6 resultados para Airport Metropolis

em Cochin University of Science


Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this thesis we have studied a few models involving self-generation of priorities. Priority queues have been extensively discussed in literature. However, these are situations involving priority assigned to (or possessed by) customers at the time of their arrival. Nevertheless, customers generating into priority is a common phenomena. Such situations especially arise at a physicians clinic, aircrafts hovering over airport running out of fuel but waiting for clearance to land and in several communication systems. Quantification of these are very little seen in literature except for those cited in some of the work indicated in the introduction. Our attempt is to quantify a few of such problems. In doing so, we have also generalized the classical priority queues by introducing priority generation ( going to higher priorities and during waiting). Systematically we have proceeded from single server queue to multi server queue. We also introduced customers with repeated attempts (retrial) generating priorities. All models that were analyzed in this thesis involve nonpreemptive service. Since the models are not analytically tractable, a large number of numerical illustrations were produced in each chapter to get a feel about the working of the systems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This thesis deals with the use of simulation as a problem-solving tool to solve a few logistic system related problems. More specifically it relates to studies on transport terminals. Transport terminals are key elements in the supply chains of industrial systems. One of the problems related to use of simulation is that of the multiplicity of models needed to study different problems. There is a need for development of methodologies related to conceptual modelling which will help reduce the number of models needed. Three different logistic terminal systems Viz. a railway yard, container terminal of apart and airport terminal were selected as cases for this study. The standard methodology for simulation development consisting of system study and data collection, conceptual model design, detailed model design and development, model verification and validation, experimentation, and analysis of results, reporting of finding were carried out. We found that models could be classified into tightly pre-scheduled, moderately pre-scheduled and unscheduled systems. Three types simulation models( called TYPE 1, TYPE 2 and TYPE 3) of various terminal operations were developed in the simulation package Extend. All models were of the type discrete-event simulation. Simulation models were successfully used to help solve strategic, tactical and operational problems related to three important logistic terminals as set in our objectives. From the point of contribution to conceptual modelling we have demonstrated that clubbing problems into operational, tactical and strategic and matching them with tightly pre-scheduled, moderately pre-scheduled and unscheduled systems is a good workable approach which reduces the number of models needed to study different terminal related problems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The main aim of the study is to give a clear picture of various meteorological factors affecting the dispersal of pollutants. One such important developing metropolis, namely Madras, is chosen for the present study. The study throws light into the occurrence of inversions, isothermals and lapse conditions and the vertical and horizontal extent of mixing of pollutants. The thesis also aims to study the wind climatology and atmospheric stability .The study gives a insight to the spatial distribution of sulphudioxide concentration using the Gaussian plume model, which accounts for various industrial sources. The researcher suggests optimum locations for industries and various steps to reduce air pollution.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the case of urban centres of the developing countries, corrective measures for the environmental consequences of spontaneous or wrongly planned developments are often prohibitively costly. Hence environmentally planned development alone appears to be the solution for which, a compre-hensive assessment of all the resources is an essential pre—requisite. An under-standing of the prevailing environmental conditions is essential for the effective management and execution of programmes for sustainable development. The present work is a modest attempt at assessing the environmental resources of Cochin, the industrial and business capital of Kerala and a fast developing metropolis.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present thesis concentrates largely on sound radiation from floating structure due to moving load