3 resultados para Project 2003-028-B : Regenerating Construction to Enhance Sustainability

em Cochin University of Science


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In symmetric block ciphers, substitution and diffusion operations are performed in multiple rounds using sub-keys generated from a key generation procedure called key schedule. The key schedule plays a very important role in deciding the security of block ciphers. In this paper we propose a complex key generation procedure, based on matrix manipulations, which could be introduced in symmetric ciphers. The proposed key generation procedure offers two advantages. First, the procedure is simple to implement and has complexity in determining the sub-keys through crypt analysis. Secondly, the procedure produces a strong avalanche effect making many bits in the output block of a cipher to undergo changes with one bit change in the secret key. As a case study, matrix based key generation procedure has been introduced in Advanced Encryption Standard (AES) by replacing the existing key schedule of AES. The key avalanche and differential key propagation produced in AES have been observed. The paper describes the matrix based key generation procedure and the enhanced key avalanche and differential key propagation produced in AES. It has been shown that, the key avalanche effect and differential key propagation characteristics of AES have improved by replacing the AES key schedule with the Matrix based key generation procedure

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An electromagnetically coupled T-shaped microstrip feed used to enhance the impedance bandwidth of a rectangular microstrip antenna is reported. The proposed antenna offers a 2:1 VSWR bandwidth of -36% with an increase in gain of 0.8 dB