44 resultados para Local government case studies


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tendering is one of the stages in construction procurement that requires extensive information and documents exchange. However, tender documents are not always clear in practice. The aim of this study was to ascertain the clarity and adequacy of tender documents used in practice. Access was negotiated into two UK construction firms and the whole tender process for two projects was shadowed for 6-7 weeks in each firm using an ethnographic approach. A significant amount of tender queries, amendments and addenda were recorded. This showed that quality of tender documentation is still a problem in construction despite the existence of standards like Co-ordinated Project Information (1987) and British Standard 1192 (1984 and 1990) that are meant to help in producing clear and consistent project information. Poor quality tender documents are a source of inaccurate estimates, claims and disputes on contracts. Six recommendations are presented to help in improving the quality of tender documentation. Further research is needed into the recommendations to help improve the quality of tender documents, perhaps in conjunction with an industry-wide investigation into the level of incorporation of CPI principles in practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The predictability of ocean and climate variables is investigated, using a perfect model-based case study approach that recognises that predictability is dependent on the initial climate state. In line with previous studies, large scale ocean variables, show predictability for several years or more; by contrast, the predictability of climate variables is generally limited to, 2 years at most. That predictability shows high sensitivity to the initial state is demonstrated by predictable climate signals, arising in different regions, variables and seasons for different initial conditions. The predictability of climate variables, in the second year is of particular interest, because this is beyond the timescale that is usually considered to be the limit, of seasonal predictability. For different initial conditions, second year predictability is found in: temperatures in southeastern, North America (winter) and western Europe (winter and summer), and precipitation in India (summer monsoon) and in the tropical, South Atlantic. Second year predictability arises either from persistence of large-scale sea surface temperature (SST) and, related ocean heat content anomalies, particularly in regions such as the North Atlantic and Southern Ocean, or from mechanisms, that involve El Nino Southern Oscillation (ENSO) dynamics.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Uncertainties in sea-level projections for the 21st century have focused ice sheet modelling efforts to include the processes that are thought to be contributing to the recently observed rapid changes at ice sheet margins. This effort is still in its infancy, however, leaving us unable to make reliable predictions of ice sheet responses to a warming climate if such glacier accelerations were to increase in size and frequency. The geological record, however, has long identified examples of nonlinear ice sheet response to climate forcing (Shackleton NJ, Opdyke ND. 1973. Oxygen isotope and paleomagnetic stratigraphy of equatorial Pacific core V28–239, late Pliocene to latest Pleistocene. Geological Society of America Memoirs145: 449–464; Fairbanks RG. 1989. A 17,000 year glacio-eustatic sea level record: influence of glacial melting rates on the Younger Dryas event and deep ocean circulation. Nature342: 637–642; Bard E, Hamelin B, Arnold M, Montaggioni L, Cabioch G, Faure G, Rougerie F. 1996. Sea level record from Tahiti corals and the timing of deglacial meltwater discharge. Nature382: 241–244), thus suggesting an alternative strategy for constraining the rate and magnitude of sea-level change that we might expect by the end of this century. Copyright © 2009 John Wiley & Sons, Ltd.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to present the findings and lessons learned from three case studies conducted for facilities located in California, North America. The findings aim to focus on energy and maintenance management practices and the interdependent link between energy and maintenance. Design/methodology/approach – The research is based on a positivist epistemological philosophical approach informed by action research. The research cycle was completed for each case study. A case study report was provided to each facility management team to foster collaboration with the researcher and to document case study process and results. Findings – Composite findings of the case studies include: there is an interdependent link between energy and maintenance management; reactive maintenance and energy management methods are commonly used; and more proactively operated and managed buildings require the interdependent link between energy maintenance management to be better understood. Research limitations/implications – The three case studies were located in California. Although the case study results can be generalized, determination of how to generalize and apply the results to commercial buildings outside of the USA is beyond the scope of this paper. Practical implications – Detailed discussion of the needs of the three facility management teams are discussed by identifying a current challenge, developing a solution and documenting lessons learned using the research cycle. Originality/value – The paper seeks to demonstrate the interdependencies of energy and maintenance management, two topics which are often researched interdependently. Additionally, the paper provides insight about maintenance management, a topic often cited as being under researched.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper explores the relationship between political ideology and planning in Britain and Sweden, with particular emphasis on the by-passing of the planning system. The prevailing ideology in each country over the last ten years is outlined and the impact on planning identified. The argument is then given in greater depth through case studies of two major projects. For Britain, this involves setting out the main features of Thatcherism and the way that this has changed the purposes underlying planning and created a diversified planning system. This is followed by a case study of Canary Wharf. For Sweden, the consensus culture and the emphasis on participation and decentralisation are discussed. The new planning legislation of 1987 is outlined. These aspects are then contrasted with the fiscal crisis and the development of 'negotiation planning'. These themes are illustrated by a case study of the Globe in Stockholm.