5 resultados para Assurance de dommages
em Cochin University of Science
Resumo:
Shrimp Aquaculture has provided tremendous opportunity for the economic and social upliftment of rural communities in the coastal areas of our country Over a hundred thousand farmers, of whom about 90% belong to the small and marginal category, are engaged in shrimp farming. Penaeus monodon is the most predominant cultured species in India which is mainly exported to highly sophisticated, quality and safety conscious world markets. Food safety has been of concem to humankind since the dawn of history and the concern about food safety resulted in the evolution of a cost effective, food safety assurance method, the Hazard Analysis Critical Control Point (HACCP). Considering the major contribution of cultured Penaeus monodon to the total shrimp production and the economic losses encountered due to disease outbreak and also because traditional methods of quality control and end point inspection cannot guarantee the safety of our cultured seafood products, it is essential that science based preventive approaches like HACCP and Pre requisite Programmes (PRP) be implemented in our shrimp farming operations. PRP is considered as a support system which provides a solid foundation for HACCP. The safety of postlarvae (PL) supplied for brackish water shrimp farming has also become an issue of concern over the past few years. The quality and safety of hatchery produced seeds have been deteriorating and disease outbreaks have become very common in hatcheries. It is in this context that the necessity for following strict quarantine measures with standards and code of practices becomes significant. Though there were a lot of hue and cry on the need for extending the focus of seafood safety assurance from processing and exporting to the pre-harvest and hatchery rearing phases, an experimental move in this direction has been rare or nil. An integrated management system only can assure the effective control of the quality, hygiene and safety related issues. This study therefore aims at designing a safety and quality management system model for implementation in shrimp farming and hatchery operations by linking the concepts of HACCP and PRP.
Resumo:
Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.
Resumo:
The main benefit of Jeevan Saathi policy is that, it is a joint life policy which covers the life of both husband and wife under a single policy. And they also get double benefit if any one of them dies during the term of the policy. The Jeevan Mitra policy is a single life policy, the main advantage of which is that the dependents get double benefit in case of normal death and triple benefit in case of accidental death during the term of policy. so both the policies have their own attractions but when compared with the annual sales of other policies, the additional increase in the sales of these policies are decreasing. It is a fact finding study concerned with market performance of these two policies by conducting a survey among the Jeevan Saathi and Jeevan Mitra policy holders, and a thorough analysis of the various information or data collected from them. This study is an attempt to present an integrated picture of the main features of the policy holders who have bought these policies, the major factors responsible for making them purchase these policies, the various difficulties faced by them at present and further modification needed in the plans of these policies according to the opinion of policy holders. For increasing accuracy of the conclusions, information is also collected from Agents and Development Officers by using interview schedule. The main purpose of this study is to draw attention of LIC to introduce new plans of policies taking into consideration the drawbacks or defects of the existing policies and present needs of policy holders. It will also help to make new plans in order to suit the needs of more people who want to buy life insurance policies
Resumo:
Refiners today operate their equipment for prolonged periods without shutdown. This is primarily due to the increased pressures of the market resulting in extended shutdown-to-shutdown intervals. This places extreme demands on the reliability of the plant equipment. The traditional methods of reliability assurance, like Preventive Maintenance, Predictive Maintenance and Condition Based Maintenance become inadequate in the face of such demands. The alternate approaches to reliability improvement, being adopted the world over are implementation of RCFA programs and Reliability Centered Maintenance. However refiners and process plants find it difficult to adopt this standardized methodology of RCM mainly due to the complexity and the large amount of analysis that needs to be done, resulting in a long drawn out implementation, requiring the services of a number of skilled people. These results in either an implementation restricted to only few equipment or alternately, one that is non-standard. The paper presents the current models in use, the core requirements of a standard RCM model, the alternatives to classical RCM, limitations in the existing model, classical RCM and available alternatives to RCM and will then go on to present an ‗Accelerated‘ approach to RCM implementation, that, while ensuring close conformance to the standard, does not place a large burden on the implementers
Resumo:
The article examines the commodity chain trap of marine fishery in Kerala, at both material and value terms, and its ramifications in the globalised fishery chains. The marketing chains both material and value, are very complex in nature since they involve many types of markets and large number of intermediaries and participants. The article also scrutinizes the sensitivity of consumers’ and country’s responses in terms of dietary and hygienic standards relating to seafood trade. In addition, it discusses the devastating effect about the recent stipulations like the US Bio- Terrorism Act and Shrimp anti-dumping duty on the Kerala fishery products