6 resultados para vehicle scheduling

em Cochin University of Science


Relevância:

60.00% 60.00%

Publicador:

Resumo:

An efficient passenger road transport system is a boon to any city and an inefficient one its bane. Passenger bus transport operation involves various aspects like passenger convenience, profitability of operation and social, technological and environmental factors. The author’s interest in this area was aroused when he conducted a traffic survey of Trivandrum City in 1979. While some studies on the performance of the Kerala State Road Transport Corporation in specific areas like finance, inventory control etc. have already been made, no study has been made from the operational point of view. The study is also the first one of its kind in dealing with the transportation problems for a second order city like Trivandrum. The objective of this research study is to develop a scientific basis for analysing and understanding the various operational aspects of urban bus transport management like assessing travel demand, depot location, fleet allocation, vehicle scheduling, maintenance etc. The operation of public road transportation in Trivandrum City is analysed on the basis of this theoretical background. The studies made have relevance to any medium sized city in India or even abroad. If not properly managed, deterioration of any public utility system is a natural process and it adversely affects the consumers, the economy and the nation. Making any system more efficient requires careful analysis, judicious decision making and proper implementation. It is hoped that this study will throw some light into the various operational aspects of urban passenger road transport management which can be of some help to make it perform more efficiently

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One major component of power system operation is generation scheduling. The objective of the work is to develop efficient control strategies to the power scheduling problems through Reinforcement Learning approaches. The three important active power scheduling problems are Unit Commitment, Economic Dispatch and Automatic Generation Control. Numerical solution methods proposed for solution of power scheduling are insufficient in handling large and complex systems. Soft Computing methods like Simulated Annealing, Evolutionary Programming etc., are efficient in handling complex cost functions, but find limitation in handling stochastic data existing in a practical system. Also the learning steps are to be repeated for each load demand which increases the computation time.Reinforcement Learning (RL) is a method of learning through interactions with environment. The main advantage of this approach is it does not require a precise mathematical formulation. It can learn either by interacting with the environment or interacting with a simulation model. Several optimization and control problems have been solved through Reinforcement Learning approach. The application of Reinforcement Learning in the field of Power system has been a few. The objective is to introduce and extend Reinforcement Learning approaches for the active power scheduling problems in an implementable manner. The main objectives can be enumerated as:(i) Evolve Reinforcement Learning based solutions to the Unit Commitment Problem.(ii) Find suitable solution strategies through Reinforcement Learning approach for Economic Dispatch. (iii) Extend the Reinforcement Learning solution to Automatic Generation Control with a different perspective. (iv) Check the suitability of the scheduling solutions to one of the existing power systems.First part of the thesis is concerned with the Reinforcement Learning approach to Unit Commitment problem. Unit Commitment Problem is formulated as a multi stage decision process. Q learning solution is developed to obtain the optimwn commitment schedule. Method of state aggregation is used to formulate an efficient solution considering the minimwn up time I down time constraints. The performance of the algorithms are evaluated for different systems and compared with other stochastic methods like Genetic Algorithm.Second stage of the work is concerned with solving Economic Dispatch problem. A simple and straight forward decision making strategy is first proposed in the Learning Automata algorithm. Then to solve the scheduling task of systems with large number of generating units, the problem is formulated as a multi stage decision making task. The solution obtained is extended in order to incorporate the transmission losses in the system. To make the Reinforcement Learning solution more efficient and to handle continuous state space, a fimction approximation strategy is proposed. The performance of the developed algorithms are tested for several standard test cases. Proposed method is compared with other recent methods like Partition Approach Algorithm, Simulated Annealing etc.As the final step of implementing the active power control loops in power system, Automatic Generation Control is also taken into consideration.Reinforcement Learning has already been applied to solve Automatic Generation Control loop. The RL solution is extended to take up the approach of common frequency for all the interconnected areas, more similar to practical systems. Performance of the RL controller is also compared with that of the conventional integral controller.In order to prove the suitability of the proposed methods to practical systems, second plant ofNeyveli Thennal Power Station (NTPS IT) is taken for case study. The perfonnance of the Reinforcement Learning solution is found to be better than the other existing methods, which provide the promising step towards RL based control schemes for practical power industry.Reinforcement Learning is applied to solve the scheduling problems in the power industry and found to give satisfactory perfonnance. Proposed solution provides a scope for getting more profit as the economic schedule is obtained instantaneously. Since Reinforcement Learning method can take the stochastic cost data obtained time to time from a plant, it gives an implementable method. As a further step, with suitable methods to interface with on line data, economic scheduling can be achieved instantaneously in a generation control center. Also power scheduling of systems with different sources such as hydro, thermal etc. can be looked into and Reinforcement Learning solutions can be achieved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Traffic Management system (TMS) comprises four major sub systems: The Network Database Management system for information to the passengers, Transit Facility Management System for service, planning, and scheduling vehicle and crews, Congestion Management System for traffic forecasting and planning, Safety Management System concerned with safety aspects of passengers and Environment. This work has opened a rather wide frame work of model structures for application on traffic. The facets of these theories are so wide that it seems impossible to present all necessary models in this work. However it could be deduced from the study that the best Traffic Management System is that whichis realistic in all aspects is easy to understand is easy to apply As it is practically difficult to device an ideal fool—proof model, the attempt here has been to make some progress-in that direction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the absence of entry barrier or regulatory restrictions, Non Banking Financial Companies frantically grew and accessed the public deposit without any regulatory control. The deposit of NBFCs grew from Rs. 41.9 crore in 1971 to 53116.0 crore in 1997. This growth was the result of a combined effect of increase in the number of NBFCs and increase in the amount of deposits. The deposits amazed as above was invested in various assets especially that in motor vehicles by these asset financing NBFCs. Various tactics were adopted by these NBFCs and their agents for recovering the receivable outstanding from such assets. Both central government and RBI were concerned about the protection of depositors‘ interest and various committees were set up to frame a comprehensive regulation for the functioning of these NBFCs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Assembly job shop scheduling problem (AJSP) is one of the most complicated combinatorial optimization problem that involves simultaneously scheduling the processing and assembly operations of complex structured products. The problem becomes even more complicated if a combination of two or more optimization criteria is considered. This thesis addresses an assembly job shop scheduling problem with multiple objectives. The objectives considered are to simultaneously minimizing makespan and total tardiness. In this thesis, two approaches viz., weighted approach and Pareto approach are used for solving the problem. However, it is quite difficult to achieve an optimal solution to this problem with traditional optimization approaches owing to the high computational complexity. Two metaheuristic techniques namely, genetic algorithm and tabu search are investigated in this thesis for solving the multiobjective assembly job shop scheduling problems. Three algorithms based on the two metaheuristic techniques for weighted approach and Pareto approach are proposed for the multi-objective assembly job shop scheduling problem (MOAJSP). A new pairing mechanism is developed for crossover operation in genetic algorithm which leads to improved solutions and faster convergence. The performances of the proposed algorithms are evaluated through a set of test problems and the results are reported. The results reveal that the proposed algorithms based on weighted approach are feasible and effective for solving MOAJSP instances according to the weight assigned to each objective criterion and the proposed algorithms based on Pareto approach are capable of producing a number of good Pareto optimal scheduling plans for MOAJSP instances.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The telemetry data processing operation intended for a given mission are pre-defined by an onboard telemetry configuration, mission trajectory and overall telemetry methodology have stabilized lately for ISRO vehicles. The given problem on telemetry data processing is reduced through hierarchical problem reduction whereby the sequencing of operations evolves as the control task and operations on data as the function task. The function task Input, Output and execution criteria are captured into tables which are examined by the control task and then schedules when the function task when the criteria is being met.