The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational structure within a project needs to be responsive, and dynamic. These needs are often not satisfied in the construction industry, due to the lack of analytical tools with which to analyse the environment and to design appropriate temporary organizations. This paper presents two techniques. First is the technique of "Environmental Complexity Analysis", which identifies the key variables in the environment of the construction project. These are classified as Financial, Legal, Technological, Aesthetic and Policy. It is proposed that their identification will set the parameters within which the project has to be managed. This provides a basis for the project managers to define the relevant set of decision points that will be required for the project. The Environmental Complexity Analysis also identifies the project's requirements for control systems concerning Budget, Contractual, Functional, Quality and Time control. The process of environmental scanning needs to be done at regular points during the procurement process to ensure that the organizational structure is adaptive to the changing environment. The second technique introduced is the technique of "3R analysis", being a graphical technique for describing and modelling Roles, Responsibilities and Relationships. A list of steps is introduced that explains the procedure recommended for setting up a flexible organizational structure that is responsive to the environment of the project. This is by contrast with the current trend towards predetermined procurement paths that may not always be in the best interests of the client.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The origins of the various procurement methods in construction are considered, followed by a discussion of the circumstances for which each procurement system is best suited. The likely future development sin management-based methods are discussed in the context of current research, showing that co-ordination of trade and specialist contractors , more flexible contracting, constructive conflict management and a potential polarization of views about project management in the industry are likely.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although much literature on construction procurement is based on personal experiences, there is little data available to undertake realistic comparison between regions or from one year to another. A survey was undertaken in the UK to examine the feasibility of developing a replicable survey technique that will enable longitudinal studies and international comparisons. The survey showed that a majority felt traditional procurement methods were inappropriate. However, traditional general contracting is still the most common form of procurement. There was strong agreement that economic muscle compels weaker contracting parties to accept onerous contractual terms. There is no relationship between the size of a project and its procurement method, contrary to popular belief. The findings indicate that wider surveys would generate useful data about attitudes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The costs of procurement are transaction costs which are separate from the direct costs of a project. In this paper discussion is concentrated on costs of tendering. Types of cost, including money costs and opportunity costs, short-term and long-term costs, private and social costs are defined and examined in relation to various types of product and methods of procurement. The costs of the contractor and of the client are considered and tentative conclusions drawn as to who bears these costs in the short-run and in the long run. They may fall on the parties to the process for the particular project, on other contractors and clients or on society as a whole.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Collaborative working methods offer the hope of reduced waste, lower tendering costs and improved outputs. The costs of tendering may be influenced by the introduction of different working methods. Transaction cost economics appears to offer an analytical framework for studying the costs of tendering, but it is more to do with providing explanations at the institutional/industry level, not at the level of individual projects. Surveys and interviews were carried out with small samples in UK. The data show that that while tendering costs are not necessarily higher in collaborative working arrangements, there is no correlation between costs of tendering and the way the work is organized. Practitioners perceive that the benefits of working in collaborative procurement routes far outweigh the costs. Tendering practices can be improved to avoid waste, and the suggested improvements include restricting selective tendering lists to 23 bidders, letting bidders know who they are competing with, reimbursing tendering costs for aborted projects and ensuring that timely and comprehensive information is provided to bidders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new, ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply, chain from clients to consultants, contractors, subcontractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, bused on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with,with tendering are highly variable, 1-15%, depending upon what precisely, is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The ISO has issued a Draft International Standard on construction procurement and the British Standards Institute is drafting a standard based upon this for use in the UK. Three questions arise from these observations. First, what kind of consultation processes would be adequate to ensure that such a standard meets the requirements of an industry as diverse as construction? Second, why would an international standard be inappropriate for use in a country like UK? Third, what sort of issues should such a standard seek to cover? There are strong precedents for process standards, such as quality assurance, design management and workmanship on building sites. So the idea of a standard on procurement is not unusual. Moreover, there are many differences in tendering and procurement practice that are wasteful and even collusive or illegal. These issues are explored with a view to offering insights and suggestions for guidance based on the experiences in UK. The research method is first-hand observation of the drafting committee who are dealing with the British Standard. As an example to test and inform the standardization concept, six different standard guidance documents on tendering procedures are compared. This reveals a significant degree of diversity, and based on this, nine stages for implementing a tendering procedure are derived.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The commercial process in construction projects is an expensive and highly variable overhead. Collaborative working practices carry many benefits, which are widely disseminated, but little information is available about their costs. Transaction Cost Economics is a theoretical framework that seeks explanations for why there are firms and how the boundaries of firms are defined through the “make-or-buy” decision. However, it is not a framework that offers explanations for the relative costs of procuring construction projects in different ways. The idea that different methods of procurement will have characteristically different costs is tested by way of a survey. The relevance of transaction cost economics to the study of commercial costs in procurement is doubtful. The survey shows that collaborative working methods cost neither more nor less than traditional methods. But the benefits of collaboration mean that there is a great deal of enthusiasm for collaboration rather than competition.