6 resultados para Pedagogic project
em Cochin University of Science
Resumo:
This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.
Resumo:
Indian marine engineers are renowned for employment globally due to their knowledge, skill and reliability. This praiseworthy status has been achieved mainly due to the systematic training imparted to marine engineering cadets. However, in an era of advancing technology, marine engineering training has to remain dynamic to imbibe latest technology as well as to meet the demands of the shipping industry. New subjects of studies have to be included in the curriculum in a timely manner taking into consideration the industry requirements and best practices in shipping. Technical competence of marine engineers also has to be subjected to changes depending upon the needs of the ever growing and over regulated shipping industry. Besides. certain soft skills are to be developed and improved amongst the marine engineers in order to alter or amend the personality traits leading to their career success.If timely corrective action is taken. Indian marine engineers can be in still greater demand for employment in global maritime field. In order to enhance the employability of our mmine engineers by improving their quality, a study of marine engineers in general and class IV marine engineers in particular was conducted based on three distinct surveys, viz., survey among senior marine engineers, survey among employers of marine engineers and survey of class IV marine engineers themselves.The surveys have been planned and questionnaires have been designed to focus the study of marine engineer officer class IV from the point of view of the three distinct groups of maritime personnels. As a result of this, the strength and weakness of class IV marine engineers are identified with regard to their performance on board ships, acquisition of necessary technical skills. employability and career success. The criteria of essential qualities of a marine engineer are classified as academic, technical, social, psychological. physical, mental, emergency responsive, communicative and leadership, and have been assessed for a practicing marine engineer by statistical analysis of data collected from surveys. These are assessed for class IV marine engineers from the point of view of senior marine engineers and employers separately. The Endings are delineated and graphically depicted in this thesis.Besides. six pertinent personality traits of a marine engineer viz. self esteem. learning style. decision making. motivation. team work and listening self inventory have been subjected to study and their correlation with career success have been established wherever possible. This is carried out to develop a theoretical framework to understand what leads a marine engineer to his career attainment. This enables the author to estimate the personality strengths and weaknesses of a serving marine engineer and eventually to deduce possible corrective measures or modifications in marine engineering training in India.Maritime training is largely based on International Conventions on Standard of Training. Certification and Watch keeping for Seafarers 1995. its associated Code and Merchant Shipping (STCW for Seafarers) Rules 1998. Further, Maritime Education, Training and Assessment (META) Manual was subjected to a critical scrutiny and relevant Endings of thc surveys arc superimposed on the existing rule requirement and curriculum. Views of senior marine engineers and executives of various shipping companies are taken into account before arriving at the revision of syllabus of marine engineering courses. Modifications in the pattern of workshop and sea service for graduate mechanical engineering trainees are recommended. Desirable age brackets of junior engineers and chief engineers. use of Training and Assessment Record book (TAR Book) during training etc. have also been evaluated.As a result of the pedagogic introspection of the existing system of marine engineering training in India. in this thesis, a revised pattern of workshop training of six months duration for graduate mechanical engineers. revised pattern of sea service training of one year duration and modified now diagram incorporating the above have been arrived at. Effects of various personality traits on career success have been established along with certain findings for improvement of desirable personality traits of marine engineers.
Resumo:
Despite various intervensions, artisanal fishermen remain one of the weaker sections in Kerala's society. Host of the welfare and developmental programmes introduced for them had produced very little impact on their living conditions. Further, they are unable to compete with mechanised sector for fishing. Host of the technological development which had taken place after Indo-Norvegean Project favoured the growth of mechanised sector. As a consequence of this, fishing become unviable for artisanal fishermen who propagate the idea of ” sustainable development” in the fishing industry. It is commonly believed that an integrated approach may help them to improve their living conditions substantially. In the light of the above background the scholar has made an attempt to study the impact of Integrated Marine Fisheries Development Project among artisanal fishermen in Kerala It is realised from the findings of the study that the most important needs of artisanal fishermen arecredit facilities and marketing support. Without marketing linkages effective credit management is not possible. Marketing activities and credit management are interdependent
Resumo:
Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.
Resumo:
The effective organization and utilisation of resources produced by the students, faculty and research scholars in university departments assume greater significance. Institutional repositories are developed by many institutions to provide resources and materials that support students in their studies. The present study recognizes the value of such a repository in the Engineering and Technology discipline in Cochin University of Science and Technology. The paper explains the need for a digital repository ofproject reports. The authors present a modelfor digital repository, and the organization.and administration of such a repository. The study also analyses the various other factors associated with the proposed depository.
Resumo:
The aim of this study is to investigate the role of operational flexibility for effective project management in the construction industry. The specific objectives are to: a) Identify the determinants of operational flexibility potential in construction project management b) Investigate the contribution of each of the determinants to operational flexibility potential in the construction industry c) Investigate on the moderating factors of operational flexibility potential in a construction project environment d) Investigate whether moderated operational flexibility potential mediates the path between predictors and effective construction project management e) Develop and test a conceptual model of achieving operational flexibility for effective project management The purpose of this study is to findout ways to utilize flexibility inorder to manage uncertain project environment and ultimately achieve effective project management. In what configuration these operational flexibility determinants are demanded by construction project environment in order to achieve project success. This research was conducted in three phases, namely: (i) exploratory phase (ii) questionnaire development phase; and (iii) data collection and analysis phase. The study needs firm level analysis and therefore real estate developers who are members of CREDAI, Kerala Chapter were considered. This study provides a framework on the functioning of operational flexibility, offering guidance to researchers and practitioners for discovering means to gain operational flexibility in construction firms. The findings provide an empirical understanding on kinds of resources and capabilities a construction firm must accumulate to respond flexibly to the changing project environment offering practitioners insights into practices that build firms operational flexibility potential. Firms are dealing with complex, continuous changing and uncertain environments due trends of globalization, technical changes and innovations and changes in the customers’ needs and expectations. To cope with the increasingly uncertain and quickly changing environment firms strive for flexibility. To achieve the level of flexibility that adds value to the customers, firms should look to flexibility from a day to day operational perspective. Each dimension of operational flexibility is derived from competences and capabilities. In this thesis only the influence on customer satisfaction and learning exploitation of flexibility dimensions which directly add value in the customers eyes are studied to answer the followingresearch questions: “What is the impact of operational flexibility on customer satisfaction?.” What are the predictors of operational flexibility in construction industry? .These questions can only be answered after answering the questions like “Why do firms need operational flexibility?” and “how can firms achieve operational flexibility?” in the context of the construction industry. The need for construction firms to be flexible, via the effective utilization of organizational resources and capabilities for improved responsiveness, is important because of the increasing rate of changes in the business environment within which they operate. Achieving operational flexibility is also important because it has a significant correlation with a project effectiveness and hence a firm’s turnover. It is essential for academics and practitioners to recognize that the attainment of operational flexibility involves different types namely: (i) Modification (ii) new product development and (iii) demand management requires different configurations of predictors (i.e., resources, capabilities and strategies). Construction firms should consider these relationships and implement appropriate management practices for developing and configuring the right kind of resources, capabilities and strategies towards achieving different operational flexibility types.