48 resultados para LED lighting
Resumo:
Background: Medication errors are an important cause of morbidity and mortality in primary care. The aims of this study are to determine the effectiveness, cost effectiveness and acceptability of a pharmacist-led information-technology-based complex intervention compared with simple feedback in reducing proportions of patients at risk from potentially hazardous prescribing and medicines management in general (family) practice. Methods: Research subject group: "At-risk" patients registered with computerised general practices in two geographical regions in England. Design: Parallel group pragmatic cluster randomised trial. Interventions: Practices will be randomised to either: (i) Computer-generated feedback; or (ii) Pharmacist-led intervention comprising of computer-generated feedback, educational outreach and dedicated support. Primary outcome measures: The proportion of patients in each practice at six and 12 months post intervention: - with a computer-recorded history of peptic ulcer being prescribed non-selective non-steroidal anti-inflammatory drugs - with a computer-recorded diagnosis of asthma being prescribed beta-blockers - aged 75 years and older receiving long-term prescriptions for angiotensin converting enzyme inhibitors or loop diuretics without a recorded assessment of renal function and electrolytes in the preceding 15 months. Secondary outcome measures; These relate to a number of other examples of potentially hazardous prescribing and medicines management. Economic analysis: An economic evaluation will be done of the cost per error avoided, from the perspective of the UK National Health Service (NHS), comparing the pharmacist-led intervention with simple feedback. Qualitative analysis: A qualitative study will be conducted to explore the views and experiences of health care professionals and NHS managers concerning the interventions, and investigate possible reasons why the interventions prove effective, or conversely prove ineffective. Sample size: 34 practices in each of the two treatment arms would provide at least 80% power (two-tailed alpha of 0.05) to demonstrate a 50% reduction in error rates for each of the three primary outcome measures in the pharmacist-led intervention arm compared with a 11% reduction in the simple feedback arm. Discussion: At the time of submission of this article, 72 general practices have been recruited (36 in each arm of the trial) and the interventions have been delivered. Analysis has not yet been undertaken.
Resumo:
Major construction clients are increasingly looking to procure built facilities on the basis of added value, rather than capital cost. Recent advances in the procurement of construction projects have emphasised a whole-life value approach to meeting the client’s objectives, with strategies put in place to encourage long-term commitment and through-life service provision. Construction firms are therefore increasingly required to take on responsibility for the operation and maintenance of the construction project on the client’s behalf - with the emphasis on value and service. This inevitably throws up a host of challenges, not the least of which is the need for construction firms to manage and accommodate the new emphasis on service. Indeed, these ‘service-led’ projects represent a new realm of construction projects where the rationale for the project is driven by client’s objectives with some aspect of service provision. This vision of downstream service delivery increases the number of stakeholders, adds to project complexity and challenges deeply-ingrained working practices. Ultimately it presents a major challenge for the construction sector. This paper sets out to unravel some of the many implications that this change brings with it. It draws upon ongoing research investigating how construction firms can adapt to a more service-orientated built environment and add value in project-based environments. The conclusions lay bare the challenges that firms face when trying to compete on the basis of added-value and service delivery. In particular, how it affects deeply-ingrained working practices and established relationships in the sector.
Resumo:
New high technology products usher in novel possibilities to transform the design, production and use of buildings. The high technology companies which design, develop and introduce these new products by generating and applying novel scientific and technical knowledge are faced with significant market uncertainty, technological uncertainty and competitive volatility. These characteristics present unique innovation challenges compared to low- and medium technology companies. This paper reports on an ongoing Construction Knowledge Exchange funded project which is tracking, real time, the new product development process of a new family of light emitting diode (LEDs) technologies. LEDs offer significant functional and environmental performance improvements over incumbent tungsten and halogen lamps. Hitherto, the use of energy efficient, low maintenance LEDs has been constrained by technical limitations. Rapid improvements in basic science and technology mean that for the first time LEDs can provide realistic general and accent lighting solutions. Interim results will be presented on the complex, emergent new high technology product development processes which are being revealed by the integrated supply chain of a LED module manufacture, a luminaire (light fitting) manufacture and end user involved in the project.