3 resultados para Risk-informed Disaster Management:

em Cochin University of Science


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The goal of this work was developing a query processing system using software agents. Open Agent Architecture framework is used for system development. The system supports queries in both Hindi and Malayalam; two prominent regional languages of India. Natural language processing techniques are used for meaning extraction from the plain query and information from database is given back to the user in his native language. The system architecture is designed in a structured way that it can be adapted to other regional languages of India. . This system can be effectively used in application areas like e-governance, agriculture, rural health, education, national resource planning, disaster management, information kiosks etc where people from all walks of life are involved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agent based simulation is a widely developing area in artificial intelligence.The simulation studies are extensively used in different areas of disaster management. This work deals with the study of an agent based evacuation simulation which is being done to handle the various evacuation behaviors.Various emergent behaviors of agents are addressed here. Dynamic grouping behaviors of agents are studied. Collision detection and obstacle avoidances are also incorporated in this approach.Evacuation is studied with single exits and multiple exits and efficiency is measured in terms of evacuation rate, collision rate etc.Net logo is the tool used which helps in the efficient modeling of scenarios in evacuation

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.