55 resultados para Theater and Performance.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The traditional independent variable in the multinationality and performance literature is the ratio of foreign (F) to total (T) sales, (F/T). This can now be supplemented by a new regional variable, the ratio of regional (R) to total (T) sales, i.e. (R/T). Data are presented on both (F/T) and (R/T) for both sales and assets for a 5-year period, 2001–2005. New tests are reported on (R/T) as it affects a financial measure of performance, the Tobin's Q. Implications are drawn for future research on the S-curve relationship between multinationality and performance in the light of this regional phenomenon.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper deals with the energy consumption and the evaluation of the performance of air supply systems for a ventilated room involving high- and low-level supplies. The energy performance assessment is based on the airflow rate, which is related to the fan power consumption by achieving the same environmental quality performance for each case. Four different ventilation systems are considered: wall displacement ventilation, confluent jets ventilation, impinging jet ventilation and a high level mixing ventilation system. The ventilation performance of these systems will be examined by means of achieving the same Air Distribution Index (ADI) for different cases. The widely used high-level supplies require much more fan power than those for low-level supplies for achieving the same value of ADI. In addition, the supply velocity, hence the supply dynamic pressure, for a high-level supply is much larger than for low-level supplies. This further increases the power consumption for high-level supply systems. The paper considers these factors and attempts to provide some guidelines on the difference in the energy consumption associated with high and low level air supply systems. This will be useful information for designers and to the authors' knowledge there is a lack of information available in the literature on this area of room air distribution. The energy performance of the above-mentioned ventilation systems has been evaluated on the basis of the fan power consumed which is related to the airflow rate required to provide equivalent indoor environment. The Air Distribution Index (ADI) is used to evaluate the indoor environment produced in the room by the ventilation strategy being used. The results reveal that mixing ventilation requires the highest fan power and the confluent jets ventilation needs the lowest fan power in order to achieve nearly the same value of ADI.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A representative community sample of primiparous depressed women and a nondepressed control group were assessed while in interaction with their infants at 2 months postpartum. At 3 months, infants were assessed on the Still-face perturbation of face to face interaction, and a subsample completed an Instrumental Learning paradigm. Compared to nondepressed women, depressed mothers' interactions were both less contingent and less affectively attuned to infant behavior. Postnatal depression did not adversely affect the infant's performance in either the Still-face perturbation or the Instrumental Learning assessment. Maternal responsiveness in interactions at 2 months predicted the infant's performance in the Instrumental Learning assessment but not in the Still-face perturbation. The implications of these findings for theories of infant cognitive and emotional development are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.

Relevância:

100.00% 100.00%

Publicador: