43 resultados para Road drainage

em Brock University, Canada


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Chart of land drainage for the Welland Canal final estimate of work done on sections no.1, 2 and 3 on the road below lock no. 2 leading to Port Dalhousie. Work commenced Nov. 1846 and finished July 1847. Road work and the waste weir no.1 to Port Dalhousie work commenced Aug. 1847 and finished Sept. 1847, Nov.1, 1847.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The analysis of fossil diatoms and Mallomonas assemblages in a 2.85 m sediment core revealed that a series of distinct floristic changes have occurred in the development of Found Lake, a small Shield lake in southern Ontario. Climatic and vegetational changes in the lake's watershed were closely associated with successional changes in the lake's biota. Nutrients released by the deciduous component of the Found Lake watershed appeared to be especially important in determining diatom and Mallomonas standing crop. The top 20 cm of sediment of 3 ,Shield lakes was then investigated using close interval (1 cm) analyses of diatoms, Mallomonas scales, pollen grains and sedimentary phosphorus. Found and Jake Lake are adjacent to Highway 60, whereas Delano Lake has been undisturbed and was used as a control. Dramatic changes in the diatom and Mallomonas communities were recorded in the Found and Jake Lake stratigraphies and could be closely associated with known historical events. Increased turbidity and nutrient enrichment were believed responsible for these successional changes. In addition, diatom and Mallomonas standing crop increased substantially following road construction in Found Lake's drainage basin. Meanwhile, no. sharp changes in diatom or Mallomonas communities were recorded in the recent sediments of the control (Delano) lake. The use£ulness o£ Synuracean scales as paleoindicators, as well as the importance o£ sectioning cores at close intervals during transition periods in a laker's development, was stressed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Attributed to John Lowell. Cf. NUC pre-1956 imprints.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Attributed to John Lowell. Cf. NUC pre-1956 imprints. Caption title. Shaw and Shoemaker

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As institutions of higher education struggle to stay relevant, competitive, accessible, and flexible, they are scrambling to attend to a shift in focus for new students. This shift involves experiential learning. The purpose of this major research paper was to examine the existing structures, to seek gaps in the experiential learning programs, and to devise a framework to move forward. The specific focus was on experiential learning at Brock University in the Faculty of Applied Health Sciences. The methodology was underscored with cognitive constructivism and appreciative theory. Data collection involved content analysis steps established by Krippendorff (2004) and Weber (1985). Data analysis involved the four dimensions of reflection designed by LaBoskey, including the purpose, context, content, and procedures. The results developed understandings on the state of formal processes and pathways within service learning. A tool kit was generated that defines service learning and offers an overview of the types of service learning typically employed. The tool kit acts as a reference guide for those interested in implementing experiential learning courses. Importantly, the results also provided 10 key points in experiential learning courses by Emily Allan. A flow chart illustrates the connections among each of the 10 points, and then they are described in full to establish a strategy for the way forward in experiential learning.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Clipping regarding the original road allowance which was part of Mr. Woodruff’s property, n.d. Clipping regarding the Lock 2 Bridge. This is a letter to the editor of the Journal from Calvin Phelps of Lockport, Nov. 13, 1889. Clipping entitled “Settled beyond a Dispute”: a letter to the Editor of the Star from J. G. Currie regarding the road allowance in the 5th Concession of Grantham, Nov. 16, 1889. Clipping entitled “That Old Road Allowance” which is a rebuttal to Mr. Currie’s letter, [1889] 2 newspaper clippings regarding: “Reg. vs. Toronto Railway Company”. These 2 articles are glued to a piece of paper. Beneath the newspaper articles is the name M. Chambers, Nov. 18, 1898. Notes regarding the clippings are enclosed with the articles. These notes and written on the back of “Pattison, Collier and Shaw Barristers, Solicitors, Etc.” stationary (notes are 2 pages, handwritten), Nov. 18, 1898. Clipping entitled “History on the Site: St. Davids’ Students Learn Lessons where Events Occurred” (2 copies), n.d.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Unsigned letter to Charles Stuart, clerk of the municipality of the township of Thorold regarding the proposed line of macadamized road from Hurst’s Bridge to Port Robinson (1 ¼ pages, handwritten), May 9, 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter of request to Charles Stuart from S.D. Woodruff for payment for expenses for surveying the macadamized road from Port Robinson to Hurst’s Bridge, July 4, 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreement to undertake construction and complete the road in accordance with the engineer or the Port Robinson and Thorold macadamized road. This is signed by John Williams, Aug. 11, 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter containing specifications for the construction of the Port Robinson and Thorold macadamized road sent to Matthews from S.D. Woodruff (3 pages, handwritten), Aug. 25, 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter to S.D. Woodruff regarding a resolution passed on May 17, 1856 by the Board of Directors of the Port Robinson and Thorold Macadamized Road Committee This is signed by Duncan McFarland, president, May 27, 1856.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Diagram of Lot 142 and Lot 186 showing the line of the road in red, Dec.10, 1856.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter to S.D. Woodruff regarding resolution #5 of the Board of Directors. Mr. Woodruff is requested to take steps to ensure the early completion of the Port Dalhousie and Thorold macadamized road. This is signed by James McCoppen, president. The letter is stained and worn torn in spots. This does not affect the text, July 11, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter from S.D. Woodruff to the president and directors of the Port Robinson and Thorold Macadamized Road Committee regarding extra work done (3 pages, handwritten), Aug. 6, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Note showing amount of work done on Port Dalhousie Road, Sept. 21, 1854.