40 resultados para SCHEDULING PROBLEMS

em Cochin University of Science


Relevância:

70.00% 70.00%

Publicador:

Resumo:

One major component of power system operation is generation scheduling. The objective of the work is to develop efficient control strategies to the power scheduling problems through Reinforcement Learning approaches. The three important active power scheduling problems are Unit Commitment, Economic Dispatch and Automatic Generation Control. Numerical solution methods proposed for solution of power scheduling are insufficient in handling large and complex systems. Soft Computing methods like Simulated Annealing, Evolutionary Programming etc., are efficient in handling complex cost functions, but find limitation in handling stochastic data existing in a practical system. Also the learning steps are to be repeated for each load demand which increases the computation time.Reinforcement Learning (RL) is a method of learning through interactions with environment. The main advantage of this approach is it does not require a precise mathematical formulation. It can learn either by interacting with the environment or interacting with a simulation model. Several optimization and control problems have been solved through Reinforcement Learning approach. The application of Reinforcement Learning in the field of Power system has been a few. The objective is to introduce and extend Reinforcement Learning approaches for the active power scheduling problems in an implementable manner. The main objectives can be enumerated as:(i) Evolve Reinforcement Learning based solutions to the Unit Commitment Problem.(ii) Find suitable solution strategies through Reinforcement Learning approach for Economic Dispatch. (iii) Extend the Reinforcement Learning solution to Automatic Generation Control with a different perspective. (iv) Check the suitability of the scheduling solutions to one of the existing power systems.First part of the thesis is concerned with the Reinforcement Learning approach to Unit Commitment problem. Unit Commitment Problem is formulated as a multi stage decision process. Q learning solution is developed to obtain the optimwn commitment schedule. Method of state aggregation is used to formulate an efficient solution considering the minimwn up time I down time constraints. The performance of the algorithms are evaluated for different systems and compared with other stochastic methods like Genetic Algorithm.Second stage of the work is concerned with solving Economic Dispatch problem. A simple and straight forward decision making strategy is first proposed in the Learning Automata algorithm. Then to solve the scheduling task of systems with large number of generating units, the problem is formulated as a multi stage decision making task. The solution obtained is extended in order to incorporate the transmission losses in the system. To make the Reinforcement Learning solution more efficient and to handle continuous state space, a fimction approximation strategy is proposed. The performance of the developed algorithms are tested for several standard test cases. Proposed method is compared with other recent methods like Partition Approach Algorithm, Simulated Annealing etc.As the final step of implementing the active power control loops in power system, Automatic Generation Control is also taken into consideration.Reinforcement Learning has already been applied to solve Automatic Generation Control loop. The RL solution is extended to take up the approach of common frequency for all the interconnected areas, more similar to practical systems. Performance of the RL controller is also compared with that of the conventional integral controller.In order to prove the suitability of the proposed methods to practical systems, second plant ofNeyveli Thennal Power Station (NTPS IT) is taken for case study. The perfonnance of the Reinforcement Learning solution is found to be better than the other existing methods, which provide the promising step towards RL based control schemes for practical power industry.Reinforcement Learning is applied to solve the scheduling problems in the power industry and found to give satisfactory perfonnance. Proposed solution provides a scope for getting more profit as the economic schedule is obtained instantaneously. Since Reinforcement Learning method can take the stochastic cost data obtained time to time from a plant, it gives an implementable method. As a further step, with suitable methods to interface with on line data, economic scheduling can be achieved instantaneously in a generation control center. Also power scheduling of systems with different sources such as hydro, thermal etc. can be looked into and Reinforcement Learning solutions can be achieved.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Assembly job shop scheduling problem (AJSP) is one of the most complicated combinatorial optimization problem that involves simultaneously scheduling the processing and assembly operations of complex structured products. The problem becomes even more complicated if a combination of two or more optimization criteria is considered. This thesis addresses an assembly job shop scheduling problem with multiple objectives. The objectives considered are to simultaneously minimizing makespan and total tardiness. In this thesis, two approaches viz., weighted approach and Pareto approach are used for solving the problem. However, it is quite difficult to achieve an optimal solution to this problem with traditional optimization approaches owing to the high computational complexity. Two metaheuristic techniques namely, genetic algorithm and tabu search are investigated in this thesis for solving the multiobjective assembly job shop scheduling problems. Three algorithms based on the two metaheuristic techniques for weighted approach and Pareto approach are proposed for the multi-objective assembly job shop scheduling problem (MOAJSP). A new pairing mechanism is developed for crossover operation in genetic algorithm which leads to improved solutions and faster convergence. The performances of the proposed algorithms are evaluated through a set of test problems and the results are reported. The results reveal that the proposed algorithms based on weighted approach are feasible and effective for solving MOAJSP instances according to the weight assigned to each objective criterion and the proposed algorithms based on Pareto approach are capable of producing a number of good Pareto optimal scheduling plans for MOAJSP instances.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis is devoted to the study of some stochastic models in inventories. An inventory system is a facility at which items of materials are stocked. In order to promote smooth and efficient running of business, and to provide adequate service to the customers, an inventory materials is essential for any enterprise. When uncertainty is present, inventories are used as a protection against risk of stock out. It is advantageous to procure the item before it is needed at a lower marginal cost. Again, by bulk purchasing, the advantage of price discounts can be availed. All these contribute to the formation of inventory. Maintaining inventories is a major expenditure for any organization. For each inventory, the fundamental question is how much new stock should be ordered and when should the orders are replaced. In the present study, considered several models for single and two commodity stochastic inventory problems. The thesis discusses two models. In the first model, examined the case in which the time elapsed between two consecutive demand points are independent and identically distributed with common distribution function F(.) with mean  (assumed finite) and in which demand magnitude depends only on the time elapsed since the previous demand epoch. The time between disasters has an exponential distribution with parameter . In Model II, the inter arrival time of disasters have general distribution (F.) with mean  ( ) and the quantity destructed depends on the time elapsed between disasters. Demands form compound poison processes with inter arrival times of demands having mean 1/. It deals with linearly correlated bulk demand two Commodity inventory problem, where each arrival demands a random number of items of each commodity C1 and C2, the maximum quantity demanded being a (< S1) and b(

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The overall objective of the study is to examine the problems and prospects of the tea on industry in Kerala. The specific objectives are to trace the historical evolution of the tea plantation industry in India with special reference to Kerala and to study the performance of tea plantation industry in Kerala. In order to analyse the growth performance of tea plantation industry in Kerala in a comparative perspective, growth rates for the neighbouring states of Karnataka and Tamilnadu are estimated along with the National, South Indian and North Indian estimates. Tea plantation industry is a labour intensive activity. Productivity has been low primarily because of the over aging. In all the factories visited only Black tea is produced. In factories outmoded machines which installed years ago is still used which will increase the cost of production. The major problem is high cost of production and low price realization. The workers are found to be not satisfied with their working conditions- long journey to work place, absence of resting places, latrine facilities etc. and also the problems arising from dust in the factory. At a macro level the tea plantation industry has been facing the adverse impacts of globalisation and trade liberalization. There is only one solution to this problem that is to improve the competitiveness in production of raw leaf and manufacturing of tea. Government has a very important role with specification of strict quality control

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present study was undertaken to evaluate the performance of Coir Vyavasaya Co-operative societies (CVCs) in Kerala. It was also intended to examine the extent of fulfillment of the objectives of Co-operativisation Scheme and the socio-economic betterment of worker members, Further the study was directed to find out the level of participation of members in the affairs of CVCs and to identify the major problems confronting the CVCs and the future prospects of the industry. The objectives of this study are to evaluate the performance of CVCs in Kerala with reference to the objectives of co-operativisation, socio-economic background of the worker members of the CVCs in the state, extent of members participation, major problems etc. Major findings of the study shows that 84% of CVCs surveyed were incurring losses, the long-term solvency position of the CVCS shows very pathetic situation, ration analysis shows and unhealthy state of affaires with respect to short-term solvency position and operating efficiency of all categories of CVS were found to be extremely poor. If CVCs are enabled to increase their quantity of production and there by the volume of business, their amount of loss can be reduced. If this is so, the societies can provide more days of employment to their work members, which will help them to earn more wages and thereby improve their economic and social conditions

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Application of Queueing theory in areas like Computer networking, ATM facilities, Telecommunications and to many other numerous situation made people study Queueing models extensively and it has become an ever expanding branch of applied probability. The thesis discusses Reliability of a ‘k-out-of-n system’ where the server also attends external customers when there are no failed components (main customers), under a retrial policy, which can be explained in detail. It explains the reliability of a ‘K-out-of-n-system’ where the server also attends external customers and studies a multi-server infinite capacity Queueing system where each customer arrives as ordinary but can generate into priority customer which waiting in the queue. The study gives details on a finite capacity multi-server queueing system with self-generation of priority customers and also on a single server infinite capacity retrial Queue where the customer in the orbit can generate into a priority customer and leaves the system if the server is already busy with a priority generated customer; else he is taken for service immediately. Arrival process is according to a MAP and service times follow MSP.

Relevância:

20.00% 20.00%

Publicador: