19 resultados para Plan Regulador
em Brock University, Canada
Resumo:
Pre 1913 plan showing the Grand Central Hotel and Santorium Co. Ltd. on St. Paul Street, St. Catharines, Ont.
Resumo:
The original Master Plan of 1964 called for the campus to stretch out 1 1/4 miles across the escarpment with arts buildings west of the tower and science buildings to the east. This plan laid out the development of Brock for the next 10 or 11 years by which time enrollment was expected to be near 8000 students.
Resumo:
Master Plan Phase 2. Map of the original 1964 master plan showing the planned campus layout and distances from the centre of campus (ie. the Tower).
Resumo:
Master Plan Phase 2. This overhead map of the original 1964 Master Plan shows the planned campus layout along the escarpment.
Resumo:
1969-70 floor plan for the old Glenridge Campus located at Glenridge and Lockhart. For a more detailed copy, please contact the archives.
Resumo:
Municipalities that engage in recreation planning have the potential to use their resources more effectively. However, successful planning means getting the plan off the shelf and implemented. This study investigated the factors that influenced municipal recreation plan implementation in three municipalities. Interviews were conducted with eleven key informants (recreation directors, planning consultants, a city councillor, and members of plan steering committees). The findings of this study suggested that because the implementation of recreation plans occurs in a highly political environment, recreation professionals will need effective strategies to get their plans implemented and that implementation can be facilitated by developing or expanding strategies that: (l) build the power of the recreation department within the municipal government structure; (2) build support for recreation within the local community; and (3) build the political and organizational capacity in the recreation department.
Resumo:
1 map :|bdigital, JPEG file
Resumo:
Survey map and description of the land at the cut of the Chippewa or Welland River. Created by The Welland Canal Company. Included is a drawing of the land along with brief surveyors notes. Noteable features include; bridge, Welland River, road, Stone house, J. Cummings Esq. house, military line, military land, Old Fort, old military draw bridge. Surveyor notes are seen in pencil on the map.
Resumo:
Plan and profile of discharge tunnel along Niagara River. The horizontal scale is 1 inch = 100 feet, the vertical scale is 1 inch = 40 feet. The drawing is dated November 7, 1902.
Resumo:
The Niagara River Remedial Action Plan was part of an initiative to restore the integrity of the Great Lakes Basin ecosystem. In 1972, the Great Lakes Water Quality Agreement was signed by both Canada and the United States to demonstrate their commitment to protecting this valuable resource. An amendment in 1987 stipulated that Remedial Action Plans (RAPs) be implemented in 43 ecologically compromised areas known as Areas of Concern. The Niagara River was designated as one of these areas by federal and provincial governments and the International Joint Commission, an independent and binational organization that deals with issues concerning the use and quality of boundary waters between Canada and the United States. Although the affected area included parts of both the Canadian and American side of the river, Remedial Action Plans were developed separately in both Canada and the United States. The Niagara River (Ontario) RAP is a three-stage process requiring collaboration between numerous government agencies and the public. Environment Canada, the Ontario Ministry of the Environment, and the Niagara Peninsula Conservation Authority are the agencies guiding the development and implementation of the Niagara River (Ontario) RAP. The first stage is to determine the severity and causes of the environmental degradation that resulted in the location being designated an Area of Concern; the second stage is to identify and implement actions that will restore and protect the health of the ecosystem; and the third stage is to monitor the area to ensure that the ecosystem’s health has been restored. Stage one of the RAP commenced in January 1989 when a Public Advisory Committee (PAC) was established. This committee was comprised of concerned citizens and representatives from various community groups, associations, industries and municipalities. After several years of consultation, the Niagara River (Ontario) Remedial Action Plan Stage 2 Report was released in 1995. It contained 16 goals and 37 recommendations. Among them was the need for Canadians and Americans to work more collaboratively in order to successfully restore the water quality in the Niagara River. Stage three of the Niagara River (Ontario) RAP is currently ongoing, but it is estimated that it will be completed by 2015. At that point, the Niagara River Area of Concern will be delisted, although monitoring of the area will continue to ensure it remains healthy.
Resumo:
A plan of part of the lands of the Six Nations Indians, dated January 26, 1833. A note on the plan reads “Part of the lands of the Six Nations Indians as surveyed by order of their Superintendent, John Brant, Esq. Dated at the Mohawk Village, the 29th day of April, 1831. Part of which was returned to the office of the Honourable, the Commissior of Crown Lands, on the 31st Oct. 1831, and now rendered more complete by a continuation of the survey under the same order in 1832, and by information obtained from private practice not connected with my official instructions all of which is most respectfully submitted to the inspection and for the information of His Majesty’s Government by Lewis Burwell, Surveyor”. The map shows the early loyalist land holdings in the Brantford area.
Resumo:
A map titled "Plan of Attack of a Iagdkommaudo west of Cantigny on 27 May 1918. There are two sketches and the legend indicates that sketch no. 1 is "Firing until 7A.M." and sketch no. 2 is "Firing after 7A.M."
Resumo:
A map titled "Plan of Organization of Conquered Position". There is a legend at the top right that reads: "Parallel of Surveillance, Parallel of Resistance, Parallel of the Redoubts, Limit between Bns., Final Objective, Final Line after Counter Attack." The map is dated 17 December 1918
Resumo:
A map titled "Plan of Operation against Cantigny" and dated 17 December 1918.
Resumo:
Note to S.D. Woodruff regarding the plan of operation. First, “draw up a report showing the cost of work”. This note is unsigned, n.d.