4 resultados para Tunnels

em Brock University, Canada


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Steel framework being laid for the Service Distribution Tunnel. Many of these tunnels run under the Brock Campus supplying important utilities and other functions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Work on service tunnels and foundations for the Mackenzie Chown Complex.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Sir Adam Beck ( a London, Ontario manufacturer, Mayor and Conservative member of the provincial legislature) was a champion of municipal and provincial power ownership. Beck become the “Power Minister” and chairman of the Hydro-Electric Power Commission of Ontario which was the world’s first publicly owned utility. In 1925 the first unit of the Hydro Electric Power Commission’s Queenston Chippawa hydro-electric development on the Niagara River went into service. The station was renamed in 1950 as “Sir Adam Beck #1”. This marked the 25th anniversary of Beck’s death. This is one of 2 generating stations in Niagara Falls. There is also Adam Beck Plant #2. The Niagara generating stations supply one quarter of all power used in New York State and Ontario.Ontario Hydro has two water tunnels which traverse the entire City of Niagara Falls from the Village of Chippawa in the South to the Sir Adam Beck Hydro Electric Generating Stations in the North. Also they are in the process of building the third tunnel. In addition, Ontario Hydro has a 13.6 km open canal which traverses the entire City of Niagara Falls. Source: http://www.hydroone.com/OurCompany/Pages/OurHistory.aspx

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Construction on the Thorold tunnel began in 1965 and was completed in 1967. It was designed by H. G. Acres & Company Ltd. and built by Pitts-Atlas, a joint venture of C.A. Pitts, General Contractor Ltd., and Atlas Construction Company Ltd. The tunnel replaced two lift bridges (Bridge 9 at Ontario Paper Co. and Bridge 7) that carried traffic over the Welland Canal. The majority of the construction occurred during the winter months, when the canal was closed to shipping. The water was drained and concrete sections shaped liked tubes were poured, creating the tunnel. During the summer months, the end sections of the tunnel were constructed so that shipping could continue uninterrupted. The 24 million dollar project was financed jointly by the Department of Highways and the St. Lawrence Seaway Authority. The tunnel was officially opened on September 18, 1968.