190 resultados para Integrated projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the development and first results of the “Community Integrated Assessment System” (CIAS), a unique multi-institutional modular and flexible integrated assessment system for modelling climate change. Key to this development is the supporting software infrastructure, SoftIAM. Through it, CIAS is distributed between the community of institutions which has each contributed modules to the CIAS system. At the heart of SoftIAM is the Bespoke Framework Generator (BFG) which enables flexibility in the assembly and composition of individual modules from a pool to form coupled models within CIAS, and flexibility in their deployment onto the available software and hardware resources. Such flexibility greatly enhances modellers’ ability to re-configure the CIAS coupled models to answer different questions, thus tracking evolving policy needs. It also allows rigorous testing of the robustness of IA modelling results to the use of different component modules representing the same processes (for example, the economy). Such processes are often modelled in very different ways, using different paradigms, at the participating institutions. An illustrative application to the study of the relationship between the economy and the earth’s climate system is provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Current research agendas are increasingly encouraging the construction industry to operate on the basis of 'added value'. Such debates echo the established concept of 'high value manufacturing' and associated trends towards servitization. Within construction, the so-called 'value agenda' draws heavily from the notion of integrated solutions. This is held to be especially appropriate in the context of PFI projects. Also relevant is the concept of service-led projects whereby the project rationale is driven by the client's objectives for delivering an enhanced service to its own customers. Such ideas are contextualized by a consideration of broader trends of privatization and outsourcing within and across the construction industry's client base. The current emphasis on integrated solutions reflects long-term trends within privatized client organizations towards the outsourcing of asset management capabilities. However, such trends are by no means uniform or consistent. An in-depth case study of three operating divisions within a major construction company illustrates that firms are unlikely to reorientate their business in response to the 'value agenda'. In the case of PFI, the tendency has been to establish specialist units for the purposes of winning work. Meanwhile, institutionally embedded operating routines within the rest of the business remain broadly unaffected.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper explores the apparent contradiction between the 'linearity' of most Sustainable Development projects, with time-bound and defined outputs achieved at a fixed cost, and an implied 'circularity' of the theory whereby there is no 'end'. Projects usually have clear parameters within which they are implemented, and the inclusion of elements such as the need for accountability, measurable impact and,value for money' have grown in importance. It could be argued that we live in a 'projectified' and therefore linear world. The paper explores the potential contradiction between 'linearity' and 'circularity', and suggests that one way around this is to frame the project within a form of the Kolb Learning Cycle heuristic. This will facilitate a rationalisation from those implementing the sustainable development project as to why decisions are being made and for whom. If these questions are opened up to the project stakeholders, including beneficiaries, then the Kolb cycle could encourage learning and understanding by all involved. It could also provide Sustainability Therapy to those trapped in processes, which they find orthogonal to their own perceptions. It is suggested that such learning, therapy and reflective practice should be a valid output of the sustainable development project, although typically the focus is only upon the final outputs and how they feed into policy. Ironically funders would be well advised to take a broader perspective in order to achieve true 'value for money' within such projects, even if learning is not an easily measurable or tangible outcome. These points are explored within the context of the wider literature and experience with a sustainable development project undertaken in Malta. (c) 2005 Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper constitutes an attempt to find a means to represent multiple stories in the strong narrative of conventional sustainable development (SD) projects. The authors' experience of such projects in various parts of the world indicates that they have a tendency to arise from and reflect a dominant mindset, placing the SD project in what can be a working environment that is inimical to the very ideals that SD is supposed to represent. Short-termism and value for money drive project formats and objectives, whilst counter-narratives and alternative stories arising from stakeholders in such projects are often ignored. Yet these alternative threads often contain strong SD messages of their own and could, if effectively utilized, enhance the SD project process. This paper sets out the case for a new field - 'project ethnography' - allied with the growing use of meta-analysis to compare project 'stories'. The analytical model applied to compare projects is based on the Kolb learning cycle and involves a (3 X 4)-fold questioning of project conceptual ization and roll-out. Copyright @ 2oo6 John Wiley & Sons, Ltd and ERP Environment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Problem structuring methods or PSMs are widely applied across a range of variable but generally small-scale organizational contexts. However, it has been argued that they are seen and experienced less often in areas of wide ranging and highly complex human activity-specifically those relating to sustainability, environment, democracy and conflict (or SEDC). In an attempt to plan, track and influence human activity in SEDC contexts, the authors in this paper make the theoretical case for a PSM, derived from various existing approaches. They show how it could make a contribution in a specific practical context-within sustainable coastal development projects around the Mediterranean which have utilized systemic and prospective sustainability analysis or, as it is now known, Imagine. The latter is itself a PSM but one which is 'bounded' within the limits of the project to help deliver the required 'deliverables' set out in the project blueprint. The authors argue that sustainable development projects would benefit from a deconstruction of process by those engaged in the project and suggest one approach that could be taken-a breakout from a project-bounded PSM to an analysis that embraces the project itself. The paper begins with an introduction to the sustainable development context and literature and then goes on to illustrate the issues by grounding the debate within a set of projects facilitated by Blue Plan for Mediterranean coastal zones. The paper goes on to show how the analytical framework could be applied and what insights might be generated.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Testing of the Integrated Nitrogen model for Catchments (INCA) in a wide range of ecosystem types across Europe has shown that the model underestimates N transformation processes to a large extent in northern catchments of Finland and Norway in winter and spring. It is found, and generally assumed, that microbial activity in soils proceeds at low rates at northern latitudes during winter, even at sub-zero temperatures. The INCA model was modified to improve the simulation of N transformation rates in northern catchments, characterised by cold climates and extensive snow accumulation and insulation in winter, by introducing an empirical function to simulate soil temperatures below the seasonal snow pack, and a degree-day model to calculate the depth of the snow pack. The proposed snow-correction factor improved the simulation of soil temperatures at Finnish and Norwegian field sites in winter, although soil temperature was still underestimated during periods with a thin snow cover. Finally, a comparison between the modified INCA version (v. 1.7) and the former version (v. 1.6) was made at the Simojoki river basin in northern Finland and at Dalelva Brook in northern Norway. The new modules did not imply any significant changes in simulated NO3- concentration levels in the streams but improved the timing of simulated higher concentrations. The inclusion of a modified temperature response function and an empirical snow-correction factor improved the flexibility and applicability of the model for climate effect studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Stream-water flows and in-stream nitrate and ammonium concentrations in a small (36.7 ha) Atlantic Forest catchment were simulated using the Integrated Nitrogen in CAtchments (INCA) model version 1.9.4. The catchment, at Cunha, is in the Serra do Mar State Park, SE Brazil and is nearly pristine because the nearest major conurbations, Sao Paulo and Rio, are some 450 km distant. However, intensive farming may increase nitrogen (N) deposition and there are growing pressures for urbanisation. The mean-monthly discharges and NO3-N concentration dynamics were simulated adequately for the calibration and validation periods with (simulated) loss rates of 6.55 kg.ha(-1) yr(-1) for NO3-N and 3.85 kg.ha(-1) yr(-1) for NH4-N. To investigate the effects of elevated levels of N deposition in the future, various scenarios for atmospheric deposition were simulated; the highest value corresponded to that in a highly polluted area of Atlantic Forest in Sao Paulo City. It was found that doubling the atmospheric deposition generated a 25% increase in the N leaching rate, while at levels approaching the highly polluted Sao Paulo deposition rate, five times higher than the current rate, leaching increased by 240%, which would create highly eutrophic conditions, detrimental to downstream water quality. The results indicate that the INCA model can be useful for estimating N concentration and fluxes for different atmospheric deposition rates and hydrological conditions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A semi-distributed model, INCA, has been developed to determine the fate and distribution of nutrients in terrestrial and aquatic systems. The model simulates nitrogen and phosphorus processes in soils, groundwaters and river systems and can be applied in a semi-distributed manner at a range of scales. In this study, the model has been applied at field to sub-catchment to whole catchment scale to evaluate the behaviour of biosolid-derived losses of P in agricultural systems. It is shown that process-based models such as INCA, applied at a wide range of scales, reproduce field and catchment behaviour satisfactorily. The INCA model can also be used to generate generic information for risk assessment. By adjusting three key variables: biosolid application rates, the hydrological connectivity of the catchment and the initial P-status of the soils within the model, a matrix of P loss rates can be generated to evaluate the behaviour of the model and, hence, of the catchment system. The results, which indicate the sensitivity of the catchment to flow paths, to application rates and to initial soil conditions, have been incorporated into a Nutrient Export Risk Matrix (NERM).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An integrated approach to climate change impact assessment is explored by linking established models of regional climate (SDSM), water resources (CATCHMOD) and water quality (INCA) within a single framework. A case study of the River Kennet illustrates how the system can be used to investigate aspects of climate change uncertainty, deployable water resources, and water quality dynamics in upper and lower reaches of the drainage network. The results confirm the large uncertainty in climate change scenarios and freshwater impacts due to the choice of general circulation model (GCM). This uncertainty is shown to be greatest during summer months as evidenced by large variations between GCM-derived projections of future tow river flows, deployable yield from groundwater, severity of nutrient flushing episodes, and Long-term trends in surface water quality. Other impacts arising from agricultural land-use reform or delivery of EU Water Framework Directive objectives under climate change could be evaluated using the same framework. (c) 2006 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A systematic technique for identifying the environments of construction projects is described. It provides a method for isolating the major variables surrounding construction projects, and is briefly applied to the industries of Britain and Jamaica to illustrate its application. From this, it is inferred that the environment of a Jamaican construction project in systems terms is broadly similar to the environment of a construction project in Britain.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The principles of organization theory are applied to the organization of construction projects. This is done by proposing a framework for modelling the whole process of building procurement. This consists of a framework for describing the environments within which construction projects take place. This is followed by the development of a series of hypotheses about the organizational structure of construction projects. Four case studies are undertaken, and the extent to which their organizational structure matches the model is compared to the level of success achieved by each project. To this end there is a systematic method for evaluating the success of building project organizations, because any conclusions about the adequacy of a particular organization must be related to the degree of success achieved by that organization. In order to test these hypotheses, a mapping technique is developed. The technique offered is a development of a technique known as Linear Responsibility Analysis, and is called "3R analysis" as it deals with roles, responsibilities and relationships. The analysis of the case studies shows that they tended to suffer due to inappropriate organizational structure. One of the prevailing problems of public sector organization is that organizational structures are inadequately defined, and too cumbersome to respond to environmental demands on the project. The projects tended to be organized as rigid hierarchies, particularly at decision points, when what was required was a more flexible, dynamic and responsive organization. The study concludes with a series of recommendations; including suggestions for increasing the responsiveness of construction project organizations, and reducing the lead-in times for the inception periods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages, their identification helps in making judgements about organizational structure on construction projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Patterns of communication and behaviour emerge within a construction project in response to a construction crisis. This paper investigates, within a grounded theory framework, the nature of these patterns, the sociological and psychological forces which shape them and their relationship with crisis management efficiency. A grounded theory is presented in four parts. The first part conceives a construction crisis as a period of social instability, arising from conflicting interest groups, seeking to exercise power in the pursuit of social structures which suit their political and economic interests. The second part sees a construction crisis as a de-sensitizing phenomenon which results in a period of behavioural instability and conflict which is self-perpetuating. The third part cites social structure as an important influence upon construction crisis management efficiency, in determining the efficiency of information flow, and the level of uncertainty between those affected. The fourth part points to the in-built defence mechanisms which construction crises have and to three managerial ironies which make construction crisis management difficult.