5 resultados para Teaching with Projects

em Cochin University of Science


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study aimed to study the evolution and substance of microfinance as a major tool for combating poverty at the global and national level. The development of micro finance in Kerala is briefly discussed. It also indicates the importance and role of microcredit in bringing the poor up in the society through entrepreneurial initiatives. The current trends in the field are also discussed, leading to the need of the present research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis entitled “Development planning at the state level in india a case study with reference to kerala1957-84.Planning in India is a concurrent subject with the Centre and the States having well-defined domains of jurisdiction with regard to planning functions and sources of resource mobilisation.The genesis of the lack of academic interest in state level planning is in the widely held belief that in the extent scheme of Centre-State economic relations, the states have little scope for initiative in planning.Both at the theoretical and empirical levels, Kerala has attached very great importance to planning.It has been the localeof wide and deep discussions on the various dimensions of planning.In Kerala's development process, the leading sector consists of social services such as education and public healthOne point that needs special emphasis in this regard is that the high demand for education in Kerala cannot be attributed to the Keralites' ‘unique urge‘ for education. Rather, it is related to the very high level of unemployment in the state (Kerala has the highest level of unemployment in the country.In resource allocation under the Five Year Plans, Kerala attached the highest weightage to power generation, hydro-electric projects being the major source of power in the state. Nearly one-fourth of the plan resources has been claimed by hydro-electric projects.In the agricultural sector, Kera1a's level of productive use of electric power is one of the lowest.As is evident.from above, planning in Kerala has not enabled us to solve the basic problems of the state. More 'scientific' planning in the sense of applying mre sophisticated planning techniques is obviously not the answer. It, on the contrary, consists of more fundamental changes some of which can be brought about through an effective use of measures well within the power of the State Government.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Man's concern with environmental deterioration is one of the major reasons for the increased interest in marine and estuarine microbes. Microbes form an important link in the biogeochemical cycling and their cyclinq activites often determine to a large measure the potential productivity of an ecosystem In the recycling of the nutrients in the estuary, bacteria and fungi therefore play a particularly significant role.The allochthonous plant materials contain biopolymers such as cellulose, lignin, humus etc., that are difficult to degrade into simpler substances. The fungi have the ability to degrade _substances, thereby making them available for cycling within the system. The present study is devoted to find the composition and the activity of myco populations of Cochin backwater. For convenience the thesis is divided into eight chapters. The opening chapter briefly reviews the literature and projects the importance of work and the main objectives. Second chapter discusses the materials and methods. In the third chapter the systematic and taxonomy of estuarine yeasts are examined in detail since this information is scarcely available for our waters. The general ecological aspects of the yeasts and filamentous fungi in the area of study are examined in the fourth chapter using appropriate statistical techniques. A special reference to the fungi in a small mangrove ecosystem is attempted in the fifth chapter. The biochemical studies are discussed in the sixth chapter and the penultimate chapter provides an overall discussion. In the last chapter the summary of the work is presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.