7 resultados para electricity supply

em Brock University, Canada


Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND: Capillaries function to provide a surface area for nutrient and waste exchange with cells. The capillary supply of skeletal muscle is highly organized, and therefore, represents an excellent choice to study factors regulating diffusion. Muscle is comprised of three specific fibre types, each with specific contractile and metabolic characteristics, which influence the capillary supply of a given muscle; in addition, both environmental and genetic factors influence the capillary supply, including aging, physical training, and various disease processes. OBJECTIVE: The present study was undertaken to develop and assess the functionality of a data base, from which virtual experiments can be conducted on the capillary supply of human muscle, and the adaptations of the capillary bed in muscle to various perturbations. METHODS: To create the database, an extensive search of the literature was conducted using various search engines, and the three key words - "capillary, muscle, and human". This search yielded 169 papers from which the data for the 46 variables on the capillary supply and fibre characteristics of muscle were extracted for inclusion in the database. A series of statistical analyses (ANOVA) were done on the capillary database to examine differences in skeletal muscle capillarization and fibre characteristics between young and old individuals, between healthy and diseased individuals, and between untrained, endurance trained, endurance welltrained, and resistance trained individuals, using SAS. RESULTS: There was a significantly higher capillarization in the young compared to the old individuals, in the healthy compared to the diseased individuals, and in the endurance-trained and endurance well-trained compared to the untrained individuals. CONCLUSIONS: The results of this study support the conclusion that the capillary supply of skeletal muscle is closely regulated by factors aimed at optimizing oxygen and nutrient supply and/or waste removal in response to changes in muscle mass and/or metabolic activity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sir Adam Beck ( a London, Ontario manufacturer, Mayor and Conservative member of the provincial legislature) was a champion of municipal and provincial power ownership. Beck become the “Power Minister” and chairman of the Hydro-Electric Power Commission of Ontario which was the world’s first publicly owned utility. In 1925 the first unit of the Hydro Electric Power Commission’s Queenston Chippawa hydro-electric development on the Niagara River went into service. The station was renamed in 1950 as “Sir Adam Beck #1”. This marked the 25th anniversary of Beck’s death. This is one of 2 generating stations in Niagara Falls. There is also Adam Beck Plant #2. The Niagara generating stations supply one quarter of all power used in New York State and Ontario.Ontario Hydro has two water tunnels which traverse the entire City of Niagara Falls from the Village of Chippawa in the South to the Sir Adam Beck Hydro Electric Generating Stations in the North. Also they are in the process of building the third tunnel. In addition, Ontario Hydro has a 13.6 km open canal which traverses the entire City of Niagara Falls. Source: http://www.hydroone.com/OurCompany/Pages/OurHistory.aspx

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this thesis, I focus on supply chain risk related ambiguity, which represents the ambiguities firms exhibit in recognizing, assessing, and responding to supply chain disruptions. I, primarily, argue that ambiguities associated with recognizing and responding to supply chain risk are information gathering and processing problems. Guided by the theoretical perspective of bounded rationality, I propose a typology of supply chain risk related ambiguity with four distinct dimensions. I, also, argue that the major contributor to risk related ambiguity is often the environment, specifically the web of suppliers. Hence, I focus on the characteristics of these supplier networks to examine the sources of ambiguity. I define three distinct elements of network embeddedness – relational, structural, and positional embeddedness – and argue that the ambiguity faced by a firm in appropriately identifying the nature or impacts of major disruptions is a function of these network properties. Based on a survey of large North American manufacturing firms, I found that the extent of the relational ties a firm has and its position in the network are significantly related to supply chain risk related ambiguity. However, this study did not provide any significant support for the hypothesized relationship between structural embeddedness and ambiguity. My research contributes towards the study of supply chain disruptions by using the idea of bounded rationality to understand supply chain risk related ambiguity and by providing evidence that the structure of supply chain networks influences the organizational understanding of and responses to supply chain disruptions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Association of Major Power Consumers in Ontario (AMPCO) was founded as the Niagara Basic Power Users' Association in the early 1960s. It was a coalition of seven companies in the chemical, pulp and paper, and abrasives industries within the Niagara region. The Association was formed to address increasing electricity rates. In 1974, the name changed to the Association of Direct Customers of Ontario. This change reflected the expansion of the regional Association to a provincial one, which grew in response to Ontario Hydro’s proposed rate increases of over 30 per cent. In 1975, the Association adopted its current name. AMPCO continues to advocate for “electricity rates that are competitive, fair and efficient, and a reliable supply of electrical energy across Ontario.”

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report (20 page booklet) on a water supply for the town of St. Catharines by Thomas Monro, civil engineer. This is addressed to Lucious S. Oille, M.D., chairman of the Water Committee of St. Catharines, June 10, 1875.