7 resultados para Malcev completion

em Cochin University of Science


Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this thesis T-policy is implemented to the inventory system with random lead time and also repair in the reliability of k-out-of-n system. Inventory system may be considered as the system of keeping records of the amounts of commodities in stock. Reliability is defined as the ability of an entity to perform a required function under given conditions for a given time interval. It is measured by the probability that an entity E can perform a required function under given conditions for the time interval. In this thesis considered k-out-of-n system with repair and two modes of service under T-policy. In this case first server is available always and second server is activated on elapse of T time units. The lead time is exponentially distributed with parameter  and T is exponentially distributed with parameter  from the epoch at which it was inactivated after completion of repair of all failed units in the previous cycle, or the moment n-k failed units accumulate. The repaired units are assumed to be as good as new. In this study , three different situations, ie; cold system, warm system and hot system. A k-out-of-n system is called cold, warm or hot according as the functional units do not fail, fail at a lower rate or fail at the same rate when system is shown as that when it is up.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Highly crystalline, ultra fine TiO (anatase) having high surface area has been prepared by thermal hydrolysis of titanyl sulphate 2 solution and characterized using B.E.T surface area measurements, XRD and chemical analysis. The dependence of surface area on concentration of staffing solution, temperature of hydrolysis, duration of boiling and calcination temperature were also studied. As the boiling temperature, duration of boiling and calcination temperature increased, the surface area of TiO formed decreased significantly. 2 On increasing calcination temperature, the crystallite size of TiO also increased and gradually the phase transformation to rutile took 2 place. The onset and completion temperatures of rutilation were 700 and 10008C, respectively

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The shift from print to digital information has a high impact on all components of the academic library system in India especially the users, services and the staff. Though information is considered as an important resource, the use of ICT tools to collect and disseminate information has been in a slow pace in majority of the University libraries This may be due to various factors like insufficient funds, inadequate staff trained in handling computers and software packages, administrative concerns etc. In Kerala, automation has been initiated in almost all University libraries using library automation software and is under different stages of completion. There are not much studies conducted about the effects of information communication technologies on the professional activities of library professionals in the universities in Kerala. It is important to evaluate whether progress in ICT has had any impact on the library profession in these highest educational institutions. The aim of the study is to assess whether the developments in information communication technologies have any influence on the library professionals’ professional development, and the need for further education and training in the profession and evaluate their skills in handling developments in ICT. The total population of the study is 252 including the permanently employed professional library staff in central libraries and departmental libraries in the main campuses of the universities under study. This is almost a census study of the defined population of users. The questionnaire method was adopted for collection of data for this study, supplemented by interviews of Librarians to gather additional information. Library Professionals have a positive approach towards ICT applications and services in Libraries, but majority do not have the opportunities to develop their skills and competencies in their work environment. To develop competitive personnel in a technologically advanced world, high priority must be given to develop competence in ICT applications, library management and soft skills in library professionals, by the University administrators and Library associations. Library science schools and teaching departments across the country have to take significant steps to revise library science curriculum, and incorporate significant changes to achieve the demands and challenges of library science profession.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This thesis entitled' On Queues with Interruptions and Repeat or Resumption of Service' introduces several new concepts into queues with service interruption. It is divided into Seven chapters including an introductory chapter. The following are keywords that we use in this thesis: Phase type (PH) distribution, Markovian Arrival Process (MAP), Geometric Distribution, Service Interruption, First in First out (FIFO), threshold random variable and Super threshold random variable. In the second chapter we introduce a new concept called the 'threshold random variable' which competes with interruption time to decide whether to repeat or resume the interrupted service after removal of interruptions. This notion generalizes the work reported so far in queues with service interruptions. In chapter 3 we introduce the concept of what is called 'Super threshold clock' (a random variable) which keeps track of the total interruption time of a customer during his service except when it is realized before completion of interruption in some cases to be discussed in this thesis and in other cases it exactly measures the duration of all interruptions put together. The Super threshold clock is OIl whenever the service is interrupted and is deactivated when service is rendered. Throughout this thesis the first in first out service discipline is followed except for priority queues.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this thesis we have introduced and studied the notion of self interruption of service by customers. Service interruption in queueing systems have been extensively discussed in literature (see, Krishnamoorthy, Pramod and Chakravarthy [38]) for the most recent survey. So far all work reported deal with cases in which service interruptions are generated by sources other than customers. However, there are situations where interruptions are due to the customers rather than the system. Such situations are especially arise at doctors clinic, banks, reservation counter etc. Our attempt is to quantify a few of such problems. Systematically we have proceed from single server queue (in Chapter 2) to multi-server queues (Chapter 3). In Chapte 4, we have studied a very general multiserver queueing model with service interruption and protection of service phases. We also introduced customer interruption in a retrial setup (in Chapter 5). All models (from Chapter 2 to Chapter 4) that were analyzed involve 'non-preemptive priority' for interrupted customers where as in the model discussed in Chapter 5 interruption of service by customers is not encouraged. So the interrupted customers cannot access the server as long as there are primary customers in the system. In Chapter 5 we have obtained an explicit expression for the stability condition of the system. In all models analyzed in this thesis, we have assumed that no more than one interruption is allowed for a customer while in service. Since the models are not analytically tractable, a large number of numerical illustrations were given in each chapter it illustrate the working of the systems. We can extend the models discussed in this thesis to several directions. For example some of the models can be analyzed with both server induced and customer induced interruptions the results for which are not available till date. Another possible extension of work is to the case where there is no bound on the number of interruptions a customer is permitted to have before service completion. More complex is the case where a customer is permitted to have a nite number (K ≥ 2) of We can extend the models discussed in this thesis to several directions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mathematical models are often used to describe physical realities. However, the physical realities are imprecise while the mathematical concepts are required to be precise and perfect. The 1st chapter give a brief summary of the arithmetic of fuzzy real numbers and the fuzzy normed algebra M(I). Also we explain a few preliminary definitions and results required in the later chapters. Fuzzy real numbers are introduced by Hutton,B [HU] and Rodabaugh, S.E[ROD]. Our definition slightly differs from this with an additional minor restriction. The definition of Clementina Felbin [CL1] is entirely different. The notations of [HU]and [M;Y] are retained inspite of the slight difference in the concept.the 3rd chapter In this chapter using the completion M'(I) of M(I) we give a fuzzy extension of real Hahn-Banch theorem. Some consequences of this extension are obtained. The idea of real fuzzy linear functional on fuzzy normed linear space is introduced. Some of its properties are studied. In the complex case we get only a slightly weaker analogue for the Hahn-Banch theorem, than the one [B;N] in the crisp case