60 resultados para Best practices in public policies
Resumo:
Improved upland rice cultivars introduced in Volta Region, Ghana, have been perceived to store poorly compared to farmers' traditional cultivars. A survey was conducted in 2003 in the Hohoc district of this region, where a participatory Varietal Selection programme had started in 1997, to gain insight into fanners' seed production and storage practices that are likely to affect seed quality in storage. Farmers rated keeping quality (p < 0.001), tolerance to storage pests (p < 0.001), seed quality (p < 0.001) and establishment of their local cultivars Kawomo, Viono and Wuwulili as much better than the improved cultivar IDSA 85. Initial seed moisture content ranged from 12.8 to 18% and germination from 0 to 82%. There was a significant relationship between seed moisture content and duration of drying prior to storage (p < 0.001) and storage method (p = 0.015). Germination loss in storage was rapid at high moisture content and slow at low moisture content. Between 60 and 80% of seeds germinated after six Months storage at 12.8% moisture content. The viability equation predicted accurately germination of farmer-saved seed stored under ambient temperature in Ghana. Except for the japonica rice cultivar WAB 126-18-HB, the traditional cultivars Kawomo, Viono and Wuwulili survived better in storage than improved cultivars. There is a need to improve seed quality of improved cultivars if farmers are to benefit from their higher yields and grain quality and to improve storage practices.
Resumo:
We use a detailed study of the knowledge work around visual representations to draw attention to the multidimensional nature of `objects'. Objects are variously described in the literatures as relatively stable or in flux; as abstract or concrete; and as used within or across practices. We clarify these dimensions, drawing on and extending the literature on boundary objects, and connecting it with work on epistemic and technical objects. In particular, we highlight the epistemic role of objects, using our observations of knowledge work on an architectural design project to show how, in this setting, visual representations are characterized by a `lack' or incompleteness that precipitates unfolding. The conceptual design of a building involves a wide range of technical, social and aesthetic forms of knowledge that need to be developed and aligned. We explore how visual representations are used, and how these are meaningful to different stakeholders, eliciting their distinct contributions. As the project evolves and the drawings change, new issues and needs for knowledge work arise. These objects have an `unfolding ontology' and are constantly in flux, rather than fully formed. We discuss the implications for wider understandings of objects in organizations and for how knowledge work is achieved in practice.
Resumo:
Information technologies are used across all stages of the construction process, and are crucial in the delivery of large projects. Drawing on detailed research on a construction megaproject, we take a practice-based approach to examining the practical and theoretical tensions between existing ways of working and the introduction of new coordination tools in this paper. We analyze the new hybrid practices that emerge, using insights from actor-network theory to articulate the delegation of actions to material and digital objects within ecologies of practice. The three vignettes that we discuss highlight this delegation of actions, the “plugging” and “patching” of ecologies occurring across media and the continual iterations of working practices between different types of media. By shifting the focus from tools to these wider ecologies of practice, the approach has important managerial mplications for the stabilization of new technologies and practices and for managing technological change on large construction projects. We conclude with a discussion of new directions for research, oriented to further elaborating on the importance of the material in understanding change.
Resumo:
A review of current risk pricing practices in the financial, insurance and construction sectors is conducted through a comprehensive literature review. The purpose was to inform a study on risk and price in the tendering processes of contractors: specifically, how contractors take account of risk when they are calculating their bids for construction work. The reference to mainstream literature was in view of construction management research as a field of application rather than a fundamental academic discipline. Analytical models are used for risk pricing in the financial sector. Certain mathematical laws and principles of insurance are used to price risk in the insurance sector. construction contractors and practitioners are described to traditionally price allowances for project risk using mechanisms such as intuition and experience. Project risk analysis models have proliferated in recent years. However, they are rarely used because of problems practitioners face when confronted with them. A discussion of practices across the three sectors shows that the construction industry does not approach risk according to the sophisticated mechanisms of the two other sectors. This is not a poor situation in itself. However, knowledge transfer from finance and insurance can help construction practitioners. But also, formal risk models for contractors should be informed by the commercial exigencies and unique characteristics of the construction sector.
Resumo:
New skills are needed to compete, as integrated software solutions provide a digital infrastructure for projects. This changes the practice of information management and engineering design on next generation projects.