3 resultados para lot sizing and scheduling
em Cochin University of Science
Resumo:
Traffic Management system (TMS) comprises four major sub systems: The Network Database Management system for information to the passengers, Transit Facility Management System for service, planning, and scheduling vehicle and crews, Congestion Management System for traffic forecasting and planning, Safety Management System concerned with safety aspects of passengers and Environment. This work has opened a rather wide frame work of model structures for application on traffic. The facets of these theories are so wide that it seems impossible to present all necessary models in this work. However it could be deduced from the study that the best Traffic Management System is that whichis realistic in all aspects is easy to understand is easy to apply As it is practically difficult to device an ideal fool—proof model, the attempt here has been to make some progress-in that direction.
Resumo:
Kerala was the pioneer in modern seafood processing and exporting. But now the industry is Iacingalot of problems due to low productivity and deterioration in the quality of the products. only about 17% of the installed freezing capacity in sea food processing industry was reported to be utilised during 1979-80. The price of the export commodities its decided by the buyers based on international supply and demand pattern and based on the strength and weakness of dollar/yen. The only way to increase the profitability of the processors is to reduce the cost of production to the possible extent. The individual processors find it difficult to continue in this field due to low productivity and quality problems. The main objectives of the research are to find out how the production is being managed in the seafood processing(freezing) 17industry in Kerala and the reasons for low productivity and poor quality of the products. The study includes a detailed analysis of Location of the factories. Layout Purchase, production and storage patterns. Production planning and scheduling. Work Measurement of the processing of important products. Quality Control and Inspection. Management Information System
Resumo:
Assembly job shop scheduling problem (AJSP) is one of the most complicated combinatorial optimization problem that involves simultaneously scheduling the processing and assembly operations of complex structured products. The problem becomes even more complicated if a combination of two or more optimization criteria is considered. This thesis addresses an assembly job shop scheduling problem with multiple objectives. The objectives considered are to simultaneously minimizing makespan and total tardiness. In this thesis, two approaches viz., weighted approach and Pareto approach are used for solving the problem. However, it is quite difficult to achieve an optimal solution to this problem with traditional optimization approaches owing to the high computational complexity. Two metaheuristic techniques namely, genetic algorithm and tabu search are investigated in this thesis for solving the multiobjective assembly job shop scheduling problems. Three algorithms based on the two metaheuristic techniques for weighted approach and Pareto approach are proposed for the multi-objective assembly job shop scheduling problem (MOAJSP). A new pairing mechanism is developed for crossover operation in genetic algorithm which leads to improved solutions and faster convergence. The performances of the proposed algorithms are evaluated through a set of test problems and the results are reported. The results reveal that the proposed algorithms based on weighted approach are feasible and effective for solving MOAJSP instances according to the weight assigned to each objective criterion and the proposed algorithms based on Pareto approach are capable of producing a number of good Pareto optimal scheduling plans for MOAJSP instances.