10 resultados para utility grid operations

em Brock University, Canada


Relevância:

20.00% 20.00%

Publicador:

Resumo:

As a result of increased acid precipitation, the pH of a large number of Canadian Shield lakes has been falling. Prior to this study there was no documentation available to explain the history of lake acidification for the Algoma area lakes. In order to obtain this information the diatom inferred pH technique was developed in this study. During two field seasons, July 1981 and July 1982, short sediment cores (circa 25-30 cm) were collected from 28 study lakes located north of Lake Superior, District Algoma, Ontario. The surface sediment diatoms (0-1 cm) from each of these lakes were carefully identified, enumerated, and classified in terms of their pH indicator status. The surface sediment diatom analysis indicated that lake pH is one of the most important factors affecting the species composition and relative abundance of diatom populations. Thus diatom assemblages can be sensitive indicators of lake acidification. When Nygaard's index alpha was plotted against observed lake pH, a statistically significant relationship resulted (r=-0.89; p=

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Thecamoebian (testate amoeba) species diversity and assemblages in reclamation wetlands and lakes in northeastern Alberta respond to chemical and physical parameters associated with oil sands extraction. Ecosystems more impacted by OSPM (oil sands process-affected material) contain sparse, low-diversity populations dominated by centropyxid taxa and Arcella vulgaris. More abundant and diverse thecamoebian populations rich in difflugiid species characterize environments with lower OSPM concentrations. These shelled protists respond quickly to environmental change, allowing year-to-year variations in OSPM impact to be recorded. Their fossil record thus provides corporations with interests in the Athabasca Oil Sands with a potential means of measuring the progression of highlyimpacted aquatic environments to more natural wetlands. Development of this metric required investigation of controls on their fossil assemblage (e.g. seasonal variability, fossilization potential) and their biogeographic distribution, not only in the constructed lakes and wetlands on the oil sands leases, but also in natural environments across Alberta.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Power at the Falls: The first recorded harnessing of Niagara Falls power was in 1759 by Daniel Joncairs. On the American side of the Falls he dug a small ditch and drew water to turn a wheel which powered a sawmill. In 1805 brothers Augustus and Peter Porter expanded on Joncairs idea. They bought the American Falls from New York State at public auction. Using Joncairs old site they built a gristmill and tannery which stayed in business for twenty years. The next attempt at using the Falls came in 1860 when construction of the hydraulic canal began by the Niagara Falls Hydraulic Power and Manufacturing Co. The canal was complete in 1861 and brought water from the Niagara river, above the falls, to the mills below. By 1881 the Niagara Falls Hydraulic Power and Manufacturing Co. had a small generating station which provided some electricity to the village of Niagara Falls and the Mills. This lasted only four years and then the company sold its assets at public auction due to bankruptcy. Jacob Schoellkopf arrived at the Falls in 1877 with the purchase of the hydraulic canal land and water and power rights. In 1879 Schoellkopf teamed up with Charles Brush (of Euclid Ohio) and powered Brush’s generator and carbon arc lights with the power from his water turbines, to illuminate the Falls electrically for the first time. The year 1895 marked the opening of the Adam No. 1 generating station on the American side. The station was the beginnings of modern electrical utility operations. The design and operations of the generating station came from worldwide competitions held by panels of experts. Some who were involved in the project include; George Westinghouse, J. Pierpont Morgan, Lord Kelvin and Nikoli Tesla. The plants were operated by the Niagara Falls Power Company until 1961, when the Robert Moses Plant began operation in Lewiston, NY. The Adams plants were demolished that same year and the site used as a sewage treatment plant. The Canadian side of the Falls began generating their own power on January 1, 1905. This power came from the William Birch Rankine Power Station located 500 yards above the Horseshoe Falls. This power station provided the village of Fort Erie with its first electricity in 1907, using its two 10,000 electrical horsepower generators. Today 11 generators produce 100,000 horsepower (75 megawatts) and operate as part of the Niagara Mohawk and Fortis Incorporated Power Group.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Please consult the paper edition of this thesis to read. It is available on the 5th Floor of the Library at Call Number: Z 9999 P65 D53 2007

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Please consult the paper edition of this thesis to read. It is available on the 5th Floor of the Library at Call Number: Z 9999 E38 K66 1983

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research explored environmental sustainability (ES) initiatives at five top-ranked Ontario golf courses that were members of the Audubon Cooperative Sanctuary Program for Golf (ACSP). Research Questions: (1) How are golf courses adapting to safeguard the natural environment? (2) Why or why not are golf courses moving to ES? and (3) What are the arising barriers to ES in golf and how can they be overcome; what role does communication play? Overall, the research was framed with an adaptation of the dimensions of convergence by Houlihan (2012), including the motives, inputs, implementation, momentum, and impact. Additionally, impression management and message framing constructs were utilized to address the issue of communicating ES initiatives. Data collection involved in-depth interviews, observations, and unobtrusive document collection. Environmental aspects of the examination were guided by the Canadian Standards Association (CSA) Requirements and Guidance for Organizers of Sustainable Events and Sustainable Sport and Event Toolkit (SSET).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A memorandum describing the days leading up to the Battle of Saint-Mihiel. The document describes 1. Statement of Operation, 2. Character of Terrain, 3. Initial Dispositions, 4. Suitability of Formations, 5. How such formations were, or could have been, best adapted to meet the changing conditions of combat and terrain, 6. Employment of Infantry Weapons, 7. Artillery Support, 8. Passage of Obstacles, 9. Passage of Lines, 10. Destruction of Opposition, 11. Fighting in Intermediate Zone, 12. Organization of Ground, 13. Liaison, 14. General Observations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A "journal of Cantigny operations" starting at 12:15 a.m. May 28th through May 30th. The final entry reads: "May 30th: Colonel Holbrook reports that the Germans started another Counter Attack about 3:30A.M. that the first wave got through our barrage, but did not reach our lines and that the second wave was destroyed by our barrage."

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A report on the operations in Mouzon starting October 12 through November 6th. The attack took place November 6th according to the report. Also included is a list of prisoners from enemy units.