4 resultados para urban development,
em Universitat de Girona, Spain
Resumo:
This doctoral thesis offers a quantitative and qualitative analysis of the changes in the urban shape and landscape of the Girona Counties between 1979 and 2006. The theoretical part of the research lies within the framework of the dispersed city phenomenon, and is based on the hypothesis of convergence towards a global urban model. The empirical part demonstrates this proposition with a study of 522 zone development plans in the Girona Counties. The results point to the consolidation of the dispersed city phenomenon, as shown by the sudden increase in built-up space, the spread of urban development throughout the territory, and the emergence of a new, increasingly generic landscape comprising three major morphological types: urban extensions, low density residential estates and industrial zones. This reveals shortcomings of planning for urban growth, weakening of the city as a public project, and a certain degradation of the Mediterranean city model.
Resumo:
El Estado español tiene más de 100.000 construcciones ilegales. En la actualidad, la ejecución de las sentencias en materia urbanística no es eficaz. Existe, por tanto, una situación de inejecución de las sentencias urbanísticas. Un ciudadano puede construir una casa al amparo de una licencia. Sin embargo, a veces, esta licencia es ilegal porque infringe el plan urbanístico aplicable y incluso la propia ley de urbanismo. La consecuencia jurídica de la ilegal es la obligatoriedad del derribo de lo ilegalmente construido. Lo mismo sucede ante la declaración de ilegalidad de un plan urbanístico. En este caso, el juez o tribunal estimará la ilegalidad del plan y el fallo deberá ser ejecutado. La solución no es un fácil porque la demolición o derribo de la construcción ilegal trae consigo el pago de una indemnización a los propietarios que han edificado al amparo de una licencia ilegal.El derecho a la ejecución de sentencias es prescrito por el artículo 24 de la Constitución española. Este artículo 24 garantiza el derecho de todos ciudadanos a una tutela judicial efectiva. El Tribunal Constitucional español en sus sentencias número 67/1984 y 28/1989, reconocieron que el derecho a la ejecución de las resoluciones judiciales deriva del propio derecho a la tutela judicial efectiva. La justicia administrativa está regulada por la Ley 29/1998, del 13 de julio, reguladora de la jurisdicción contencioso-administrativa. En su artículo 103.1 de la Ley 29/1998, establece que los jueces y los tribunales de la jurisdicción administrativa son los competentes para hacer ejecutar las sentencias. Por otro lado, el artículo 117.3 de la Constitución Española otorga la competencia en exclusiva a los jueces y tribunales para hacer ejecutar las sentencias, como manifestación del principio de división de poderes.En último lugar, los valores que la legislación urbanística española incorpora, tales como, el desarrollo sostenible, urbanismo sostenible y la cohesión social, quedan inaplicados si las sentencias urbanísticas no se ejecutan.
Resumo:
The main objective pursued in this thesis targets the development and systematization of a methodology that allows addressing management problems in the dynamic operation of Urban Wastewater Systems. The proposed methodology will suggest operational strategies that can improve the overall performance of the system under certain problematic situations through a model-based approach. The proposed methodology has three main steps: The first step includes the characterization and modeling of the case-study, the definition of scenarios, the evaluation criteria and the operational settings that can be manipulated to improve the system’s performance. In the second step, Monte Carlo simulations are launched to evaluate how the system performs for a wide range of operational settings combinations, and a global sensitivity analysis is conducted to rank the most influential operational settings. Finally, the third step consists on a screening methodology applying a multi-criteria analysis to select the best combinations of operational settings.
Resumo:
This thesis results from the collaborative projects between the LEQUIA-UdG group and Cespa (a company in charge of several landfill sites in Spain). The aim of the work was the development of a suitable alternative treatment for nitrogen removal from mature landfill leachates. The thesis presents the application of the anammox (anaerobic ammonium oxidation process) process to treat ammonium rich leachates as the second step of the PANAMMOX® process. The work deals with preliminary studies about the characteristics of the anammox process in a SBR, with special focus on the response of the biomass to nitrite exposure. The application of the anammox process with leachate was first studied in a lab-scale reactor, to test the effect of the leachate matrix on anammox biomass and its progressive adaptation. Finally, a start-up strategy is developed and applied for the successful start-up of a 400L anammox SBR in less than 6 months.