34 resultados para multi-storey apartment building


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Forests are a store of carbon and an eco-system that continually removes carbon dioxide from the atmosphere. If they are sustainably managed, the carbon store can be maintained at a constant level, while the trees removed and converted to timber products can form an additional long term carbon store. The total carbon store in the forest and associated ‘wood chain’ therefore increases over time, given appropriate management. This increasing carbon store can be further enhanced with afforestation. The UK’s forest area has increased continually since the early 1900s, although the rate of increase has declined since its peak in the late 1980s, and it is a similar picture in the rest of Europe. The increased sustainable use of timber in construction is a key market incentive for afforestation, which can make a significant contribution to reducing carbon emissions. The case study presented in this paper demonstrates the carbon benefits of a Cross Laminated Timber (CLT) solution for a multi-storey residential building in comparison with a more conventional reinforced concrete solution. The embodied carbon of the building up to completion of construction is considered, together with the stored carbon during the life of the building and the impact of different end of life scenarios. The results of the study show that the total stored carbon in the CLT structural frame is 1215tCO2 (30tCO2 per housing unit). The choice of treatment at end of life has a significant effect on the whole life embodied carbon of the CLT frame, which ranges from -1017 tCO2e for re-use to +153tCO2e for incinerate without energy recovery. All end of life scenarios considered result in lower total CO2e emissions for the CLT frame building compared with the reinforced concrete frame solution.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building refurbishment is key to reducing the carbon footprint and improving comfort in the built environment. However, quantifying the real benefit of a facade change, which can bring advantages to owners (value), occupants (comfort) and the society (sustainability), is not a simple task. At a building physics level, the changes in kWh per m2 of heating / cooling load can be readily quantified. However, there are many subtle layers of operation and mainte-nance below these headline figures which determine how sustainable a building is in reality, such as for example quality of life factors. This paper considers the range of approached taken by a fa/e refurbishment consortium to assess refurbishment solutions for multi-storey, multi-occupancy buildings and how to critically evaluate them. Each of the applued tools spans one or more of the three building parameters of people, product and process. 'De-cision making' analytical network process and parametric building analysis tools are described and their potential impact on the building refurbishment process evaluated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Multi-agent systems have been adopted to build intelligent environment in recent years. It was claimed that energy efficiency and occupants' comfort were the most important factors for evaluating the performance of modem work environment, and multi-agent systems presented a viable solution to handling the complexity of dynamic building environment. While previous research has made significant advance in some aspects, the proposed systems or models were often not applicable in a "shared environment". This paper introduces an ongoing project on multi-agent for building control, which aims to achieve both energy efficiency and occupants' comfort in a shared environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Existing buildings contribute greatly to global energy use and greenhouse gas emissions. In the UK, about 18% of carbon emissions are generated by non-domestic buildings; sustainable building refurbishment can play an important role in reducing carbon emissions. This paper looks at the performance of a recently refurbished 5-storey office building in London, in terms of energy consumption as well as occupants’ satisfaction. Pre- and post-occupancy evaluation studies were conducted using online questionnaire surveys and energy consumption evaluation. Results from pre-occupancy and post-occupancy evaluation studies showed that employees, in general, were more satisfied with their work environment at the refurbished building than with that of their previous office. Employees’ self-reported productivity improved after the move to Elms House. These surveys showed a positive relationship between employees’ satisfaction with their work environment and their self-reported productivity, well-being and enjoyment at work. The factor that contributed to increasing employee satisfaction the most was: better use of interior space. Although the refurbishment was a success in terms of reducing energy consumption per m2, the performance gap was almost 3 times greater than that estimated. Unregulated loads, problems with building control, ineffective use of space and occupants’ behaviour are argued to be reasons for this gap.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lighting and small power will typically account for more than half of the total electricity consumption in an office building. Significant variations in electricity used by different tenants suggest that occupants can have a significant impact on the electricity demand for these end-uses. Yet current modelling techniques fail to represent the interaction between occupant and the building environment in a realistic manner. Understanding the impact of such behaviours is crucial to improve the methodology behind current energy modelling techniques, aiming to minimise the significant gap between predicted and in-use performance of buildings. A better understanding of the impact of occupant behaviour on electricity consumption can also inform appropriate energy saving strategies focused on behavioural change. This paper reports on a study aiming to assess the intent of occupants to switch off lighting and appliances when not in use in office buildings. Based on the Theory of Planned Behaviour, the assessment takes the form of a questionnaire and investigates three predictors to behaviour individually: 1) behavioural attitude; 2) subjective norms; 3) perceived behavioural control. The paper details the development of the assessment procedure and discusses preliminary findings from the study. The questionnaire results are compared against electricity consumption data for individual zones within a multi-tenanted office building. Initial results demonstrate a statistically significant correlation between perceived behavioural control and energy consumption for lighting and small power

Relevância:

100.00% 100.00%

Publicador:

Resumo:

How effective are multi-stakeholder scenarios building processes to bring diverse actors together and create a policy-making tool to support sustainable development and promote food security in the developing world under climate change? The effectiveness of a participatory scenario development process highlights the importance of ‘boundary work’ that links actors and organizations involved in generating knowledge on the one hand, and practitioners and policymakers who take actions based on that knowledge on the other. This study reports on the application of criteria for effective boundary work to a multi-stakeholder scenarios process in East Africa that brought together a range of regional agriculture and food systems actors. This analysis has enabled us to evaluate the extent to which these scenarios were seen by the different actors as credible, legitimate and salient, and thus more likely to be useful. The analysis has shown gaps and opportunities for improvement on these criteria, such as the quantification of scenarios, attention to translating and communicating the results through various channels and new approaches to enable a more inclusive and diverse group of participants. We conclude that applying boundary work criteria to multi-stakeholder scenarios processes can do much to increase the likelihood of developing sustainable development and food security policies that are more appropriate.

Relevância:

40.00% 40.00%

Publicador:

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this contribution, the English commonhold system, which enables the development of freehold units in a multi-unit development, is critically re-visited. Provision is made for the development of freehold apartments on land with a registered commonhold title. At the date of registration, a management body for the scheme, the commonhold association, must be in place. Each purchaser of a unit in the relevant building obtains freehold property on purchase. The property and management of the building housing the units and of the common areas of the scheme are, by contrast, withheld from unit holders and vested in the commonhold association, which is a special kind of body corporate. Since the coming into force of the English legislation, a set of defects have been detected. This contribution re-assesses the main problem areas and makes a number of reform suggestions drawing on material from a number of jurisdictions, notably South Africa, France and Germany. Avoidable problems are likely to arise with any conversions to commonhold from the predominant English long lease system, owing to the narrowness of the conversion rules. The manner in which ownership of units and the common parts are regulated, a key aspect in any such system, merits re-assessment. It seems that here the English rules survive comparison. The rules pertaining to constitution of the commonhold association fail to provide sufficient safeguards for unpaid scheme creditors. The rules relating leasing of commonhold units seem inadequately thought out. There is a conspicuous absence of real remedies for non-payment of assessments by unit holders. The effect of these and other aspects may help to explain why commonhold has had a limited numerical impact. The time for a second generation reforming statute may have come.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In domain of intelligent buildings, saving energy in buildings and increasing preferences of occupants are two important factors. These factors are the important keys for evaluating the performance of work environment. In recent years, many researchers combine these areas to create the system that can change from original to the modern work environment called intelligent work environment. Due to advance of agent technology, it has received increasing attention in the area of intelligent pervasive environments. In this paper, we review several issues in intelligent buildings, with respect to the implementation of control system for intelligent buildings via multi-agent systems. Furthermore, we present the MASBO (Multi-Agent System for Building cOntrol) that has been implemented for controlling the building facilities to reach the balancing between energy efficiency and occupant’s comfort. In addition to enhance the MASBO system, the collaboration through negotiation among agents is presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Development research has responded to a number of charges over the past few decades. For example, when traditional research was accused of being 'top-down', the response was participatory research, linking the 'receptors' to the generators of research. As participatory processes were recognised as producing limited outcomes, the demand-led agenda was born. In response to the alleged failure of research to deliver its products, the 'joined-up' model, which links research with the private sector, has become popular. However, using examples from animal-health research, this article demonstrates that all the aforementioned approaches are seriously limited in their attempts to generate outputs to address the multi-faceted problems facing the poor. The article outlines a new approach to research: the Mosaic Model. By combining different knowledge forms, and focusing on existing gaps, the model aims to bridge basic and applied findings to enhance the efficiency and value of research, past, present, and future.