88 resultados para Building Technologies


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The building industry is often berated for its short comings in meeting up with the demand for the provision of new housing. Addressing the need for new housing stock is a challenge that has led to debates among professional bodies, the construction sector, housing industry and government. The introduction of new manufacturing technologies is often offered as a solution, but the challenges of increasing the amount of off-site construction in residential building are well known and well-rehearsed. The modern flying factory (MFF) is a concept that involves the manufacture of specific components or modules in temporary off- or near- site locations using relatively simple and quick to set up and dismantle technologies and processes. The aim is to produce short batches and hence achieve some of the benefits of off-site manufacture on a much smaller scale than in dedicated factory environments. A case study of a modern flying factory being set up to produce pre-assembled utility cupboards for a large residential development in London is presented, involving participant observation and informal interviews with key actors on the design and operationalising of the process. The case reveals that although there are costs, efficiency and health and safety benefits to using MFF approaches, there are also challenges to overcome over the time required to set up and establish the process for relatively short runs, and in evaluating whether the MFF or traditional site based production is most effective for particular aspects of projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Current approaches for the reduction of carbon emissions in buildings are often predicated on the integration of renewable technologies into building projects. Building integrated photovoltaics (BIPV) is one of these technologies and brings its own set of challenges and problems with a resulting mutual articulation of this technology and the building. A Social Construction of Technology (SCOT) approach explores how negotiations between informal groups of project actors with shared interests shape the ongoing specification of both BIPV and the building. Six main groups with different interests were found to be involved in the introduction of BIPV (Cost Watchers, Design Aesthetes, Green Guardians, Design Optimizers, Generation Maximizers and Users). Their involvement around three sets of issues (design changes from lack of familiarity with the technology, misunderstandings from unfamiliar interdependencies of trades and the effects of standard firm procedure) is followed. Findings underline how BIPV requires a level of integration that typically spans different work packages and how standard contractual structures inhibit the smooth incorporation of BIPV. Successful implementation is marked by ongoing (re-)design of both the building and the technology as informal fluid groups of project actors with shared interests address the succession of problems which arise in the process of implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Innovative, low carbon technologies are already available for use in the construction of buildings, but the impact of their specification on construction projects is unclear. This exploratory research identifies issues which arise following the specification of BIPV in non-residential construction projects. Rather than treating the inclusion of a new technology as a technical problem, the research explores the issue from a socio-technical perspective to understand the accommodations which the project team makes and their effect on the building and the technology. The paper is part of a larger research project which uses a Social Construction of Technology Approach (SCOT) to explore the accommodations made to working practices and design when Building Integrated PhotoVoltaic (BIPV) technology is introduced. The approach explores how the requirements of the technology from different groups of actors (Relevant Social Groups or RSG's) give rise to problems and create solutions. As such it rejects the notion of a rational linear view of innovation diffusion; instead it suggests that the variety and composition of the Relevant Social Groups set the agenda for problem solving and solutions as the project progresses. The research explores the experiences of three people who have extensive histories of involvement with BIPV in construction, looks at how SCOT can inform our understanding of the issues involved and identifies themes and issues in the specification of BIPV on construction projects. A key finding concerns the alignment of inflection points at which interviewees have found themselves changing from one RSG to another as new problems and solutions are identified. The points at which they change RSG often occurred at points which mirror conventional construction categories (in terms of project specification, tender, design and construction).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With the increase in e-commerce and the digitisation of design data and information,the construction sector has become reliant upon IT infrastructure and systems. The design and production process is more complex, more interconnected, and reliant upon greater information mobility, with seamless exchange of data and information in real time. Construction small and medium-sized enterprises (CSMEs), in particular,the speciality contractors, can effectively utilise cost-effective collaboration-enabling technologies, such as cloud computing, to help in the effective transfer of information and data to improve productivity. The system dynamics (SD) approach offers a perspective and tools to enable a better understanding of the dynamics of complex systems. This research focuses upon system dynamics methodology as a modelling and analysis tool in order to understand and identify the key drivers in the absorption of cloud computing for CSMEs. The aim of this paper is to determine how the use of system dynamics (SD) can improve the management of information flow through collaborative technologies leading to improved productivity. The data supporting the use of system dynamics was obtained through a pilot study consisting of questionnaires and interviews from five CSMEs in the UK house-building sector.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Different treatments that could be implemented in the home environ-ment are evaluated with the objective of reaching a more rational and efficient use of energy. We consider that a detailed knowledge of energy-consuming behaviour is paramount for the development and implementation of new technologies, services and even policies that could result in more rational energy use. The proposed evaluation methodology is based on the development of economic experiments implemented in an experimental economics laboratory, where the behaviour of individuals when making decisions related to energy use in the domestic environment can be tested.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Turbulence statistics obtained by direct numerical simulations are analysed to investigate spatial heterogeneity within regular arrays of building-like cubical obstacles. Two different array layouts are studied, staggered and square, both at a packing density of λp=0.25 . The flow statistics analysed are mean streamwise velocity ( u− ), shear stress ( u′w′−−−− ), turbulent kinetic energy (k) and dispersive stress fraction ( u˜w˜ ). The spatial flow patterns and spatial distribution of these statistics in the two arrays are found to be very different. Local regions of high spatial variability are identified. The overall spatial variances of the statistics are shown to be generally very significant in comparison with their spatial averages within the arrays. Above the arrays the spatial variances as well as dispersive stresses decay rapidly to zero. The heterogeneity is explored further by separately considering six different flow regimes identified within the arrays, described here as: channelling region, constricted region, intersection region, building wake region, canyon region and front-recirculation region. It is found that the flow in the first three regions is relatively homogeneous, but that spatial variances in the latter three regions are large, especially in the building wake and canyon regions. The implication is that, in general, the flow immediately behind (and, to a lesser extent, in front of) a building is much more heterogeneous than elsewhere, even in the relatively dense arrays considered here. Most of the dispersive stress is concentrated in these regions. Considering the experimental difficulties of obtaining enough point measurements to form a representative spatial average, the error incurred by degrading the sampling resolution is investigated. It is found that a good estimate for both area and line averages can be obtained using a relatively small number of strategically located sampling points.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper uses a Foucauldian governmentality framework to analyse and interrogate the discourses and strategies adopted by the state and sections of the business community in their attempts to shape and influence emerging agendas of governance in post-devolution Scotland. Much of the work on governmentality has examined the ways in which governments have developed particular techniques, rationales and mechanisms to enable the functioning of governance programmes. This paper expands upon such analyses by also looking at the ways in which particular interests may use similar procedures, discourses and practices to promote their own agendas and develop new forms of resistance, contestation and challenge to emerging policy frameworks. Using the example of business interest mobilization in post-devolution Scotland, it is argued that governments may seek to mobilize defined forms of expertise and knowledge, linking them to wider political debates. This, however, creates new opportunities for interests to shape and contest the discourses and practices of government. The governmentalization of politics can, therefore, be seen as more of a dialectical process of definition and contestation than is often apparent in existing Foucault-inspired writing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The principles of organization theory are applied to the organization of construction projects. This is done by proposing a framework for modelling the whole process of building procurement. This consists of a framework for describing the environments within which construction projects take place. This is followed by the development of a series of hypotheses about the organizational structure of construction projects. Four case studies are undertaken, and the extent to which their organizational structure matches the model is compared to the level of success achieved by each project. To this end there is a systematic method for evaluating the success of building project organizations, because any conclusions about the adequacy of a particular organization must be related to the degree of success achieved by that organization. In order to test these hypotheses, a mapping technique is developed. The technique offered is a development of a technique known as Linear Responsibility Analysis, and is called "3R analysis" as it deals with roles, responsibilities and relationships. The analysis of the case studies shows that they tended to suffer due to inappropriate organizational structure. One of the prevailing problems of public sector organization is that organizational structures are inadequately defined, and too cumbersome to respond to environmental demands on the project. The projects tended to be organized as rigid hierarchies, particularly at decision points, when what was required was a more flexible, dynamic and responsive organization. The study concludes with a series of recommendations; including suggestions for increasing the responsiveness of construction project organizations, and reducing the lead-in times for the inception periods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a clear need for financial protection in the construction industry, both to guarantee satisfactory completion of construction projects and to guard against non-payment. However, the cost of financial protection is often felt to be disproportionately high, with unnecessary overlap between different measures. The Reading Construction Forum has commissioned and steered research which is published in this report in an effort to bring the problem out into the open and to clarify the various options open to the various parties and stakeholders in the construction process. "Financial Protection in the UK Building Industry" is the first definitive report on the subject, offering an accurate and simple guide that all levels within the construction industry can understand. This accessible new guide considers the problem of financial protection and clearly lays out the alternative solutions.It looks by turn at the client, the main contractor, and the sub-contractor, discussing which financial protection options are available to each of them, and considers the pros and cons of each option. The cost of each type of financial protection is weighed against the amount of protection provided and the risks involved. The book concludes with guidance for consultants, emphasising relevant points to consider when advising clients and contractors about which type of financial protection to choose. "Financial Protection in the UK Building Industry" was researched by a literature search, collection of statistical data, and financial data, as well as discussions with clients, contractors, sub-contractors and consultants. This investigation has shown that the direct costs of implementing financial protection measures are marginal, and that wider adoption of payment protection would create a more equitable situation between contracting parties.This guide will enable anyone in the construction industry to consider all the options, and determine what is the best solution for them. "Reading Construction Forum Financial Protection for the UK Building Industry" was complied by the University of Reading, funded by the Reading Construction Forum. The Forum has recently commissioned and steered a number of high-profile reports covering important aspects of the construction industry. Members of the Forum include major companies which are concerned with achieving high quality in the design, construction and use of commercial, retail and industrial buildings. All are committed to change and innovation in the British and European construction industries.