32 resultados para Design Management
Resumo:
Intelligent buildings should provide a multi-sensory experience so that visual, aural, tactile, olfactory and gustatory senses are stimulated appropriately. A lack of environmental stimuli produces a boring and unsatisfying environment. It is now known that the environment affects people at deeper levels than, say, health and safety, and consequently it can modify moods and work performance. A holistic approach is proposed which recognizes that the physical environment together with social, organizational and personal factors can enhance the productivity of occupants. This approach provides a footprint for the design of healthier and more sustainable workplaces.
Resumo:
Design management research usually deals with the processes within the professional design team and yet, in the UK, the volume of the total project information produced by the specialist trade contractors equals or exceeds that produced by the design team. There is a need to understand the scale of this production task and to plan and manage it accordingly. The model of the process on which the plan is to be based, while generic, must be sufficiently robust to cover the majority of instances. An approach using design elements, in sufficient depth to possibly develop tools for a predictive model of the process, is described. The starting point is that each construction element and its components have a generic sequence of design activities. Specific requirements tailor the element's application to the building. Then there are the constraints produced due to the interaction with other elements. Therefore, the selection of a component within the element may impose a set of constraints that will affect the choice of other design elements. Thus, a design decision can be seen as an interrelated element-constraint-element (ECE) sub-net. To illustrate this approach, an example of the process within precast concrete cladding has been used.
Resumo:
Design management research usually deals with the processes within the professional design team and yet, in the UK, the volume of the total project information produced by the specialist trade contractors equals or exceeds that produced by the design team. There is a need to understand the scale of this production task and to plan and manage it accordingly. The model of the process on which the plan is to be based, while generic, must be sufficiently robust to cover the majority of instances. An approach using design elements, in sufficient depth to possibly develop tools for a predictive model of the process, is described. The starting point is that each construction element and its components have a generic sequence of design activities. Specific requirements tailor the element's application to the building. Then there are the constraints produced due to the interaction with other elements. Therefore, the selection of a component within the element may impose a set of constraints that will affect the choice of other design elements. Thus, a design decision can be seen as an interrelated element-constraint-element (ECE) sub-net. To illustrate this approach, an example of the process within precast concrete cladding has been used.
Resumo:
The ISO has issued a Draft International Standard on construction procurement and the British Standards Institute is drafting a standard based upon this for use in the UK. Three questions arise from these observations. First, what kind of consultation processes would be adequate to ensure that such a standard meets the requirements of an industry as diverse as construction? Second, why would an international standard be inappropriate for use in a country like UK? Third, what sort of issues should such a standard seek to cover? There are strong precedents for process standards, such as quality assurance, design management and workmanship on building sites. So the idea of a standard on procurement is not unusual. Moreover, there are many differences in tendering and procurement practice that are wasteful and even collusive or illegal. These issues are explored with a view to offering insights and suggestions for guidance based on the experiences in UK. The research method is first-hand observation of the drafting committee who are dealing with the British Standard. As an example to test and inform the standardization concept, six different standard guidance documents on tendering procedures are compared. This reveals a significant degree of diversity, and based on this, nine stages for implementing a tendering procedure are derived.
Resumo:
The idea of a community of practice (CoP) has been offered as the engine to unlock the potential of organizational resources, mainly knowledge and people, to achieve the strategic goal of sustained competitiveness. The relevance and application of CoPs in large UK contracting companies was investigated using two case studies. Contrasting variations in the understanding of the concept between the two contracting companies were observed. While a CoP was applied in one company with strategic intent, the concept was not fully understood in the other. In one company, only a third of CoP members surveyed agreed that CoPs were a vehicle for driving best practice and innovation throughout the business; this compared with more than 60% in agreement in the other contracting firm. The higher agreement and satisfaction of CoP members in the latter case study was the result of the management's understanding and commitment. CoPs require time and organizational support to mature. The strategic inception and management support of CoP application is vital for their maturation and progress. Although the construction industry change discourses portray CoPs as fostering an environment of trust, and hence serving as innovation and competiveness enablers, their potential contribution to contracting firms does not provide a compelling case and hence merits further research studies.
Resumo:
Active queue management (AQM) policies are those policies of router queue management that allow for the detection of network congestion, the notification of such occurrences to the hosts on the network borders, and the adoption of a suitable control policy. This paper proposes the adoption of a fuzzy proportional integral (FPI) controller as an active queue manager for Internet routers. The analytical design of the proposed FPI controller is carried out in analogy with a proportional integral (PI) controller, which recently has been proposed for AQM. A genetic algorithm is proposed for tuning of the FPI controller parameters with respect to optimal disturbance rejection. In the paper the FPI controller design metodology is described and the results of the comparison with random early detection (RED), tail drop, and PI controller are presented.
Resumo:
This paper discusses the problems inherent within traditional supply chain management's forecast and inventory management processes arising when tackling demand driven supply chain. A demand driven supply chain management architecture developed by Orchestr8 Ltd., U.K. is described to demonstrate its advantages over traditional supply chain management. Within this architecture, a metrics reporting system is designed by adopting business intelligence technology that supports users for decision making and planning supply activities over supply chain health.