4 resultados para cost efficiency

em Cochin University of Science


Relevância:

30.00% 30.00%

Publicador:

Resumo:

A single-feed rectangular-ring microstrip antenna is proposed for indoor communication under the Bluetooth protocol. The dimensions of the antenna together with the location of the feed point are optimized through field simulations in order to cover the Bluetooth bandwidth and to avoid linear polarization. The performance and the efficiency of the antenna are illustrated in a real indoor environment

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the present scenario of energy demand overtaking energy supply top priority is given for energy conservation programs and policies. Most of the process plants are operated on continuous basis and consumes large quantities of energy. Efficient management of process system can lead to energy savings, improved process efficiency, lesser operating and maintenance cost, and greater environmental safety. Reliability and maintainability of the system are usually considered at the design stage and is dependent on the system configuration. However, with the growing need for energy conservation, most of the existing process systems are either modified or are in a state of modification with a view for improving energy efficiency. Often these modifications result in a change in system configuration there by affecting the system reliability. It is important that system modifications for improving energy efficiency should not be at the cost of reliability. Any new proposal for improving the energy efficiency of the process or equipments should prove itself to be economically feasible for gaining acceptance for implementation. In order to arrive at the economic feasibility of the new proposal, the general trend is to compare the benefits that can be derived over the lifetime as well as the operating and maintenance costs with the investment to be made. Quite often it happens that the reliability aspects (or loss due to unavailability) are not taken into consideration. Plant availability is a critical factor for the economic performance evaluation of any process plant.The focus of the present work is to study the effect of system modification for improving energy efficiency on system reliability. A generalized model for the valuation of process system incorporating reliability is developed, which is used as a tool for the analysis. It can provide an awareness of the potential performance improvements of the process system and can be used to arrive at the change in process system value resulting from system modification. The model also arrives at the pay back of the modified system by taking reliability aspects also into consideration. It is also used to study the effect of various operating parameters on system value. The concept of breakeven availability is introduced and an algorithm for allocation of component reliabilities of the modified process system based on the breakeven system availability is also developed. The model was applied to various industrial situations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It is a fact that there now exists a sound framework of accounting theory to ascertain the working results and the investment status of hospitals. Yet, there is no system of accounting in practice to conduct its activities with utmost efficiency. No attempts have hitherto been made for the continuous improvement in the servics rendered by hospitals. Personal investments in hospitals have made the interaction of business to some extent.Planning, decision making and control assume increasing importance as hospitals grow in size and complexity. Moreover, wise and effective utilisation of resources should be ensured. The importance of cost cannot be overlooked in this context. Cost is the most effective factor in the determination of the prices of hospital services rendered. The important managerial functions have to rely heavily on accurate and timely cost information. More people can be provided with services if no services cost more than what is a must to provide the necessary level of care. The price paid for high cost technology for a few is no technology at all for the many. Hence no pains must be spared in ascertaining, presenting, controlling and reducing costs. An effective system of Cost Accountancy and Cost Control is imperative for the survival of hospitals in the intensely competitive conditions of today. The valuable objective of "better patient care" can be attained only if the management can make use of the various tools and techniques to ascertain, control and reduce each item of cost in hospitals. Constant efforts must be made by the management to continuously improve their services and bring down costs and prices of all hospital services. Cost Accountancy has made its impresssive impact on almost all the spheres of human activities. It is high time a comprehensive Cost Accountancy and Cost Control system be implemented in hospitals. The problem under study thus is the designing of a sound and full-fledged Cost Accountancy and Cost Control system that suits the requirements of hospitals. It is for the first time in India during the evolution of Cost Accountancy that a comprehensive cost system is tried in hospitals.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Thin film solar cells having structure CuInS2/In2S3 were fabricated using chemical spray pyrolysis (CSP) technique over ITO coated glass. Top electrode was silver film (area 0.05 cm2). Cu/In ratio and S/Cu in the precursor solution for CuInS2 were fixed as 1.2 and 5 respectively. In/S ratio in the precursor solution for In2S3 was fixed as 1.2/8. An efficiency of 0.6% (fill factor -37.6%) was obtained. Cu diffusion to the In2S3 layer, which deteriorates junction properties, is inevitable in CuInS2/In2S3 cell. So to decrease this effect and to ensure a Cu-free In2S3 layer at the top of the cell, Cu/In ratio was reduced to 1. Then a remarkable increase in short circuit current density was occurred from 3 mA/cm2 to 14.8 mA/cm2 and an efficiency of 2.13% was achieved. Also when In/S ratio was altered to 1.2/12, the short circuit current density increased to 17.8 mA/cm2 with an improved fill factor of 32% and efficiency remaining as 2%. Thus Cu/In and In/S ratios in the precursor solutions play a crucial role in determining the cell parameters