18 resultados para ownership cost

em Brock University, Canada


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Electrical Development Company of Ontario was created in 1903. It was one of three private power companies that had water power leases with the Niagara Parks Commission, but was the only one that was financed with Canadian capital. The company built the Toronto Power Generating Station at Niagara Falls beginning in 1906, and the power house was completed in 1913. During the construction, there was much debate about whether the utility should remain privately operated or become a public utility. In 1920, the company became part of the public utility.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a body of academic literature addressing two issues of importance for leveling the playing field for all classes of investors: 1) the impact of institutional investors on liquidity; and 2) the impact of Regulation Fair Disclosure on institutional investors and liquidity. Our study addresses both issues with the purpose of attaining a better understanding and explanation of this relationship. We classify institutional ownership according to Bushee's (1998, 2001) methodology; transient institutions, dedicated institutions and quasi-indexers. Our results indicate that while transient institutions and quasi-indexers have a positive impact on liquidity, dedicated institutional ownership is negatively associated with liquidity. This result is consistent with prior theoretical studies. We also find that the effectiveness ofthe Regulation Fair Disclosure in improving liquidity is limited to firms with higher transient institutional ownership, whereas quasi-indexed institutions have not been significantly affected by the regulations. In fact, the liquidity of firms is lower for firms with higher dedicated institutional holdings, which is evidence of the "chilling effect".

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of the present study was to examine the role of the bystander in bullying situations. A cost/benefit model was explored in researching factors adolescents consider in deciding whether to intervene when witnessing bullying. Adolescents in the present study (N = 101 (50.5% female), between the ages of 12 to 18, M = 15.37 years; SD = 1.71 years) completed self-report questionnaires, and also responded to bullying scenarios, stating how the bystander would react, while explaining potential personal costs and benefits. Adolescents were able to articulate various personal costs and benefits when making the decision to intervene. Conclusions of the present study include: 1) the evolutionary approach is quite informative in illuminating the decision process of the bystander, 2) adolescents’ beliefs about bullying and the role of bystanders are different from their teachers’, and 3) the rather explicit cost/benefit model could be used to develop more targeted anti-bullying programs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Handwritten sheet of paper detailing the cost of transporting boxes containing the Gravatt’s level from London to St. Catharines, April 1847.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Handwritten sheet of paper detailing the cost of transporting boxes containing the Gravatt’s level from London to St. Catharines. This sheet is signed by S.D. Woodruff, Jan. 11, 1847.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximate cost of completing the railway from Port Dalhousie to St. Catharines and an estimate of the cost of the piers at Port Dalhousie signed by William Hamilton Merritt (5 pages, handwritten), July 8, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximate estimate of the cost of completing the Port Dalhousie Railway to the Grand Central Railway Station at Lock 12. This document is badly torn and burned but most of the text is legible, July 14, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Estimated cost of the Port Dalhousie and Thorold Railway sent to George Rykert by S.D. Woodruff, Aug. 5, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximate estimate of the cost of constructing and completing the Port Dalhousie and Thorold Railway to St. Catharines signed by S.D. Woodruff (2 pages, handwritten), Jan. 8, 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cost of the railway from Port Dalhousie to St. Catharines (1 page, handwritten), Jan. 11, 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximate estimate of the cost of extending the Port Dalhousie and Thorold Railway from Geneva Street to the Great Western Railway Station at Lock no. 12 (2 copies) [one appears to be a rough copy] (2 pages, handwritten), Feb. 2, 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chart of estimate of cost of Port Dalhousie and Thorold Railway extension Line no. 1 signed by Mr. Shanly, Mar. 12, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chart of the estimated cost of Line no. 1, n.d.