The technique of linear responsibility analysis is used for a retrospective case study of a private development consisting of an extension to an existing building to provide a wholesale butchery facility. The project used a conventionally organized management process. The organization structure adopted on the project is analysed using concepts from the systems theory, which are included in Walkers theoretical model of the structure of building project organizations. This model proposes that the process of building provision can be viewed as systems and sub-systems that are differentiated from each other at decision points. Further to this, the sub-systems can be viewed as the interaction of managing system and operating system. Using Walkers model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. The project's organization structure diverged from the models propositions resulting in delay to the project's completion and cost overrun but the client was satisfied with the project functionally.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A methodology for using remotely sensed data to both generate and evaluate a hydraulic model of floodplain inundation is presented for a rural case study in the United Kingdom: Upton-upon-Severn. Remotely sensed data have been processed and assembled to provide an excellent test data set for both model construction and validation. In order to assess the usefulness of the data and the issues encountered in their use, two models for floodplain inundation were constructed: one based on an industry standard one-dimensional approach and the other based on a simple two-dimensional approach. The results and their implications for the future use of remotely sensed data for predicting flood inundation are discussed. Key conclusions for the use of remotely sensed data are that care must be taken to integrate different data sources for both model construction and validation and that improvements in ground height data shift the focus in terms of model uncertainties to other sources such as boundary conditions. The differences between the two models are found to be of minor significance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dog-in-a-Doublet Bridge Reconstruction Scheme integrates the interdisciplinary design to provide solution for different needs: to provide a crossing to carry the new 40-tonne loading requirement, to improve the visibility of the substandard junction, and within the funding available. The management of the project involves the co-ordination of different authorities, statutory undertakers and other bodies. At certain stages, there were negotiations with RSPB on the restriction of construction period from July to November. After the re-assessment of the environmental impact of the construction on the breeding and wintering birds, the restrict was waived. As the bid for the assessment, strengthening and structural maintenance of bridges in the Cambridgeshire County Council Transport Policies and Programme No. 21 (1995/96) for Dog-in-a-Doublet Bridge Reconstruction Schemes was unsuccessful to attract the Transport Supplement Grant (TSG). A series of temporary measures had to be undertaken until funding is available for its replacement.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is a lack of knowledge base in relation to experiences gained and lessons learnt from previously executed National Health Service (NHS) infrastructure projects in the UK. This is in part a feature of one-off construction projects, which typify healthcare infrastructure, and in part due to the absence of a suitable method for conveying such information. The complexity of infrastructure delivery process in the NHS makes the construction of healthcare buildings a formidable task. This is particularly the case for the NHS trusts who have little or no experience of construction projects. To facilitate understanding a most important aspect of the delivery process, which is the preparation of a capital investment proposal; steps taken in developing the business case for an NHS healthcare facility are examined. The context for such examination is provided by the planning process of a healthcare project, studied retrospectively. The process is analysed using a social science based method called ‘building stories’, developed at the University of California-Berkeley. By applying this method, stories or narratives are constructed around the data captured on the case study. The findings indicate that the business case process may be used to justify, rather than identify, trusts’ requirements. The study is useful for UK public sector clients as well as consultants and professionals who aim to participate in the delivery of healthcare infrastructure projects in the UK.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper provides a case study of the City of Manchester Stadium based on relevant literatures, based on a comprehensive description of multidisciplinary, cross-sectoral and future-oriented requirements and operations in the design of modern intelligent sports buildings. The successfulness of the City of Manchester Stadium gives constructive experience and knowledge for the building professions including architecture, building structure, building services, construction, and facilities management, etc. In addition, this paper is valuable for developing intelligent sports buildings in China.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper aims to introduce a knowledge-based managemental prototype entitled Eþ for environmental-conscious construction relied on an integration of current environmental management tools in construction area. The overall objective of developing the Eþ prototype is to facilitate selectively reusing the retrievable knowledge in construction engineering and management areas assembled from previous projects for the best practice in environmental-conscious construction. The methodologies adopted in previous and ongoing research related to the development of the Eþ belong to the operations research area and the information technology area, including literature review, questionnaire survey and interview, statistical analysis, system analysis and development, experimental research and simulation, and so on. The content presented in this paper includes an advanced Eþ prototype, a comprehensive review of environmental management tools integrated to the Eþ prototype, and an experimental case study of the implementation of the Eþ prototype. It is expected that the adoption and implementation of the Eþ prototype can effectively facilitate contractors to improve their environmental performance in the lifecycle of projectbased construction and to reduce adverse environmental impacts due to the deployment of various engineering and management processes at each construction stage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article introduces a quantitative approach to e-commerce system evaluation based on the theory of process simulation. The general concept of e-commerce system simulation is presented based on the considerations of some limitations in e-commerce system development such as the huge amount of initial investments of time and money, and the long period from business planning to system development, then to system test and operation, and finally to exact return; in other words, currently used system analysis and development method cannot tell investors about some keen attentions such as how good their e-commerce system could be, how many investment repayments they could have, and which area they should improve regarding the initial business plan. In order to exam the value and its potential effects of an e-commerce business plan, it is necessary to use a quantitative evaluation approach and the authors of this article believe that process simulation is an appropriate option. The overall objective of this article is to apply the theory of process simulation to e-commerce system evaluation, and the authors will achieve this though an experimental study on a business plan for online construction and demolition waste exchange. The methodologies adopted in this article include literature review, system analysis and development, simulation modelling and analysis, and case study. The results from this article include the concept of e-commerce system simulation, a comprehensive review of simulation methods adopted in e-commerce system evaluation, and a real case study of applying simulation to e-commerce system evaluation. Furthermore, the authors hope that the adoption and implementation of the process simulation approach can effectively support business decision-making, and improve the efficiency of e-commerce systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose - The purpose of this paper is to provide a quantitative multicriteria decision-making approach to knowledge management in construction entrepreneurship education by means of an analytic knowledge network process (KANP) Design/methodology/approach- The KANP approach in the study integrates a standard industrial classification with the analytic network process (ANP). For the construction entrepreneurship education, a decision-making model named KANP.CEEM is built to apply the KANP method in the evaluation of teaching cases to facilitate the case method, which is widely adopted in entrepreneurship education at business schools. Findings- The study finds that there are eight clusters and 178 nodes in the KANP.CEEM model, and experimental research on the evaluation of teaching cases discloses that the KANP method is effective in conducting knowledge management to the entrepreneurship education. Research limitations/implications- As an experimental research, this paper ignores the concordance between a selected standard classification and others, which perhaps limits the usefulness of KANP.CEEM model elsewhere. Practical implications- As the KANP.CEEM model is built based on the standard classification codes and the embedded ANP, it is thus expected that the model has a wide potential in evaluating knowledge-based teaching materials for any education purpose with a background from the construction industry, and can be used by both faculty and students. Originality/value- This paper fulfils a knowledge management need and offers a practical tool for an academic starting out on the development of knowledge-based teaching cases and other teaching materials or for a student going through the case studies and other learning materials.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Clients and contractors need to be aware of the project’s legal environment because the viability of a procurement strategy can be vitiated by legal rules. This is particularly true regarding Performance-Based Contracting (PBC) whose viability may be threatened by rules of property law: while the PBC concept does not require that the contractor transfers the ownership in the building materials used to the client, the rules of property law often lead to an automatic transfer of ownership. But does the legal environment really render PBC unfeasible? In particular, is PBC unfeasible because contractors lose their materials as assets? These questions need to be answered with respect to the applicable property law. As a case study, English property law has been chosen. Under English law, the rule which governs the automatic transfer of ownership is called quicquid plantatur solo, solo credit (whatever is fixed to the soil belongs to the soil). An analysis of this rule reveals that not all materials which are affixed to land become part of the land. This fate only occurs in relation to materials which have been affixed with the intention of permanently improving the land. Five fictitious PBC cases have been considered in terms of the legal status of the materials involved, and several subsequent legal questions have been addressed. The results suggest that English law does actually threaten the feasibility of PBC in some cases. However, it is also shown that the law provides means to circumvent the unwanted results which flow from the rules of property law. In particular, contractors who are interested in keeping their materials as assets can insist on agreeing a property right in the client’s land, i.e. a contractor’s lien. Therefore, the outcome is that English property law does not render the implementation of the PBC concept unfeasible. At a broader level, the results contribute to the theoretical framework of PBC as an increasingly used procurement strategy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

FIDIC has over the years produced standard forms of contracts for the international procurement of projects. A source of continuing criticism of its Red Book concerns the duality in the traditional role of the engineer as the employer's agent and as an independent third party holding the balance fairly between the employer and the contractor. In response to this and other criticisms FIDIC produced a replacement for it in 1999. The role of the engineer under the new Red Book is critically examined in the light of relevant case law, expert commentaries and feedback from two multidisciplinary workshops with international participation. The examination identified three major changes: (1) a duty to act impartially has been replaced by a duty to make fair determination of certain matters; (2) it is open to parties to allow greater control of the engineer by the employer by stating in the appropriate part of the contract powers the engineer must not exercise without the employer's approval; (3) there is provision for a Dispute Adjudication Board (DAB) to which disputes may be referred. Although the duality has not been eliminated completely, the contract is structured flexibly enough to support those who wish to contract on the basis of the engineer acting solely as the agent of the employer.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Research is described that sought to understand how senior managers within regional contracting firms conceptualize and enact competitiveness. Existing formal discourses of construction competitiveness include the discourse of 'best practice' and the various theories of competitiveness as routinely mobilized within the academic literature. Such discourses consistently underplay the influence of contextual factors in shaping how competitiveness is enacted. An alternative discourse of competitiveness is outlined based on the concepts of localized learning and embeddedness. Two case studies of regional construction firms provide new insights into the emergent discourses of construction competitiveness. The empirical findings resonate strongly with the concepts of localized learning and embeddedness. The case studies illustrate the importance of de-centralized structures which enable multiple business units to become embedded within localized markets. A significant degree of autonomy is essential to facilitate localized entrepreneurial behaviour. In essence, sustained competitiveness was found to depend upon the extent to which de-centralized business units enact ongoing processes of localized learning. Once local business units have become embedded within localized markets the essential challenge is how to encourage continued entrepreneurial behaviour while maintaining a degree of centralized control and coordination. Of key importance is the recognition that the capabilities that make companies competitive transcend organizational boundaries such that they become situated within complex networks of relational ties.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The UK industry has been criticised for being slow to adopt construction process innovations. Research shows that the idiosyncrasies of participants, their roles in the system and the contextual differences between sections of the industry make this a highly complex problem. There is considerable evidence that informal social networks play a key role in diffusion of innovations. The aim is to identify informal communication networks of project participants and the role these play in the diffusion of construction innovations. The characteristics of this network will be analysed in order to understand how they can be used to accelerate innovation diffusion within and between projects. Social Network Analysis is used to determine informal communication routes. Control and experiment case study projects are used within two different organizations. This allows informal communication routes concerning innovations to be mapped, whilst testing if the informal routes can facilitate diffusion. Analysis will focus upon understanding the combination of informal strong and weak ties, and how these impede or facilitate the diffusion of the innovation. Initial work suggests the presence of an informal communication network. Actors within this informal network, and the organization's management are unaware of its' existence and their informal roles within it. Thus, the network remains an untapped medium regarding innovation diffusion. It is proposed that successful innovation diffusion is dependent upon understanding informal strong and weak ties, at project, organization and industry level.