5 resultados para Pedagogy of architectural project
em Cochin University of Science
Resumo:
Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.
Resumo:
The study has wider policy implications as it identifies the possible variables which influence the sustainability of participatory productive sector projects. The method which is developed to study the sustainability of projects under People’s Planning in Chempu Panchayat could be used for studying the same in other panchayats also. Unlike the case of the standard features of sustainability identified, the independent variables vary according to the nature of the project. Hence, this needs to be modified accordingly while applying the method in a dissimilar domain. Selection of a single panchayat for the present study is relevant on the basis of a common package of inputs for decentralised planning which is forwarded by the State Planning Board respectively for the three-tier panchayat system in Kerala. The dynamic filed realities could be brought out in view of a comprehensive planning approach through an in depth study of specific cases.The assessment of the nature and pattern of productive sector projects in the selected Village Panchayat puts the projects under close scrutiny. The analysis has depended largely on secondary sources of information, especially from panchayat level plan documents, and also on the primary information obtained using direct observation and on-site inspection of project sites. An analysis of the nature and pattem of productive sector projects is important as it gives all necessary information regarding follow-up, monitoring/evaluation and even termination of a particular project. It has also revealed the tendencies of including infrastructure and service sector projects under ‘productive’ category, especially for maintaining the stipulated ratio (40:30:30) of grant-in-aid distribution. The study regarding the allocation and expenditure pattern of plan funds is vital in policy level as it reveals the under-noticed allocation and expenditure pattern of plan funds other than grant-in-aid. One major limitation of the study has been the limited availability of secondary data, especially regarding project-wise expenditure and monitoring/evaluation reports of various project committees.
Resumo:
This thesis Entitled Post-Environmental Evaluation of The Rajjaprabha Dam In Thailand. This post evaluation of environmental consequences of Rajjaprabha dam IS conducted ten years after its commencement. The Rajjaprabha dam project was planned and implemented as a multipurpose project, mainly for hydropower production, flood protection, fisheries, recreation and irrigation. The project includes the dam and reservoir with a 240 MW hydropower plant located about 90 km upstream from Surat Thani province, and irrigation systems covering the coastal plain in Surat Thani. The upstream storage reservoir (with about 5,639 mcm storage) and the hydropower plant had already been implemented. The first phase of irrigation system covers an area of 23,100 hectares. The second phase is envisaged to cover about 50,000 hectares. This study was conducted with the following objectives: (I) to assess all existing environmental resources and their values with the help of input-output analysis (2) to findout the beneficial impacts of the project (3) to evaluate the actual positive effects vis-a-vis the estimated effects before the project was implemented and (4) to identify all significant changes in relatives to the impacts previously assessed. The study area includes the Phum Duang river basin of about 4,668 km2 (placed on the areas that are upstream and downstream to the damsite), The duration of study is limited to 10 years after the dam has become operational i.e. from 1987-1997. The results of the study reveal that there is no significant changes in climatic and ground water resources, with respect to the study area inspte of the fact that the physical and chemical properties of the soil have slightly changed. Sedimentation in the reservoir does not have much effect on the function of the dam.
Resumo:
The present study consists of nine chapters including the introductory chapter. Chapter II makes a brief review of environmental literature and examines various measures adopted at the global level to protect the environment. The environmental problems often transgress national sovereignity and geographical boundaries. Therefore, attempts must be made at the national and international levels to protect the environment, the resources of which are the common property of mankind. The protection of the national environment from the ancient till the present forms the content of Chapter III. These chapters together provide a background to understand the issues analysed in the subsequent chapters. Carefully worked out theoretical framework is a pre-requisite for the successful study of a complex subject. Some of the theoretical issues of ‘environomics’ are examined in Chapter IV. The theoretical issues involved in estimating the costs and benefits of environmental protection constitute the theme of Chapter V. The state of environment in Eloor-Edayar Industrial belt andthe impact analysis of pollution of the area are discussed in Chapter VI and VII respectively. Chapter VIII makes the financial estimate of environmental protection of the project And finally, Chapter IX presents the findings of the study
Resumo:
Reducing fishing pressure in coastal waters is the need of the day in the Indian marine fisheries sector of the country which is fast changing from a mere vocational activity to a capital intensive industry. It requires continuous monitoring of the resource exploitation through a scientifically acceptable methodology, data on production of each species stock, the number and characteristics of the fishing gears of the fleet, various biological characteristics of each stock, the impact of fishing on the environment and the role of fishery—independent on availability and abundance. Besides this, there are issues relating to capabilities in stock assessment, taxonomy research, biodiversity, conservation and fisheries management. Generation of reliable data base over a fixed time frame, their analysis and interpretation are necessary before drawing conclusions on the stock size, maximum sustainable yield, maximum economic yield and to further implement various fishing regulatory measures. India being a signatory to several treaties and conventions, is obliged to carry out assessments of the exploited stocks and manage them at sustainable levels. Besides, the nation is bound by its obligation of protein food security to people and livelihood security to those engaged in marine fishing related activities. Also, there are regional variabilities in fishing technology and fishery resources. All these make it mandatory for India to continue and strengthen its marine capture fisheries research in general and deep sea fisheries in particular. Against this background, an attempt is made to strengthen the deep sea fish biodiversity and also to generate data on the distribution, abundance, catch per unit effort of fishery resources available beyond 200 m in the EEZ of southwest coast ofIndia and also unravel some of the aspects of life history traits of potentially important non conventional fish species inhabiting in the depth beyond 200 m. This study was carried out as part of the Project on Stock Assessment and Biology of Deep Sea Fishes of Indian EEZ (MoES, Govt. of India).