39 resultados para leaf extension
em Brock University, Canada
Resumo:
The hypothesis that rapid y-aminobutyric acid (GABA) accumulation is a plant defense against phytophagous insects was investigated. Simulation of mechanical damage resulting from phytophagous insect activity increased soybean (Glycine max L.) leaf GABA 10- to 25-fold within 1 to 4 min. Pulverizing leaf tissue resulted in a value of 2. 15 (±O. 11 SE) ~mol GABA per gram fresh weight. Increasing the GABA levels in a synthetic diet from 1.6 to 2.6 Jlffiol GABA per gram fresh weight reduced the growth rates, developmental rates, total biomass (50% reduction), and survival rates (30% reduction) of cultured Oblique banded leaf-roller (OBLR) (Choristonellra rosacealla Harris) larvae. In field experiments OBLR larvae were found predominantly on young terminal leaves which have a reduced capacity to produce GABA in response to mechanical damage. Glutamate decarboxylase (GAD) is a cytosolic enzyme which catalyses the decarboxylation of L-Glu to GABA. GAD is a calmodulin binding enzyme whose activity is stimulated dramatically by increased cytosolic H+ or Ca2 + ion concentrations. Phytophagous insect activity will disrupt the cellular compartmentation of H+ and Ca2 +, activate GAD and subsequent GABA accumulation. In animals GABA is a major inhibitory neurotransmitter. The possible mechanisms resulting in GABA inhibited growth and development of insects are discussed.
Resumo:
Ontario Editorial Bureau (O.E.B.)
Resumo:
The text reads as follows: nomen Domini invocabo. V. Date magnitudinem Deo nostro: Deus, vera opera eius, et omnes viae eius indicia. V. Deus fidelis, in quo….. Translated: I will invoke the name of the Lord. V. Give ye magnificence to our God: The works of God are perfect, and all his ways are judgments. V. Let my doctrine gather as the rain…..
Resumo:
The text reads as follows: Narrator: Passio domini nostri iesu christi secundum matheum. In illo tempore dixit iusus discipulis suis. Christ: Scritis quia post biduum pascha fiet, et filius hominis tradetur ut crucifigatur. Narrator: Tumc congregati sunt principes sacerdotum et seniores populi, in atrium principis… Translated: Narrator: The Passion of Our Lord Jesus Christ according to Matthew. “And it came to pass when Jesus had finished all of these words that he said to his disciples: Christ: You know that after two days the Passover will be here; and the Son of Man will be delivered up to be crucified. Narrator: Then the chief priests and the elders of the people gathered together in the court of the high priest…
Resumo:
Envelope containing a four leaf clover “for luck” and little Margaret’s hair (9 mos. old), Sept. 3, 1937.
Resumo:
Gold leaf that belonged to great grandmother French. This is enclosed in an envelope which has Jas. Carruthers and Co. Grain Exporters, New York as a return address, n.d.
Resumo:
List of Employees to be involved in the extension of the Port Dalhousie and Thorold Railway (1 page, handwritten). This is signed by S.D. Woodruff, Nov. 25, 1856.
Resumo:
Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.
Resumo:
Chart of estimate of cost of Port Dalhousie and Thorold Railway extension Line no. 1 signed by Mr. Shanly, Mar. 12, 1857.
Resumo:
Report sent to the President and Director of the Port Dalhousie and Thorold Railway stating that the location of the line extension of the railway is completed. The distance from Thorold Station to Port Colborne is 20 miles. The estimate provides for construction of a permanent structure across the Chippewa and Welland River. Estimates for building a first class road, culverts and bridges will be of permanent and durable masonry. This includes estimates for various station buildings such as a warehouse in Port Colborne and a warehouse in Port Dalhousie. Surveys and plans are ready and will be registered this week. This is signed by S.D. Woodruff (2 copies) [one appears to be a rough copy] (The rough copy is 5 pages, handwritten and the other copy is 6 pages, handwritten), Apr. 8, 1857.
Resumo:
Voucher #2 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for surveys, paid to Daniel Plumsteel, Dec. 31, 1856.
Resumo:
Voucher #3 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for sinking test pits, paid to Thomas Woods, Dec. 31, 1856.
Resumo:
Voucher #5 from the Engineer Department of Port Dalhousie and Thorold Railway Extension to George Forbes for surveys, Jan. 31, 1857.
Resumo:
Voucher #6 from the Engineer Department of Port Dalhousie and Thorold Railway Extension to Thomas Woods for surveys, Jan. 31, 1857.