4 resultados para Queensland Road Construction
em Brock University, Canada
Resumo:
The analysis of fossil diatoms and Mallomonas assemblages in a 2.85 m sediment core revealed that a series of distinct floristic changes have occurred in the development of Found Lake, a small Shield lake in southern Ontario. Climatic and vegetational changes in the lake's watershed were closely associated with successional changes in the lake's biota. Nutrients released by the deciduous component of the Found Lake watershed appeared to be especially important in determining diatom and Mallomonas standing crop. The top 20 cm of sediment of 3 ,Shield lakes was then investigated using close interval (1 cm) analyses of diatoms, Mallomonas scales, pollen grains and sedimentary phosphorus. Found and Jake Lake are adjacent to Highway 60, whereas Delano Lake has been undisturbed and was used as a control. Dramatic changes in the diatom and Mallomonas communities were recorded in the Found and Jake Lake stratigraphies and could be closely associated with known historical events. Increased turbidity and nutrient enrichment were believed responsible for these successional changes. In addition, diatom and Mallomonas standing crop increased substantially following road construction in Found Lake's drainage basin. Meanwhile, no. sharp changes in diatom or Mallomonas communities were recorded in the recent sediments of the control (Delano) lake. The use£ulness o£ Synuracean scales as paleoindicators, as well as the importance o£ sectioning cores at close intervals during transition periods in a laker's development, was stressed.
Resumo:
Agreement to undertake construction and complete the road in accordance with the engineer or the Port Robinson and Thorold macadamized road. This is signed by John Williams, Aug. 11, 1855.
Resumo:
Letter containing specifications for the construction of the Port Robinson and Thorold macadamized road sent to Matthews from S.D. Woodruff (3 pages, handwritten), Aug. 25, 1855.
Resumo:
Letter regarding an estimate on the amount of money needed for the construction of the road. The salutation is “Sir”. There is no signature, May 28, 1855.