73 resultados para employee stock option plans


Relevância:

20.00% 20.00%

Publicador:

Resumo:

An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages, their identification helps in making judgements about organizational structure on construction projects.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In a knowledge-based economy and dynamic work environment retaining competitiveness is increasingly dependent on creativity, skills, individual abilities and appropriate motivation. For instance, the UK government explicitly stated in the recent "Review of Employee Engagement and Investment" report that new ways are required through which British companies could boost employee engagement at work, improving staff commitment and, thereby, increase workplace productivity. Although creativity and innovation have been studied extensively, little is known about employees' intrinsic willingness to contribute novel ideas and solutions (defined here as creative participation). For instance, the same individual can thrive in one organisation but be completely isolated in another and the question is to what extent this depends on individual characteristics and organisational settings. The main aim of this research is, therefore, to provide a conceptual framework for identification of individual characteristics that influence employees' willingness to contribute new ideas. In order to achieve this aim the investigation will be based on a developed psychological experiment, and will include personal-profiling inventory and a questionnaire. Understanding how these parameters influence willingness of an individual to put forward created ideas would offer an opportunity for companies to improve motivation practices and team efficiency, and can consequently lead to better overall performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new approach is presented that simultaneously deals with Misreporting and Don't Know (DK) responses within a dichotomous-choice contingent valuation framework. Utilising a modification of the standard Bayesian Probit framework, a Gibbs with Metropolis-Hastings algorithm is used to estimate the posterior densities for the parameters of interest. Several model specifications are applied to two contingent valuation datasets: one on wolf management plans, and one on the US Fee Demonstration Program. We find that DKs are more likely to be from people who would be predicted to have positive utility for the bid. Therefore, a DK is more likely to be a YES than a NO. We also find evidence of misreporting, primarily in favour of the NO option. The inclusion of DK responses has an unpredictable impact on willingness-to-pay estimates, since it impacts differently on the results for the two datasets we examine. Copyright (C) 2009 John Wiley & Sons, Ltd.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document provides guidelines for fish stock assessment and fishery management using the software tools and other outputs developed by the United Kingdom's Department for International Development's Fisheries Management Science Programme (FMSP) from 1992 to 2004. It explains some key elements of the precautionary approach to fisheries management and outlines a range of alternative stock assessment approaches that can provide the information needed for such precautionary management. Four FMSP software tools, LFDA (Length Frequency Data Analysis), CEDA (Catch Effort Data Analysis), YIELD and ParFish (Participatory Fisheries Stock Assessment), are described with which intermediary parameters, performance indicators and reference points may be estimated. The document also contains examples of the assessment and management of multispecies fisheries, the use of Bayesian methodologies, the use of empirical modelling approaches for estimating yields and in analysing fishery systems, and the assessment and management of inland fisheries. It also provides a comparison of length- and age-based stock assessment methods. A CD-ROM with the FMSP software packages CEDA, LFDA, YIELD and ParFish is included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Extending the season of production and improving the scheduling of ornamental crops are key commercial objectives for nurserymen. In some woody species, the period in which cuttings can be rooted successfully is transient, thus limiting the opportunities for scheduled production. Optimum rooting often occurs in early- to mid-summer coinciding with periods of active shoot growth. The relationship between this shoot activity and root initiation was investigated in Cotinus coggygria 'Royal Purple'. Shoot growth on stock plants was manipulated by altering the photoperiod or light quality. Results indicated there were seasonal effects on rooting, but the importance of shoot activity varied with harvest time. Cuttings harvested in August had high rooting percentages, irrespective of photoperiod, and despite shoot growth terminating in response to the short-day treatment. In contrast, by September, rooting percentage was highest in cuttings from plants under long-days, which had maintained greatest shoot growth activity. Cotinus shoots grown in vitro under 16 h days showed reduced shoot growth and increased rooting competence compared with shoots grown under 8 h days. Growing stock plants under polythene films, which altered the amount and quality of the incident light, influenced the rooting of cuttings harvested in August, but no consistent relationship with shoot activity was apparent. From a practical viewpoint, maintaining shoot activity late in the season may prolong the period for propagation by cuttings; but, from a scientific viewpoint, processes associated with an active shoot apex do not provide a complete explanation of seasonal variation in rooting.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we list some new orthogonal main effects plans for three-level designs for 4, 5 and 6 factors in IS runs and compare them with designs obtained from the existing L-18 orthogonal array. We show that these new designs have better projection properties and can provide better parameter estimates for a range of possible models. Additionally, we study designs in other smaller run-sizes when there are insufficient resources to perform an 18-run experiment. Plans for three-level designs for 4, 5 and 6 factors in 13 to 17 runs axe given. We show that the best designs here are efficient and deserve strong consideration in many practical situations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The relationship between shoot growth and rooting was examined in two, 'difficult-to root' amenity trees, Syringa vulgaris L. cv. Charles Joly and Corylus avellana L. cv. Aurea. A range of treatments reflecting severity of pruning was imposed on field-grown stock prior to bud break. To minimise variation due to the numbers of buds that developed under different treatments, bud number was restricted to 30 per plant. Leafy cuttings were harvested at different stages of the active growth phase of each species. With Syringa, rooting decreased with later harvests, but loss of rooting potential was delayed in cuttings collected from the most severe pruning treatment. Rooting potential was associated with the extent of post-excision shoot growth on the cutting but regression analyses indicated that this relationship could not entirely explain the loss of rooting with time, nor the effects due to pruning. Similarly, in Corylus rooting was promoted by severe pruning, but the relationship between apical growth on the cutting and rooting was weaker than in Syringa, and only at the last harvest did growth play a critical role in determining rooting. Another unusual factor of the last harvest of Corylus was a bimodal distribution of roots per cutting, with very few rooted cuttings having less than five roots. This implies that, for this harvest at least, the potential of an individual cutting to root is probably not limited by the number of potential rooting sites.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A field study assessed subjective reports of distraction from various office sounds among 88 employees at two sites. In addition, the study examined the amount of exposure the workers had to the noise in order to determine any evidence for habituation. Finally, respondents were asked how they would improve their environment ( with respect to noise), and to rate examples of improvements with regards to their job satisfaction and performance. Out of the sample, 99% reported that their concentration was impaired by various components of office noise, especially telephones left ringing at vacant desks and people talking in the background. No evidence for habituation to these sounds was found. These results are interpreted in the light of previous research regarding the effects of noise in offices and the 'irrelevant sound effect'.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Climate change is expected to produce reductions in water availability in England, potentially necessitating adaptive action by the water industry to maintain supplies. As part of Ofwat's fifth Periodic Review (PR09), water companies recently released their draft Water Resources Management Plans, setting out how each company intends to maintain the balance between the supply and demand for water over the next 25 years, following Environment Agency guidelines. This paper reviews these plans to determine company estimates of the impact of climate change on water supply relative to other resource pressures. The approaches adopted for incorporating the impact in the plans and the proposed management solutions are also identified. Climate change impacts for individual resource zones range from no reductions in deployable output to greater than 50% over the planning period. The estimated national aggregated loss of deployable output under a “core” climate scenario is ~520 Ml/d (3% of deployable output) by 2034/35, the equivalent of the supply of one entire water company (South West Water). Climate change is the largest single driver of change in water supplies over the planning period. Over half of the climate change impact is concentrated in southern England. In extreme cases, climate change uncertainty is of the same magnitude as the change under the core scenario (up to a loss of ~475 Ml/d). 44 of the 68 resource zones with available data are estimated to have a climate change impact. In 35 of these climate change has the greatest impact although in 10 zones sustainability reductions have a greater impact. Of the overall change in downward pressure on the supply-demand balance over the planning period, ~56% is accounted for by increased demand (620 Ml/d) and supply side climate change accounts for ~37% (407 Ml/d). Climate change impacts have a cumulative impact in concert with other changing supply side reducing components increasing the national pressure on the supply-demand balance. Whilst the magnitude of climate change appears to justify its explicit consideration, it is rare that adaptation options are planned solely in response to climate change but as a suite of options to provide a resilient supply to a range of pressures (including significant demand side pressures). Supply-side measures still tend to be considered by water companies to be more reliable than demand-side measures.