6 resultados para Spectrally bounded

em Brock University, Canada


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Two-Connected Network with Bounded Ring (2CNBR) problem is a network design problem addressing the connection of servers to create a survivable network with limited redirections in the event of failures. Particle Swarm Optimization (PSO) is a stochastic population-based optimization technique modeled on the social behaviour of flocking birds or schooling fish. This thesis applies PSO to the 2CNBR problem. As PSO is originally designed to handle a continuous solution space, modification of the algorithm was necessary in order to adapt it for such a highly constrained discrete combinatorial optimization problem. Presented are an indirect transcription scheme for applying PSO to such discrete optimization problems and an oscillating mechanism for averting stagnation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Sediment samples were taken from seven locations in the WeIland River in December 1986 and April 1987. The DMSO extracts of these sediment samples showed a significant (pbounded by an industrialized area were slightly toxic according to -the alkaline phosphatase inhib_ii~ion component of the 50S chromotest analyses. The toxicity of these samples was only evident once they had been activated by the 59 (liver extract) mixture.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The McElroy and Larder Lake assemblages, located in the southern Abitibi Greenstone Belt are two late Archean metavolcanic sequences having markedly contrasting physical characteristics arid are separated from one another by a regional fault. An assemblage is an informal term which describes stratified volcanic and/or sedimentary rock units built during a specific time period in a similar depositional or volcanic setting and are commonly bounded by faults, unconformities or intrusions. The petrology and petrogenesis of these assemblages have been investigated to determine if a genetic link exists between the two adjacent assemblages. The McElroy assemblage is homoclinal sequence of evolved massive and pillowed fl.ows, which except for the basal unit represents a progressively fractionated volcanic pile. From the base to the top of the assemblage the lithologies include Fe-tholeiitic, dendritic flows; komatiite basaltic, ultramafic flows; Mg-tholeiitic, leucogabbro; Mg-tholeiitic, massive flows and Fe-tholeiitic, pillowed flows. Massive flows range from coarse grained to aphanitic and are commonly plagioclase glomerophyric. The Larder Lake assemblage consists of komatiitic, Mg-rich and Fe-rich tholeiitic basalts, structurally disrupted by folds and faults. Tholeiitic rocks in the Larder Lake assemblage range from aphanitic to coarse grained massive and pillowed flows. Komatiitic flows contain both spinifex and massive textures. Geochemical variability within both assemblages is attributed to different petrogenetic histories. The lithologies of the McElroy assemblage were derived by partial melting of a primitive mantle source followed by various degrees of crystal fractionation. Partial melting of a primitive mantle source generated the ultramafic flows and possibly other flows in the assemblage. Fractionation of ultramafic flows may have also produced the more evolved McElroy lithologies. The highly evolved, basal, dendritic flow may represent the upper unit 3 of a missing volcanic pile in which continued magmatism generated the remaining McElroy lithologies. Alternatively, the dendritic flows may represent a primary lava derived from a low degree (10-15%) partial melt of a primitive mantle source which was followed by continued partial melting to generate the ultramafic flows. The Larder Lake lithologies were derived by partial melting of a komatiitic source followed by gabbroic fractionation. The tectonic environment for both assemblages is interpreted to be an oceanic arc setting. The McElroy assemblage lavas were generated in a mature back arc setting whereas the Larder Lake lithologies were produced during the early stages of komatiitc crust subduction. This setting is consistent with previous models involving plate tectonic processes for the generation of other metavolcanic assemblages in the Abitibi Greenstone Belt.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Transcript (original spelling and grammar retained): By His Excellency Robert Prescott Esquire, Captain General and Governor in Chief in and over His Majestys Provinces of Upper and Lower Canada, General and Commander in Chief of all His Majesty’s forces in the Provinces of Upper and Lower Canada, Nova Scotia, New Brunswick and their several Dependencies and in the Island of Newfoundland &ca. &ca. &ca. I do hereby authorise and permit Thomas Clark of Queenstown in the County of Lincoln in the Province of Upper Canada merchant to take possession of all that Lot, piece and parcel of Land (being part of the land reserved by his Majesty for Military purposes) situate, lying and being at Queenstown in the Township of Newark, in the Home District in the said Province of Upper Canada, bounded and abutted as follows, that is to say beginning at the Distance of two Chains and ninety links from the South East End of his Majesty’s Store House, the said distance being measured along the Bank up Stream, thence South thirty nine degrees and an half West one Chain and fifty links thence south fifty degrees and an half East one Chain and thirty links thence North thirty nine degrees and an half East to the Edge of the Bank and from thence along the Bank to the place of beginning, containing thirty one perches and one hundred and twenty five square links and to occupy and hold the said Lot, piece and parcel of Land during pleasure subject nevertheless to the provisoes and Conditions herein after contained, that is to say. First on condition that it shall and may be lawful to and for His Majesty his Heirs and Successors and to and for the Commander in Chief of His Majesty Forces for the time being and to and for the Officer commanding his Majesty’s Forces in Upper Canada for the time being and to and for either of them to determine and make void this present permission to occupy during pleasure the said Lot, Piece or Parcel of Land above described at any time hereafter whenever he or they shall see fit so to do without any compensation or indemnification to the said Thomas Clark or any other Person or Persons whosoever for any Loss Injury or Damage which he the said Thomas Clark or any other Person or Persons whosoever may thereby sustain. Secondly on this further Condition that it shall and may be lawful to and for His Majesty his Heirs and Successors and to and for his and their Officers, Soldiers and Servants at any time hereafter by order of the Commander in Chief of His Majesty’s Forces for the time being or by order of the Officer commanding his Majesty’s forces in Upper Canada for the time being or by order of the Officer of His Majesty’s Corps of Royal Engineers commanding in the said Province of Upper Canada for the time being to enter upon the said Lot Piece and parcel of Land which the said Thomas Clark is hereby permitted to occupy during pleasure or upon any part thereof and to take down and from the said Lot piece and parcel of Land or from any part thereof to remove any dwelling House Store or other Buildings on the said Lot, piece or Parcel of Land or any part thereof erected and to remove any goods or Chattels on the said Lot piece and parcel of Land or on any part thereof or on any such dwelling House Store or other building found or being and that His Majesty his Heirs and Successors or any other Person or Persons whosoever shall not be liable or responsible to the said Thomas Clark or to any other Person or Persons whosoever for any Loss, Injury or Damage which he or they shall or may in such case sustain. Thirdly on this further Condition that the said Thomas Clark shall not erect on the said Lot Piece or Parcel of Land which the said Thomas Clark is hereby permitted to occupy during pleasure or upon any part thereof at any time or times hereafter any dwelling House store or other Building whatsoever of Stone or brick or of any other materials wood only exccepted and that if any dwelling House or Store or other building of Stone or brick or of any other materials except wood shall at any time be erected on the said Lot, piece or parcel of Land or upon any part thereof, then and in such case, this present permission and every Clause and Article thereof shall from thenceforth cease and determine and be absolutely and entirely null and void. And lastly on this further Condition that the said Thomas Clark or any other Person whosoever shall not assign this permission to occupy the said Lot, Piece or Parcel of Land above described to any Person of Persons whosoever, and if any such assignment shall be made by the said Thomas Clark or by any other Person in his right, or on his behalf, that then and in such case such assignment and this permission to occupy during pleasure the said Lot piece and parcel of Land above described, and every Clause and Article thereof shall from thenceforth cease and determine and be absolutely and entirely null and void. Given under my hand at the Castle of St. Lewis in the City of Quebec in the Province of Lower Canada this Ninth day of July in the year of our Lord one thousand seven hundred and ninety eight and in the thirty eighth year of His Majesty’s Reign. [Signed here by Robert Prescott] By Order of the Commander in Chief [Signed here by James Green (Illegible signature)] I the said Thomas Clark above named do hereby accept the above written Permission to occupy during pleasure the said Lot piece and parcel of Land above described upon and subject to the several Provisioes and Conditions above written and each and every of them severally and respectively. In witness whereof I have hereunto set my hand the Sixteenth day of August in the year of our Lord one thousand seven hundred and ninety eight and in the thirty eighth year of His Majesty’s Reign. [Signed here by Thomas Clark] Signed in the presence of [Illegible signature – looks like J. M Donell Lt. Col.] [Illegible – looks like 2d. Battn R. C. Sm?] [Signed here by C. Anderson] Whereas Inconveniences did arise from the peculiar situation of the Ground contiguous to the above described Lot of Land and the occupation thereof, if estimated by the above Limits would prove highly disadvantageous to Mr. Thomas Clark be it known that in consideration thereof we do permit the above Lot to extend one half Chain more in length up stream so as to comprehend the space allowed for the Road between Lots Two + Three, and we do hereby appropriate the said additional space wholly to the use of the said Thomas Clark. In witness whereof we have hereunto subscribed this Thirteenth Day of October in the Year of our Lord one thousand Eight Hundred and one. [Signed here by J. M’Donell Lt. Col] 2d. Battn. R. C. [in?] Com of Fort George + Dependencies Robt. Pilkington Captain Royal Engineers

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this thesis, I focus on supply chain risk related ambiguity, which represents the ambiguities firms exhibit in recognizing, assessing, and responding to supply chain disruptions. I, primarily, argue that ambiguities associated with recognizing and responding to supply chain risk are information gathering and processing problems. Guided by the theoretical perspective of bounded rationality, I propose a typology of supply chain risk related ambiguity with four distinct dimensions. I, also, argue that the major contributor to risk related ambiguity is often the environment, specifically the web of suppliers. Hence, I focus on the characteristics of these supplier networks to examine the sources of ambiguity. I define three distinct elements of network embeddedness – relational, structural, and positional embeddedness – and argue that the ambiguity faced by a firm in appropriately identifying the nature or impacts of major disruptions is a function of these network properties. Based on a survey of large North American manufacturing firms, I found that the extent of the relational ties a firm has and its position in the network are significantly related to supply chain risk related ambiguity. However, this study did not provide any significant support for the hypothesized relationship between structural embeddedness and ambiguity. My research contributes towards the study of supply chain disruptions by using the idea of bounded rationality to understand supply chain risk related ambiguity and by providing evidence that the structure of supply chain networks influences the organizational understanding of and responses to supply chain disruptions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Indenture between The Honourable Peter Russell, His Majesty’s Receiver General and William Dickson 10 acres bounded by a Port, and a Military Reserve. This document is slightly torn and taped. This does not affect the text – instrument no. 6507, Aug. 22, 1798.