place (i.e. 1992-95). 5. Synthesis and applications. We argue that scope for management analysis can provide a useful basis for management but will inevitably be limited to some extent by a lack of data, as our study shows. This means that identifying perceived ecological problems and designing management to alleviate them must be an important component of endangered species management. The corollary of this is that it will not be possible or wise to consider only management options for which there is a demonstrable ecological benefit. Given these constraints, we see little role for elasticity analysis because, when data are available, a scope for management analysis will always be of greater practical value and, when data are lacking, precautionary management demands that as many perceived ecological problems as possible are tackled.