19 resultados para Contract for construction


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper extends the build-operate-transfer (BOT) concession model (BOTCcM) to a new method for identifying a concession period by using bargaining-game theory. Concession period is one of the most important decision variables in arranging a BOT-type contract, and there are few methodologies available for helping to determine the value of this variable. The BOTCcM presents an alternative method by which a group of concession period solutions are produced. Nevertheless, a typical weakness in using BOTCcM is that the model cannot recommend a specific time span for concessionary. This paper introduces a new method called BOT bargaining concession model (BOTBaC) to enable the identification of a specific concession period, which takes into account the bargaining behavior of the two parties concerned in engaging a BOT contract, namely, the investor and the government concerned. The application of BOTBaC is demonstrated through using an example case.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This is a fully revised edition of the UK’s leading textbook on the law governing construction contracts and the management and administration of those contracts. Although the legal principles involved are an aspect of general contract law, the practical and commercial complexities of the construction industry have increasingly made this a specialist area. This new edition has been brought up to date with recent cases and developments in the law as it stands at March 2007. The basic approach of the book has been retained. Rather than provide a commentary on standard-form contracts, our approach is to introduce the general principles that underlie contracts in construction, illustrating them by reference to the most important standard forms currently in use. Some of the common standard-form contracts have been revised since the previous edition, and the text has been revised to take account of these changes. Practitioners (consultants, builders, clients and lawyers) will find this an extremely useful source of reference, providing in-depth explanations for all of the features found in contemporary construction contracts, with reasons. A unique feature of this book is the way that it brings together the relevant principles of law with the practical issues arising in construction cases. It is a key text for construction undergraduates and postgraduates as well as for those taking the RIBA Part III and CIOB Part II examinations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Changes to client requirements are inevitable during construction. Industry discourse is concerned with minimizing and controlling changes. However, accounts of practices involved in making changes are rare. In response to calls for more research into working practices, an ethnographic study of a live hospital project was undertaken to explore how changes are made. A vignette of a meeting exploring the investigation of changes illustrates the issues. This represents an example from the ethnographic fieldwork, which produced many observations. There was a strong emphasis on using change management procedures contained within the contract to investigate changes, even when it was known that the change was not required. For the practitioners, this was a way of demonstrating best practice, transparent and accountable decision-making regarding changes. Hence, concerns for following procedures sometimes overshadowed considerations about whether or not a change was required to improve the functionality of the building. However, the procedures acted as boundary objects between the communities of practice involved on the project by coordinating the work of managing changes. Insights suggest how contract procedures facilitate and impede the making of changes, which can inform policy guidance and contract drafting.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the global construction context, the best value or most economically advantageous tender is becoming a widespread approach for contractor selection, as an alternative to other traditional awarding criteria such as the lowest price. In these multi-attribute tenders, the owner or auctioneer solicits proposals containing both a price bid and additional technical features. Once the proposals are received, each bidder’s price bid is given an economic score according to a scoring rule, generally called an economic scoring formula (ESF) and a technical score according to pre-specified criteria. Eventually, the contract is awarded to the bidder with the highest weighted overall score (economic + technical). However, economic scoring formula selection by auctioneers is invariably and paradoxically a highly intuitive process in practice, involving few theoretical or empirical considerations, despite having been considered traditionally and mistakenly as objective, due to its mathematical nature. This paper provides a taxonomic classification of a wide variety of ESFs and abnormally low bids criteria (ALBC) gathered in several countries with different tendering approaches. Practical implications concern the optimal design of price scoring rules in construction contract tenders, as well as future analyses of the effects of the ESF and ALBC on competitive bidding behaviour.